PCD Connectathon&Showcase WG 2009-10: Difference between revisions

From IHE Wiki
Jump to navigation Jump to search
Efurst (talk | contribs)
m Action Items (Details in meeting notes): example for future reference
Efurst (talk | contribs)
 
(155 intermediate revisions by 2 users not shown)
Line 3: Line 3:
== Meeting Purpose ==
== Meeting Purpose ==
''Collaborative effort to discuss implementation and demonstration issues and preparations''
''Collaborative effort to discuss implementation and demonstration issues and preparations''
== WebEx Information ==
Topic: PCD Connectathon and Showcase Working Group
Dates: Regularly Scheduled Weekly Meetings -- Most Tuesdays, through March
Time: 2 pm, Eastern Time (New York EST, or EDT depending upon the date)
Duration: 60 Minutes


== Related Pages and Documents ==
== Related Pages and Documents ==
PCD Getting Started page with useful links http://wiki.ihe.net/index.php?title=PCD_Getting_Started
Orientation to IHE Connectathons and Showcases (demonstrations) http://www.ihe.net/north_america/flash/IHE_Educational_Webinar_Series_KickOff/IHE_Educational_Webinar_Series_KickOff.swf
Interpreting IHE Technical Frameworks http://www.ihe.net/north_america/flash/First-TimersSession_June18_2009/First-TimersSession_June18_2009.swf
Other programs in the series (including PCD's presentation on July 30)
::: Recorded: https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=EC&rID=34315407&rKey=ba21b0d7905e8ce8
::: Slided only: http://www.ihe.net/Events/webinars2009.cfm
: The first PCD Connectathon/Showcase meeting of this cycle was recorded (except for approximately the first ten minutes) and is available at https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=MC&rID=34324237&rKey=c9d66197998e5e59
HIMSS10 http://www.interoperabilityshowcase.org/
Pictures from HIMSS09 ftp://ftp.ihe.net/Patient_Care_Devices/Showcases/HIMSS2009April/Photos/
Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/
Action Items are tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en


[[PCD Pre-Connectathon Testing 2010]]  
[[PCD Pre-Connectathon Testing 2010]]  
Line 12: Line 43:
[[PCD Showcase 2010 Scenario]]
[[PCD Showcase 2010 Scenario]]


== WebEx Information ==  
HIMSS10 Website http://www.himssconference.org/
Topic: PCD Connectathon and Showcase Working Group
 
2010 North American Connectathon Overview - Important to View Periodically http://ihewiki.wustl.edu/wiki/index.php/North_America_2010
 
== Links to Trial Implementation Versions and New Directions Demo Documentation ==
 
PCD links to profiles are found at http://wiki.ihe.net/index.php?title=PCD_Profiles
 
ACM: ftp://ftp.ihe.net/Patient_Care_Devices/TechnicalFrameworkforTrialImplementation/ note work in progress at __
 
DEC: ftp://ftp.ihe.net/Patient_Care_Devices/TechnicalFrameworkforTrialImplementation/
 
DPI: http://wiki.ihe.net/index.php?title=DPI#Overview
 
IDCO: ftp://ftp.ihe.net/Patient_Care_Devices/Profiles/IDCO
 
MEM: link available at http://wiki.ihe.net/index.php?title=PCD_MEM_WP_Discussion
 
PIV: link to last TI at ftp://ftp.ihe.net/Patient_Care_Devices/TechnicalFrameworkforTrialImplementation/, and CPs available at http://wiki.ihe.net/index.php?title=PCD_Pump_2009-07-22_WebEx
 
RTM: ftp://ftp.ihe.net/Patient_Care_Devices/TechnicalFrameworkforTrialImplementation/ note that the latest versions of the tables are at __
 
== Action Items (Details in meeting notes) ==


Dates: Most __days, October through April
Action Items are tracked on a Google Doc page:  


Time: _ pm, Eastern Time (New York )
http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en


Duration: 60 Minutes


== Proposed Agendas July, 2009 ==  
== July, 2009 Meetings ==  


'''1 First meeting [[PCD Connectathon&Showcase 2009-__-08 Webex]]''', potential agenda items:
'''1 First meeting July 30, 3 pm EDT [[PCD Connectathon&Showcase 2009-07-30 Webex]]''',  
::* Introductions
::* Review of meeting purpose
:::* Consideration of Wiki page(s) for minutes, action items, Scenario (e.g., one page or one page per meeting)
::* Summary of preparation process
::* Development of a calendar
:::* Mandatory workshop Oct. 29-31
::* List of profiles, actors
::* Brief description of the MWB and its uses
:::* Reminder of MWB tutorial Oct. 10
::* Review of testing concepts developed to date
::* Developing Scenario(s)
:::* Process, timetable, tools


meeting PCD Connectathon&Showcase 2009-02-11 Webex [[PCD Connectathon&Showcase 2009-02-11 Webex]]
This meeting was recorded (except for approximately the first ten minutes) and is available at https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=MC&rID=34324237&rKey=c9d66197998e5e59


Potential agenda items:


'''Please add to the list'''
:* Introduction of Participating Companies and Profiles/Actors (spreadsheets)
::- Developing a list of companies, contacts, profiles, actors - survey
::- Companies must be IHE members
:* Introduction to this cycle ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010ConnectathonAndShowcaseWGMaterials/
:* Review of WG purpose - collaboration, cooperation, facilitation
:* WG documentation - Wiki page(s) for minutes, action items, Scenario (e.g., one page or one page per meeting)
:* Summary of preparation process
:* Development of a schedule [[PCD_Schedule]]
:* IHE Webinars - instead of F2F
::- Aug. 28 repeat of June 11 Kick Off with reduced old material and addition of HITSP profiles
:* Technical development
::- Brief description of the MWB and its uses
::- Pre-Connectathon, Virtual Connectathon, Connectathon testing
::- NIST's support
::- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/
::- RTM compliance required/desired
:* Intro to Showcase Process
::- Design of structure
::- Pictures from HIMSS09 ftp://ftp.ihe.net/Patient_Care_Devices/Showcases/HIMSS2009April/Photos/
::- Developing Scenario(s)
:::- PCD will likely have multiple tours
:* Last year's experience, lessons learned
::- Orientation, mentoring of those new to the process
::- Coordination between technical and marketing folk
:* Establish regular meeting dates
:* Initial Action Items


''Establish Initial Action Items'''
: Action Items
: Action Items
:
:
: Issues and questions about:
:* Orientation for companies joining for the first time
:* Connectathon Planning
::- MWB training
::- Status report on tests for Connectathon
::- NIST validation


::* HL7 coding
::: - EUI-64
::* Kudu, Connectathon, Showcase
::* Any discrepancies on tests
:
:
: Connectathon Planning
: Showcase Planning
::* Status report on tests for Connectathon
::* Scenario
::: - Wiki page is available for recording Virtual Connectathon results
: Timeline
::: - Can you test with two patients' data (e.g., two beds, two ARs or one AR with two patients)?


::* NIST validation of RTM
== August 2009 Meetings ==
 
'''Agenda  Second meeting August 11, 3 pm EDT [[PCD Connectathon&Showcase 2009-08-11 Webex]]'''
 
:* Participating Companies and Profiles/Actors (spreadsheets)
::- Update of list of companies, contacts, profiles, actors - survey
::- Companies must be IHE members
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2009-07-30 Webex]]
:* Last year's experience, lessons learned
::- Connectathon  ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/
::- Showcase  ftp://ftp.ihe.net/Patient_Care_Devices/Showcases/HIMSS2009April/
::- Orientation, mentoring of those new to the process
::- Coordination between technical and marketing folk
:* Development of a schedule [[PCD_Schedule]] Connectathon and Showcase detail will be a work in process: Timeline [[PCD_Connectathon%26Showcase_WG_2009-10#2009-10_Calendar]]
::- Message Workbench Training - scheduling tutorials with Peter Rontey (VA)
::- PCD F2F October 5-9
:* IHE Webinars - instead of F2F
::- PCD Presentation Recorded: https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=EC&rID=34315407&rKey=ba21b0d7905e8ce8
::- N A Connectathon Process Aug. 28 http://www.ihe.net/Events/webinars2009.cfm
:* Technical development
::- Brief description of the MWB and its uses
::- Pre-Connectathon, Virtual Connectathon, Connectathon testing
::- NIST's support
::- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/
::- RTM compliance required/desired
:* Action Items are tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
:* Would it be sufficient to have the agenda on the higher level page (PCD Connectathon&Showcase WG 2009-10)?
:
 
'''Future Agenda Topics to include'''
 
* Connectathon: EUI-64 and RTM
 
* Showcase: Lessons Learned
:
:
: Showcase Planning
:
::* Scenario update
'''Agenda  Third meeting August 18, 3 pm EDT [[PCD Connectathon&Showcase 2009-08-18 Webex]]'''
::* System Assignments - identifying your partners,
 
::: - Tours - rethinking the concepts
:* Participating Companies and Profiles/Actors (spreadsheets)
::* Showcase Internet connections
::- Update of list of companies, contacts, profiles, actors - survey
::* Showcase Virtual Connectathon and Rehearsal at the Connectathon
::- Companies must be IHE members
::* Monitoring progress, issues through the rest of the process
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2009-08-11 Webex]]
::: - Risk Assessment
:* DOR ability to access ADT (PIB)
::: -Wiki page for Scripts
::- PDQ - straight forward addition of this ITI Profile
::- PAM - option to use a "fat free" portion of PAM by referencing specific transactions
:* Showcase - New Paradigm - going on from last week and ftp://ftp.ihe.net/Patient_Care_Devices/Showcases/HIMSS2009April/
:* Coordination between technical and marketing folk
:* Development of a schedule [[PCD_Schedule]] Connectathon and Showcase a work in process: Timeline [[PCD_Connectathon%26Showcase_WG_2009-10#2009-10_Calendar]]
::- Message Workbench Training - scheduling tutorials with Peter Rontey (VA)
::- PCD F2F October 5-9
:* IHE Webinars - instead of F2F - reminder
::- PCD Presentation Recorded: https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=EC&rID=34315407&rKey=ba21b0d7905e8ce8
::- N A Connectathon Process Aug. 28 http://www.ihe.net/Events/webinars2009.cfm
:* Connectathon: EUI-64 and RTM
::- RTM compliance required/desired
::- EUI-64 required/desired
:* Technical development
::- Brief description of the MWB and its uses
::- Pre-Connectathon, Virtual Connectathon, Connectathon testing
:::o Review last year's Pre-Connectathon Tests, new Pre-Connectathon tests for IDCO
::- NIST's support
::- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/
:* Action Items are tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
:
:
'''Agenda  Fourth meeting August 25, 3 pm EDT [[PCD Connectathon&Showcase 2009-08-25 Webex]]'''
'''preliminary, based upon previous meeting; placeholder; please add'''
 
:* Participating Companies and Profiles/Actors (spreadsheets)
::- Update of list of companies, contacts, profiles, actors - survey
::- Companies must be IHE members
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2009-08-18 Webex]]
::- Request for notetaker(s)
:* DOR ability to access ADT (PIB)- PAM
:* PCD F2F October 5-9 - Reminder
:* IHE Webinars - instead of F2F - reminder
:* Action Items are tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
:* Review of last year's DEC Pre-Connectathon Tests


::* Showcase Structure
== September 2009 Meetings ==
::: - Drawings, only minor changes are required
:
::: - Utilities (electric, network)
'''Agenda  Fifth meeting September 1, 3 pm EDT [[PCD Connectathon&Showcase 2009-09-01 Webex]]'''
::: - Physical requirements (size, mounts if larger, etc)
'''preliminary, based upon previous meetings; placeholder; please add'''
::: - Logos -  
::: - Signs thanking supporters


: Timeline
:* Participating Companies and Profiles/Actors (spreadsheets)
::* Steve's new list: http://ihewiki.wustl.edu/wiki/index.php/North_America_2009
::- Update of list of companies, contacts, profiles, actors - survey
::- Companies must be IHE members
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2009-08-25 Webex]]
:* DOR ability to access ADT (PIB)
::- PDQ - straight forward addition of this ITI Profile
::- PAM - option to use a "fat free" portion of PAM by referencing specific transactions
:* Showcase - New Paradigm - going on from last week and ftp://ftp.ihe.net/Patient_Care_Devices/Showcases/HIMSS2009April/
:* Coordination between technical and marketing folk
:* Development of a schedule [[PCD_Schedule]] Connectathon and Showcase a work in process: Timeline [[PCD_Connectathon%26Showcase_WG_2009-10#2009-10_Calendar]]
::- Message Workbench Training - scheduling tutorials with Peter Rontey (VA)
::- PCD F2F October 5-9
::- Review, update PIV Pre-Connectathon Tests
::- Develop IDCO Pre-Connectathon Tests
::- Otehr
:* IHE Webinars - instead of F2F - reminder
::- PCD Presentation Recorded: https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=EC&rID=34315407&rKey=ba21b0d7905e8ce8
::- N A Connectathon Process Aug. 28 http://www.ihe.net/Events/webinars2009.cfm
:* Connectathon: EUI-64 and RTM
::- RTM compliance required/desired
::- EUI-64 required/desired
:* Technical development - reminder
::- Brief description of the MWB and its uses
::- Pre-Connectathon, Virtual Connectathon, Connectathon testing
::- NIST's support
::- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/
:* Action Items are tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
:
|
:
'''Agenda Sixth meeting September 8, 3 pm EDT [[PCD Connectathon&Showcase 2009-09-08 Webex]]'''


:* Review Discussion Summaries: [[PCD Connectathon&Showcase 2009-08-25 Webex]], [[PCD Connectathon&Showcase 2009-09-01 Webex]]


18 16th regular meeting PCD Connectathon&Showcase 2009-02-18 Webex [[PCD Connectathon&Showcase 2009-02-18 Webex]]
:* DOR ability to access ADT (PIB) - Grouped and Non-Grouped actors
::- PDQ - straight forward addition of this ITI Profile
::- PAM - straight forward addition of this ITI Profile
::- PAM Lite -  new name for "fat free" portion of PAM referencing specific transactions
:* PIV Grouped and Non-Grouped DEC actors
:* Other technical developments
::- Brief description of the MWB and its uses
::- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/
::- Pre-Connectathon, Virtual Connectathon, Connectathon testing
::- NIST's support
:* IHE Webinars - instead of F2F - reminder
::- PCD Presentation Recorded: https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=EC&rID=34315407&rKey=ba21b0d7905e8ce8
::- N A Connectathon Process Aug. 28 http://www.ihe.net/Events/webinars2009.cfm
:* Connectathon
::- Registration for Connectathon and Showcase is open until the end of the month
::- Participating Companies and Profiles/Actors (spreadsheets)
::- Update of list of companies, contacts, profiles, actors - survey
::- Companies must be IHE members
::- Recruiting additional companies as full participants and recruiting for New Directions
::- RTM compliance required/desired
::- EUI-64 required/desired
:* Showcase - Update on New Paradigm
:* Coordination between technical and marketing folk
:* Development of a schedule [[PCD_Schedule]] Connectathon and Showcase a work in process: Timeline [[PCD_Connectathon%26Showcase_WG_2009-10#2009-10_Calendar]]
::- Message Workbench Training - scheduling tutorials with Peter Rontey (VA)
::- PCD F2F October 5-9 - please RSVP and make hotel reservations
::- Review, update PIV Pre-Connectathon Tests
::- Develop IDCO Pre-Connectathon Tests
::- Other
:* Action Items are tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
:
|
:


'''Please add to the list'''
'''Agenda Seventh meeting September 15, 3 pm EDT [[PCD Connectathon&Showcase 2009-09-15 Webex]]'''


: Action Items
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2009-09-08 Webex]]
:* New Google Group for IDCO
:* DOR ability to access ADT (PIB) - Grouped and Non-Grouped actors
::- PDQ - straight forward addition of this ITI Profile
::- PAM - straight forward addition of this ITI Profile
::- PAM Lite - select new name for "fat free" portion of PAM referencing specific transactions
:* PIV Grouped and Non-Grouped DEC actors
:* CPs developed as we progress from here: assure all are on the same page, save CP submission until March
:* Other technical developments
::- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/
::- Pre-Connectathon, Virtual Connectathon, Connectathon testing
::- NIST's support
:* Connectathon
::- Registration for Connectathon and Showcase is open until the end of the month
::- Participating Companies and Profiles/Actors (spreadsheets)
::- Correction - companies NEED NOT be IHE members
::- Recruiting additional companies as full participants and recruiting for New Directions
:* Showcase - Update on New Paradigm
:* Coordination between technical and marketing folk
:* Development of a schedule [[PCD_Schedule]] Connectathon and Showcase a work in process: Timeline [[PCD_Connectathon%26Showcase_WG_2009-10#2009-10_Calendar]]
::- Message Workbench Training - scheduling tutorials with Peter Rontey (VA)
:::o MWB files are at ftp://ftp.ihe.net/Patient_Care_Devices/Tools/MWB/MWB%20v%201.6.8.2/
::- PCD F2F October 5-9 - please RSVP and make hotel reservations
::- Review, update PIV Pre-Connectathon Tests
::- Develop IDCO Pre-Connectathon Tests
::- Other
:* Action Items are tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
:
:
:: Issues and questions about:
|
::* Monroe experienced a time out problem with the MWB.
 
::* Appropriate dosing units for drugs
'''Agenda Eighth meeting September 22, 3 pm EDT [[PCD Connectathon&Showcase 2009-09-22 Webex]]'''
::* HL7 coding
 
::: - EUI-64
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2009-09-15 Webex]]
::* Kudu, Connectathon, Showcase
:* New Google Group for IDCO
::* Any discrepancies on tests
:* DOR ability to access ADT (PIB) - Grouped and Non-Grouped actors
::- PDQ - straight forward addition of this ITI Profile
::- PAM - straight forward addition of this ITI Profile
::- PAM Lite - select new name for "fat free" portion of PAM referencing specific transactions
:* PIV Grouped and Non-Grouped DEC actors
:* CPs developed as we progress from here: assure all are on the same page, save CP submission until March
:* Other technical developments
::- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/
::- Pre-Connectathon, Virtual Connectathon, Connectathon testing
::- NIST's support
:* Connectathon
::- Registration for Connectathon and Showcase is open until the end of the month
::- Participating Companies and Profiles/Actors (spreadsheets)
::- Correction - companies NEED NOT be IHE members
::- Recruiting additional companies as full participants and recruiting for New Directions
::- Pre-Connectathon Tests
:::o MWB and NIST Test Tools - availability, scope, requirements
::::+ Please post ASAP to assist your test partners
:* Showcase - Update on New Paradigm
:* Coordination between technical and marketing folk
:* Development of a schedule [[PCD_Schedule]] Connectathon and Showcase a work in process: Timeline [[PCD_Connectathon%26Showcase_WG_2009-10#2009-10_Calendar]]
::- Message Workbench Training - scheduling tutorials with Peter Rontey (VA)
:::o MWB files are at ftp://ftp.ihe.net/Patient_Care_Devices/Tools/MWB/MWB%20v%201.6.8.2/
::- PCD F2F October 5-9 - please RSVP and make hotel reservations
::- Review, update PIV Pre-Connectathon Tests
::- Develop IDCO Pre-Connectathon Tests
::- Other
:* Action Items are tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
:
:
: Connectathon Planning
|
::* Status report on tests for Connectathon
 
::* Schedule - set up begins Monday at 8, testing at 10 am
'''Agenda Ninth meeting September 29, 3 pm EDT [[PCD Connectathon&Showcase 2009-09-29 Webex]]'''
::* NIST validation of RTM
'''changes welcome'''
::* Dress code
 
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2009-09-22 Webex]]
:* Connectathon Kudu registration and HIMSS10 indications
:* Remaining ADT Issues
:* Update on Grouped and Non-Grouped actors
:* Update: Assuring CPs developed as we progress are adopted by all developers affected.
:* Other technical developments
::- Availability of this year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/
::- Pre-Connectathon, Virtual Connectathon, Connectathon testing
::- Message Workbench Training - tutorial Oct. 2 with Peter Rontey (VA)
:::o MWB files are at ftp://ftp.ihe.net/Patient_Care_Devices/Tools/MWB/MWB%20v%201.6.8.2/
::- NIST's test tools
:::o Tutorial following F2F
::- Update on Pre-Connectathon Tests
:* Connectathon
::- Registration for Connectathon and Showcase is open until the end of the month
::- Participating Companies and Profiles/Actors (spreadsheets)
::- Recruiting additional companies as full participants and recruiting for New Directions
:* Showcase - Update
:* [[PCD_Schedule]] Connectathon and Showcase a work in process: Timeline [[PCD_Connectathon%26Showcase_WG_2009-10#2009-10_Calendar]]
::- PCD F2F October 5-9 - please RSVP and make hotel reservations
:* Other
:* Action Items are tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
:
:
: Showcase Planning
|:
::* Scenario update
::* System Assignments - identifying your partners,
::: - Tours - rethinking the concepts
::* Showcase Internet connections
::* Showcase Rehearsal at the Connectathon
::* Monitoring progress, issues through the rest of the process
::: - Risk Assessment
::: -Wiki page for Scripts:
: Showcase Planning
::* Scenario update
::* System Assignments - identifying your partners,
::: - Tours - rethinking the concepts
::* Showcase Internet connections
::* Showcase Rehearsal at the Connectathon
::* Monitoring progress, issues through the rest of the process
::: - Risk Assessment
::: -Wiki page for Scripts
::* Dress code


::* Showcase Structure
== October 2009 Meetings ==
::: - Drawings
:  
::: - Logos
|
::: - Signs thanking supporters


: Timeline
'''Agenda - Special Tenth meeting  - October 2, 11 am EDT [[PCD Connectathon&Showcase 2009-10-02 Webex]]'''
::* Steve's new list: http://ihewiki.wustl.edu/wiki/index.php/North_America_2009
'''Message Workbench Training with Peter Rontey of the VA'''
:
:
|
:
'''Agenda Eleventh meeting October 13, 3 pm EDT [[PCD Connectathon&Showcase 2009-10-13 Webex]]'''


19 Special Meeting to Discuss Scenario Friday, February 20 11 am EST
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2009-09-29 Webex]]
:* Connectathon Kudu registration and HIMSS10 indications
:* Issues with Profile TIs, MWB item - from participants
:* Remaining ADT Issues
:* Update on Grouped and Non-Grouped actors
:* Update: Assuring CPs developed as we progress are adopted by all developers affected.
:* Other technical developments
::- Availability of this year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/
::- Pre-Connectathon, Virtual Connectathon, Connectathon testing
::- Message Workbench Training - Part I tutorial Oct. 2 with Peter Rontey (VA) is not available
::- MWB Training - Part II tutorial Oct. 16 at 11 am EDT
:::o MWB files are at ftp://ftp.ihe.net/Patient_Care_Devices/Tools/MWB/MWB%20v%201.6.8.2/
::- NIST's test tools
:::o Tutorial October 19 11 am EDT
::- Update on Pre-Connectathon Tests
:* Connectathon
::- Registration for Connectathon and Showcase closed
::- Participating Companies and Profiles/Actors (spreadsheets)
::- Recruiting additional companies as full participants and recruiting for New Directions
:* Showcase - Update
:* [[PCD_Schedule]] Connectathon and Showcase a work in process: Timeline [[PCD_Connectathon%26Showcase_WG_2009-10#2009-10_Calendar]]
:* Other
:* Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
|:


== Proposed Agendas March 2009 ==
'''Agenda Special Twelfth meeting - MWB Tutorial Part II October 16'''
:* Meeting was recorded. The link is posted above.


20 17th regularly scheduled meeting PCD Connectathon&Showcase 2008-03-04 Webex [[PCD Connectathon&Showcase 2009-03-04 Webex]]
'''Agenda Special Thirteenth meeting - NIST Test Tools Tutorial October 19'''
:*
 
'''Agenda Fourteenth Meeting October 20, 3 pm EDT [[PCD Connectathon&Showcase 2009-10-20 Webex]]'''
 
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2009-10-13 Webex]]
:* The Wiki page [[PCD Pre-Connectathon Testing 2010]] provides an introduction, overview and useful links related to the PCD Pre-Connectathon process.
::- How to post results from NIST and Virtual Connectathon tests TBD
::- Post Successfully Tested Messages with explanatory README files as needed. Each system has a distinct folder under each profile implemented. Please post sending messages as early as possible. The Virtual Connectathon tests will use the Internet unless firewall issues prevent these tests. In that case these tested, posted, messages will substitute from the sending systems.
::- ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/
::- Test results are due December 1; however Thanksgiving is November 26; for many the effective deadline is November 25.
:* Connectathon Kudu registration and HIMSS10 indications
::- Your electrial requirements should be sent directly to the contractor at the hotel. There is a service kit with that information available at http://www.ihe.net/north_america/connectathon_na2010_participants.cfm
:* Issues with Profile TIs, MWB item - from participants
:* Remaining ADT Issues
:* Update on Grouped and Non-Grouped actors
:* Update: Assuring CPs developed as we progress are adopted by all developers affected.
:* Other technical developments
::- NIST's test tools - slides, recordings
:* Connectathon
::- Registration for Connectathon and Showcase closed - any issues remaining?
::- Excel Status Workbook
:* Showcase - Update
::- Task Force Report
:* [[PCD_Schedule]] Connectathon and Showcase a work in process: Timeline [[PCD_Connectathon%26Showcase_WG_2009-10#2009-10_Calendar]]
:* Other
:* Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
:
|:


: Action Items
:
:
: Lessons learned leading up to and through the Connectathon
'''Agenda Fifteenth Meeting October 27, 3 pm EDT [[PCD Connectathon&Showcase 2009-10-27 Webex]]'''
::* Pre-Connectathon process and tests
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2009-10-20 Webex]]
::* Virtual Connectathon process and tests
::- How to post results from NIST and Virtual Connectathon tests
::* Connectathon process and tests
::- Post Successfully Tested Messages with explanatory README files as needed. Each system has a distinct folder under each profile implemented. Please post sent messages as early as possible.
::* Change proposals
:* The Virtual Connectathon tests will use the Internet unless firewall issues prevent these tests. In that case tested, posted, messages will substitute for the sending systems.
: Issues and questions about:
::- ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/
::* HL7 coding
:* MWB Part 1 Tutorial this Friday, 11 am EDT.
::: - EUI-64
:* Issues with Profile TIs, MWB and NIST test tools - from participants
::* RTM update
:* Wireless communications at the Connectathon and Showcase
::* NIST validation of RTM
::- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
::- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
:* Remaining ADT Issues
:* Other technical developments
:* Connectathon
::- Excel Status Workbook
:* Showcase - Update
::- Task Force Report
:* Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
:* Other
:
:
: Showcase Planning
'''Agenda Special Sixteenth meeting - MWB Tutorial Part I October 30'''
::* Scenario update
:* Meeting was recorded. The link is posted above.
::: - Parameter identification, values
::* System Assignments - identifying your partners
::: - Shared equipment list - monitors, IV poles
::* Docents - to provide one docent for each wall we need more docents
::* Dress at the Showcase - role play?
::* Showcase Internet connections
::* Showcase Rehearsal at the Connectathon


::* Showcase Structure
== November 2009 Meetings ==
::: - Drawings
'''Agenda Seventeenth Meeting November 3, 3 pm EDT [[PCD Connectathon&Showcase 2009-11-03 Webex]]'''
::: - Logos


21 18th regularly scheduled meeting PCD Connectathon&Showcase 2008-03-11 Webex [[PCD Connectathon&Showcase 2009-03-11 Webex]]
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2009-10-27 Webex]]
: Showcase Planning
:
::* Scenario update
Pre-Connectathon Tests
::: - Parameter identification, values
:* Status of test documents
::* System Assignments - identifying your partners
::- PIV, IDCO out for review
::: - Shared equipment list - monitors, IV poles
::- DEC, ACM updates by Monday; no major changes expected
::* Docents - to provide one docent for each wall we need more docents
::- RTM compliance anticipated; no negative responses received
::* Dress at the Showcase - role play?
:* Questions about posting results on Kudu, PCD ftp site (results from MWB testing)
::* Showcase Internet connections
::- Post Successfully Tested Messages with explanatory README files as needed. Each system has a distinct folder under each profile implemented. Please post sending messages as early as possible. The Virtual Connectathon tests will use the Internet unless firewall issues prevent these tests. In that case these tested, posted, messages will substitute from the sending systems.
::* Showcase Rehearsal at the Connectathon
::- To upload: Obtain access to the ftp site from the project manager.
::- ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/
:* Update on NIST and Virtual Connectathon tests
:* MWB Part 1 Tutorial last Friday, recording available
:* Issues with Profile TIs, MWB item - from participants
:* Remaining ADT Issues
:* Other technical developments
:
Connectathon
:* Wireless communications at the Connectathon and Showcase
::- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
::- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
:* Excel Status Workbook
:* New Directions ACM testing at the Connectathon - set data
:* Continua testing at the Connectathon  
:
Showcase - Update
:* Task Force Update
::- Meeting yesterday
::- Scheduling weekly meetings
:* Continua link to PCD
:
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
:
:
: Issues and questions about:
Other
::* HL7 coding
::: - EUI-64
::* RTM update
::* NIST validation of RTM
:
:
::* Showcase Structure
'''Agenda Eighteenth Meeting November 10, 3 pm EDT [[PCD Connectathon&Showcase 2009-11-10 Webex]]'''
::: - Drawings
 
::: - Logos
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2009-11-03 Webex]]
:Pre-Connectathon Tests
::- One document for PIV and one for IDCO have been out for review and significant changes made during multiple iterations. The IOC Pre-Connectathon tests have been distributed and posted. The IDCR should be finalized this week.
::- DEC, ACM updates were anticipated by Monday and are delayed; no major changes expected. The latest versions are:
::: DEC: Last year's tests are available in this year's folder; Manny to review once more.
::: ACM: Last year's tests are available in this year's folder; Manny to review once more.
::- Grouped PIB actors - testing and Integration Statement documentation as grouped actors
::- RTM compliance anticipated; EUI-64 vendor portion - values requested
:* Questions about posting results on Kudu, PCD ftp site (results from MWB testing) - password and instructions available
::- Post Successfully Tested Messages with explanatory README files as needed. Each system has a distinct folder under each profile implemented. Please post sending messages as early as possible. The Virtual Connectathon tests will use the Internet unless firewall issues prevent these tests. In that case these tested, posted, messages will substitute from the sending systems.
::- ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/
:* Update on NIST and Virtual Connectathon tests
:* Issues with Profile TIs, MWB item - from participants
:* Remaining ADT Issues
::- Volunteer need to submit a CP for the ACK in DEC
:* Other technical developments
::- MSH-21 OID – would the OID provided in Wiki page by John Rhoads be the appropriate OID? For this year, use the OID without extension or assign one to each profile?
:Connectathon
:* Wireless communications at the Connectathon and Showcase
::- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
::- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
:* Excel Status Workbook
:Showcase - Update
:* Task Force Update
::- Scheduling weekly meetings
::- Defining the messages for each wall; the "one page" descriptions
:Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en


:Other


22 19th regularly scheduled meeting PCD Connectathon&Showcase 2008-03-18 Webex [[PCD Connectathon&Showcase 2009-03-18 Webex]]
:
 
'''Agenda Nineteenth Meeting November 17, 3 pm EDT [[PCD Connectathon&Showcase 2009-11-17 Webex]]'''
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2009-11-10 Webex]]
:Pre-Connectathon Tests
:* Status of test documents
::- PIV, IDCO out for review
::- DEC v. 3.4 issued
::- ACM updates this week; no major changes expected
::- RTM compliance anticipated; no negative responses received
:* Posting results on Kudu, PCD ftp site (results from MWB testing)
::- Post Successfully Tested Messages with explanatory README files as needed. The NIST and Virtual Connectathon test results are not posted, merely require an email to the project manager indicating success.
::- ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/
:* Waivers are available for MWB tests based upon past success with the same systems for the same tests.
:* Update on NIST and Virtual Connectathon tests
:* Issues with Profile TIs, MWB item - from participants
:* Remaining ADT Issues
:* Other technical developments
:Connectathon
:* Wireless communications at the Connectathon and Showcase
::- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
::- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
:* Excel Status Workbook
:Showcase - Update
:* MRN, Bar Code, Badges - Is MRN sufficient? No name?
:* Task Force Update
::- Meeting yesterday addressing PCD's messages, scenarios
::- Beginning design of structures; request for physical requirements
:Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
 
:Other
 
:
 
'''Agenda Twentieth Meeting November 24, 3 pm EDT [[PCD Connectathon&Showcase 2009-11-24 Webex]]'''
'''Placeholder'''
'''Placeholder'''
: Showcase Planning
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2009-11-17 Webex]]
::* Scenario update
:Pre-Connectathon Tests
::: - Parameter identification, values
:* Status of test documents
::* System Assignments - identifying your partners
::- PIV, IDCO out for review
::: - Shared equipment list - monitors, IV poles
::- DEC v. 3.4 issued
::* Docents - to provide one docent for each wall we need more docents
::- ACM updates this week; no major changes expected
::* Dress at the Showcase - role play?
::- RTM compliance anticipated; no negative responses received
::* Showcase Internet connections
:* Posting results on Kudu, PCD ftp site (results from MWB testing)
::* Showcase Rehearsal at the Connectathon
::- Post Successfully Tested Messages with explanatory README files as needed. The NIST and Virtual Connectathon test results are not posted, merely require an email to the project manager indicating success.
::- ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/
:* Waivers are available for MWB tests based upon past success with the same systems for the same tests.
:* Update on NIST and Virtual Connectathon tests
:* Issues with Profile TIs, MWB item - from participants
:* Remaining ADT Issues
:* Other technical developments
:Connectathon
:* Wireless communications at the Connectathon and Showcase
::- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
::- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
:* Excel Status Workbook
:Showcase - Update
:* Task Force Update
::- Meeting yesterday addressing PCD's messages, scenarios
::- Beginning design of structures; request for physical requirements
:Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
 
:Other
 
:
 
== December 2009 Meetings ==
 
'''Agenda Twenty-First Meeting December 1, 3 pm EST [[PCD Connectathon&Showcase 2009-12-01 Webex]]'''
 
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2009-11-24 Webex]]
:Pre-Connectathon Tests
:* Status of test documents
::- ACM issues raised by Monroe
:* Posting results on Kudu, PCD ftp site (results from MWB testing) - as soon as possible
::- Post Successfully Tested Messages with explanatory README files as needed. The NIST and Virtual Connectathon test results are not posted, merely require an email to the project manager indicating success.
::- ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/
:* Waivers are available for MWB tests based upon past success with the same systems for the same tests.
:* Update on NIST and Virtual Connectathon tests
::- Recruiting PAM, PDQ Sources
:* Issues with Profile TIs, MWB item - from participants
:* Remaining ADT Issues
:* Other technical developments
:Connectathon
:* Wireless communications at the Connectathon and Showcase
::- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
::- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
:* Excel Status Workbook
:Showcase - Update
:* New Drawings for Next Week
::- Physical requirements and utilities
:* Task Force Update
::- Meeting Friday for Pacemaker Scenario
::- Beginning design of structures; request for physical requirements
:Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
 
:Other
 
:
'''Agenda Twenty-Second Meeting December 8, 3 pm EST [[PCD Connectathon&Showcase 2009-12-08 Webex]]'''
 
:* Review of previous meeting Discussion Summaries [[PCD Connectathon&Showcase 2009-11-24 Webex]] and [[PCD Connectathon&Showcase 2009-12-01 Webex]]
:Pre-Connectathon Tests
:* ADT: Can we eliminate the need for PCD-specific PAM, PDQ sources this year?
::- Look ahead to next year
:* Update on NIST and Virtual Connectathon tests
::- Recruiting PAM, PDQ Sources
:* Issues with Profile TIs, MWB item - from participants
:* Remaining ADT Issues
:* Other technical developments
:Connectathon
:* Wireless communications at the Connectathon and Showcase
::- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
::- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
:* Excel Status Workbook - any revisions? missing contact information (cell phones)
:* Table layout, power and network requirements (e.g., more than one Ethernet IP address)
:Showcase - Update
:* Task Force Update
::- Meeting lst Friday for Pacemaker Scenario
::- Beginning design of structures; request for physical requirements
:Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
 
:Other
 
:
 
 
'''Agenda Twenty-Third Meeting December 15, 3 pm EST [[PCD Connectathon&Showcase 2009-12-15 Webex]]'''
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2009-12-08 Webex]]
:Pre-Connectathon Tests
:* Survey of Lessons Learned and Potential Improvements
:* Issues with Profile TIs, MWB item - from participants
:* Other technical developments
:Connectathon
:* Process, training, what to bring
:* Wireless communications at the Connectathon and Showcase
::- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
::- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
:* Excel Status Workbook
:* Remaining ADT Issues
 
:Showcase - Update
:* Task Force Update
:* Design of structures; request for physical requirements
 
:Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
 
:Other
 
:
 
 
'''Agenda Twenty-Fourth Meeting December 22, 3 pm EST [[PCD Connectathon&Showcase 2009-12-22 Webex]]'''
'''placeholder'''
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2009-12-15 Webex]]
:Pre-Connectathon Tests
:* Survey of Lessons Learned and Potential Improvements
:* Issues with Profile TIs, MWB item - from participants
:* Other technical developments
:Connectathon
:* Process, training, what to bring
:* Wireless and Ethernet communications at the Connectathon and Showcase
::- Contact Steve if external access is required
:* Remaining ADT Issues
 
:Showcase - Update
:* Task Force Update
:* Design of structures; request for physical requirements
 
:Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
 
:Other
 
:
 
== January 2010 Meetings ==
 
 
'''Agenda Twenty-Fifth Meeting January 5, 3 pm EST [[PCD Connectathon&Showcase 2010-01-05 Webex]]'''
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2009-12-22 Webex]]
:Pre-Connectathon Tests
:* Survey of Lessons Learned and Potential Improvements
:* Issues with Profile TIs, MWB item - from participants
:* Other technical developments
:Connectathon
:* Process, training, what to bring
:* Wireless and Ethernet communications at the Connectathon and Showcase
::- Contact Steve if external access is required
:* Remaining ADT Issues
:Showcase - Update
:* Task Force Update
:* Design of structures; request for physical requirements
:* Showcase schedule from move in to tear down
 
:Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
 
:Other
 
:
 
'''Agenda Twenty-Sixth Meeting January 19, 3 pm EST [[PCD Connectathon&Showcase 2010-01-19 Webex]]'''
 
:* Review of previous meeting Discussion Summaries [[PCD Connectathon&Showcase 2010-01-05 Webex]], [[PCD Connectathon&Showcase 2009-12-22 Webex]]
 
:Pre-Connectathon Tests
:* Survey of Lessons Learned and Potential Improvements
::- Comments on Pre-Connectathon Tests looking back (number, relevance, etc.)
:* Issues with Profile TIs, MWB item - from participants
::- Survey Monkey and discussion
:* Other technical developments
 
:Connectathon
:* Lessons Learned and Potential Improvements
::- Survey Monkey and discussion
 
: Showcase
:* Bar Code and Patient IDs
:* Task Force Update - Snapshot Forms, Scripts, Other Items
:* Design of structures - request for physical requirements, other changes
 
:Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
 
:Other
 
 
'''Agenda Twenty-Seventh Meeting January 25, 10 am EST [[PCD Connectathon&Showcase 2010-01-25 Webex]]'''
 
:* Review of previous meetings' Discussion Summaries [[PCD Connectathon&Showcase 2009-12-22 Webex]], [[PCD Connectathon&Showcase 2010-01-05 Webex]], [[PCD Connectathon&Showcase 2010-01-19 Webex]]
:Pre-Connectathon and Connectathon Tests and Processes
:* Review wall assignments, snapshots and block diagrams Walls 1, 2 to assure all systems  are represented and
::- assure that multiple instances of vendors can be supported where needed
:* Review and edit the Snapshot document for at least Walls 1, 2
:* Review the “stories” (clinical and technical story outlines)
:* Review titles, theme – one theme for all walls, two sentence descriptors
:* Review posters Walls 1, 2
::- Posters for HIMSS production are due in final form Thursday for Manny to send Friday
:* Solicit volunteers to develop the docent scripts
::- Will docents wear white coats?
 
:Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
:Other
 
:
:
: Issues and questions about:
 
::* HL7 coding
'''Agenda Twenty-Eighth Meeting January 26, 3 pm EST [[PCD Connectathon&Showcase 2010-01-26 Webex]]'''
::: - EUI-64
 
::* RTM update
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2010-01-19 Webex]]
::* NIST validation of RTM
:* Review wall assignments, snapshots and block diagrams Walls 3,4 to assure all systems  are represented and
::- assure multiple instances of vendors can be supported
:* Review and edit the Snapshot document for at least Walls 3, 4
:* Review the “stories” (clinical and technical story outlines)
::- Review titles, theme – one theme for all walls, two sentence descriptors
:* Review posters Walls 3, 4
::- Posters for HIMSS production are due in final form Thursday for Manny to send Friday
::- What size should the posters be?
::- What size should the posters be?
:* Review posters for top banners (all 4 walls) and logos
:* Solicit volunteers to develop the docent scripts
:* Patient IDs, MRNs, bar codes
 
:Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
:Other
 
:
:
::* Showcase Structure
::: - Drawings
::: - Logos


== February 2010 Meetings ==


23 Docent Review of Script 2008-03-25
'''Agenda Twenty-Ninth Meeting February 2, 3 pm EST [[PCD Connectathon&Showcase 2010-02-02 Webex]]'''
:* Met to review and update the script.


24 20th regularly scheduled meeting PCD Connectathon&Showcase 2008-03-25 Webex [[PCD Connectathon&Showcase 2009-03-25 Webex]]
:* Review of previous meetings Discussion Summaries [[PCD Connectathon&Showcase 2009-12-15 Webex]], [[PCD Connectathon&Showcase 2009-12-22 Webex]], [[PCD Connectathon&Showcase 2010-01-05 Webex]], [[PCD Connectathon&Showcase 2010-01-19 Webex]], [[PCD Connectathon&Showcase 2010-01-25 Webex]],[[PCD Connectathon&Showcase 2010-01-26 Webex]]


: Action Items
: Showcase
:* Question: Any MUST CHANGE issues with Walls 1-3 Snapshots?
:* Question: When may we expect remaining posters?
:* Review block diagrams
::- Select among ACM options
:* Review docent scripts
::- Scripts should refer to other walls, meaningful use
:* Call for review of network and IP requirements (use the existing spreadsheet)
:* Docent recruitment
:* AAMI Mini-Showcase (next week?)
 
:Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
:Other


:
:
: Showcase Planning
 
::* Handouts
'''Agenda Thirtieth Meeting February 9, 3 pm EST [[PCD Connectathon&Showcase 2010-02-09 Webex]]'''
::: - Contents
 
::: - Final March 24
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2010-02-02 Webex]]
::* Scenario update
 
::: - Parameter identification, values
: Showcase
::* GE Enterprise virtual testing
:* Question: Any MUST CHANGE issues with Walls 1-3 Block Diagrams, Snapshots?
::: - Contingency Planning
::- Wall 3: Cerner for Hill-Rom interface, add AR to pumps' support
::* IEEE video and interviews
::- Wall 4: Epic EMR with IOP, no bed, LiveData clinical workflow alarm, Amcom, ...
::* Docents - we have a sufficient number; more docents would reduce workload on those who have volunteered
:* Posters were printed yesterday. Question: When may we expect remaining posters?
::* Dress at the Showcase - white coats, stethoscopes
:* Review docent scripts, availability
::* Showcase Internet connections
::- Docent rehearsals next week - Doodle survey
::* Showcase Rehearsal at the Connectathon
::- Scripts should refer to other walls, meaningful use
::: - Schedule a reading for docents and rehearsals
:* Call for review of network and IP requirements (use the existing spreadsheet)
::* Showcase Structure
:* Docent recruitment update
::: - Drawings
:* AAMI Mini-Showcase - initial expression of interest, update on effort
::: - Logos
 
::: - New Directions Wall - contents
:Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
:Other
 
:
:


== Proposed Agendas April 2009 ==
'''Agenda Thirty First Meeting February 16, 3 pm EST [[PCD Connectathon&Showcase 2010-02-16 Webex]]'''
24 21st regularly scheduled meeting PCD Connectathon&Showcase 2008-04-01 Webex [[PCD Connectathon&Showcase 2009-04-01 Webex]]
 
'''Placeholder'''
:* Review of previous meeting Discussion Summary [[PCD Connectathon&Showcase 2010-02-02 Webex]]
: Action Items
 
: Showcase
:* Walls 1-4 Snapshots with Block Diagrams
:* Floor plan
:* Walls - update on design
:* Posters were printed; additional posters to go to Elli
:* Handouts to printer today
::- CABG or Trauma?
::- Resources on back of business card
::- Other
:* Review docent scripts, availability
::- Docent rehearsals schedule
::- Scripts should refer to other walls, meaningful use
:* Handouts to printer; PDF available for participant use
:* AAMI Mini-Showcase - initial expression of interest, update on effort
:* Lessons learned from Showcase experience
:* Next meetings
::- Next Tuesday
::- Following HIMSS10 or a week for recovery first?
 
:Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
:Other
 
:
:
: Showcase Planning
 
::* Handouts
'''Agenda Thirty Second Meeting February 23, 3 pm EST [[PCD Connectathon&Showcase 2010-02-23 Webex]]'''
::* Scenario update
 
::* GE Enterprise virtual testing
: Showcase
::: - Contingency Planning
:* Review docent scripts, availability
::* IEEE video and interviews
::- Docent schedule at HIMSS10
::* Docents
::- Docent rehearsals schedule
::* Dress at the Showcase - white coats, stethoscopes
::- Scripts should refer to other walls, meaningful use
::* Showcase Rehearsal at the Connectathon
:* Handouts
::: - Schedule rehearsals
:* Lessons learned from Showcase experience
::* Showcase Structure
:* AAMI Mini-Showcase - initial expression of interest, update on effort
::: - Drawings
 
::: - Logos
:Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
::: - New Directions Wall - contents
:Other
 
:
:


== March 2010 Meetings ==


25 22nd regularly scheduled meeting PCD Connectathon&Showcase 2008-04-15 Webex [[PCD Connectathon&Showcase 2009-04-15 Webex]]
'''Agenda Thirty Third Meeting March 16, 3 pm EDT [[PCD Connectathon&Showcase 2010-03-16 Webex]]'''


: Showcase Planning
:* Review of previous meetings Discussion Summaries [[PCD Connectathon&Showcase 2010-02-23 Webex]],
::* Lessons Learned
:* Develop HIMSS11 Concepts: number, type of profiles/systems; number, type of stories; size and shape of structure
::: - Process post Connectathon
:* Begin developing Mini-Showcase at AAMI: companies, systems, concepts
::: - Development of Script
:* Next Meeting
::: - Development of Handouts
 
::: - Preparation and implementation on site, including docent preparation
 
::* PCD Showcase Concept for 2010
'''Agenda Thirty Fourth Meeting March 23, 3 pm EDT [[PCD Connectathon&Showcase 2010-03-23 Webex]]'''
::: - Integration with other domains/profiles
 
::: - Physical structure
:* Review of previous meetings Discussion Summaries [[PCD Connectathon&Showcase 2010-03-16 Webex]],
::: - Docents, tours
:* Continue HIMSS11 Discussion; the following along with the spreadsheet reflects the last meeting’s comments.
::* Other
 
'''HIMSS11 (Continued):'''
:* Identify profiles likely to be demonstrated.
::- Which profiles will be shown on each wall?
::- Which stories lend themselves to integration with other IHE Domains or other transactions? The attached spreadsheet reflects last week’s discussion.
:* Estimate the number of vendors for each profile.
::- For PCD, alternating vendors in a story/tour needs to be minimized. E.g., if we have 5 pump vendors or 5 ACM AC vendors, how many can be used simultaneously in a single story?
:* How many “walls” might be needed?
:* From Gary:
::- Act 3 Care theme Emergency Care---PCD emergency room setting feeds info to EMR or the scenario could feed into a PCD OR or ICU setting;
::- Act 6 Care theme Chronic Care—patient condition does not improve CHF secondary to heart valve deterioration. Patient scheduled for surgery—moved to PCD surgery scenario;
::- Act 24 Care Theme Clinical Decision support—stroke patient is directly admitted to the PCD ICU.
::- Just some suggested based on last year. Would a wall not a cube be better? If PCD is on the outside, as we have been, the wall will represent ED, Surgery, ICU maybe step down. A closet for the infrastructure stretches behind the units.
::- Other option is a centered pentagon. Should we drop the new horizons wall? Would it be better to include future concepts in the general scenarios?
 
'''AAMI Mini-Showcase (Continued):'''
:* We have a 10 x 20 booth in a prime location.
:* It is adjacent to the ACCE booth; we may collaborate on the entire 10 x 30 space.
:* AAMI will provide tables – this will largely be a table top and poster exhibit. I have the posters we used in Atlanta for reuse in Tampa.
::- If necessary we can brainstorm other display techniques (e.g., a bookcase to hold displays and function like a wall).
:* There will be no exhibitor charges, and you need not be exhibiting elsewhere in the hall to participate in this activity.
::- There may be a minimal charge for utilities or other support that will be shared by all, depending upon what we develop.
::- ACCE has offered $2000. to help defray expenses (this may be used for handouts, etc.).
:* For discussion of feasibility only, let’s assume we use 6 x 2 foot tables in one row, 18’ long:
::- Pump(s) on pole with LCD monitor, keyboard, mouse on table – 2 pump vendors to date.
::- IOP – 1 vendor to date
::- Bedside monitor(s) with LCD monitor, keyboard, mouse on table – 1 vendor to date.
::- EMR or CIS; LCD monitor, keyboard, mouse on table – possible CIS.
::- Alarm system with data from pump(s), monitor(s) and phone or display – possible AM and phone system; various ARs.
::- Gateways, servers, etc. under the table.
:* The above, and more should be feasible. Those highlighted in green on the attached spreadsheet have indicated an interest in participating.
:* Determine if a table top presentation will work for the device(s) and system(s) or if we need research a better way.
::- LAN provided by a participant or rented.
::- Electrical power.
:* Posters from Atlanta and possibly one or two new ones.
::- Posters from HIMSS10 are available for reuse (most of the inventory is attached).
::- Determine if a “block diagram” or other poster is needed to explain the demonstration.
::- Banner or other indication of the booth and purpose.
::- We will brainstorm how best to display these, how to hang them without a wall.
:* Handouts – potentially extracting the most important parts of the HIMSS10 handout and reducing it to one double-sided page, if possible. A first draft of a greatly edited version of the handout employed in Atlanta is attached to initiate development. Please review and comment by email to me.
:* Volunteers to staff the booth – 1 volunteer to date.
:* Ken suggested a large LCD monitor showing some sort of animation which illustrates the various data paths and how they end up from the device into the EPR.  Not sure exactly what this would look like but it should tell the story more dynamically than a bunch of devices and display monitors.
 
'''Discussion of Connectathon Lessons Learned and Other Issues'''
 
 
:* Next Meeting
 
 
'''Agenda Thirty Fifth Meeting March 30, 3 pm EDT [[PCD Connectathon&Showcase 2010-03-30 Webex]]'''
'''AAMI Mini-Showcase (Continued):'''
:* We have a 10 x 20 booth in a prime location.
:* It is adjacent to the ACCE booth; we may collaborate on the entire 10 x 30 space.
:* AAMI will provide tables – this will largely be a table top and poster exhibit. I have the posters we used in Atlanta for reuse in Tampa.
::- If necessary we can brainstorm other display techniques (e.g., a bookcase to hold displays and function like a wall).
:* There will be no exhibitor charges, and you need not be exhibiting elsewhere in the hall to participate in this activity.
::- There may be a minimal charge for utilities or other support that will be shared by all, depending upon what we develop.
::- ACCE has offered $2000. to help defray expenses (this may be used for handouts, etc.).
:* For discussion of feasibility only, let’s assume we use 6 x 2 foot tables in one row, 18’ long:
::- Pump(s) on pole with LCD monitor, keyboard, mouse on table – 2 pump vendors to date.
::- IOP – 1 vendor to date
::- Bedside monitor(s) with LCD monitor, keyboard, mouse on table – 1 vendor to date.
::- EMR or CIS; LCD monitor, keyboard, mouse on table – possible CIS.
::- Alarm system with data from pump(s), monitor(s) and phone or display – possible AM and phone system; various ARs.
::- Gateways, servers, etc. under the table.
:* The above, and more should be feasible. Those highlighted in green on the attached spreadsheet have indicated an interest in participating.
:* Determine if a table top presentation will work for the device(s) and system(s) or if we need research a better way.
::- LAN provided by a participant or rented.
::- Electrical power.
:* Posters from Atlanta and possibly one or two new ones.
::- Posters from HIMSS10 are available for reuse (most of the inventory is attached).
::- Determine if a “block diagram” or other poster is needed to explain the demonstration.
::- Banner or other indication of the booth and purpose.
::- We will brainstorm how best to display these, how to hang them without a wall.
:* Handouts – potentially extracting the most important parts of the HIMSS10 handout and reducing it to one double-sided page, if possible. A first draft of a greatly edited version of the handout employed in Atlanta is attached to initiate development. Please review and comment by email to me.
:* Volunteers to staff the booth – 1 volunteer to date.
:* Ken suggested a large LCD monitor showing some sort of animation which illustrates the various data paths and how they end up from the device into the EPR.  Not sure exactly what this would look like but it should tell the story more dynamically than a bunch of devices and display monitors.
 
'''Discussion of Connectathon Lessons Learned and Other Issues'''
 
== April 2010 Meetings ==
'''Agenda Thirty Sixth Meeting April 6, 3 pm EDT [[PCD Connectathon&Showcase 2010-04-06 Webex]]'''
'''AAMI Mini-Showcase (Continued):'''
:* We have a 10 x 20 booth in a prime location.
::- Steve Merritt's Suggestions:
::: Need to get the point across about "purchasable" products or timelines of when purchasable
::: Need to water-down the technical details as much as possible
::: The target audience will be less informatics-focused and more clinical-device-side and safety focused
::: Need to get this audience to start demanding IHE - help them understand how this reduces their costs and resource requirements.
::- Individuals participating in the demonstration would need to register for the conference in order to attend the education sessions.
:* ACCE booth collaboration on the entire 10 x 30 space.
:* AAMI will provide tables – this will largely be a table top and poster exhibit. I have the posters we used in Atlanta for reuse in Tampa.
::- If necessary we can brainstorm other display techniques (e.g., a bookcase to hold displays and function like a wall).
:* There will be no exhibitor charges, and you need not be exhibiting elsewhere in the hall to participate in this activity.
::- There may be a minimal charge for utilities or other support that will be shared by all, depending upon what we develop.
::- ACCE has offered $2000. to help defray expenses (this may be used for handouts, etc.).
:* We currently assume we use 2 rows of 6 x 2 foot tables, one higher than the other:
::- We still need a DOC
::- LAN provided by a participant or rented.
::- Electrical power.
:* Posters from Atlanta and possibly one or two new ones.
::- Posters from HIMSS10 are available for reuse (most of the inventory is attached).
::- Determine if a “block diagram” or other poster is needed to explain the demonstration.
::- Banner or other indication of the booth and purpose.
::- We will brainstorm how best to display these, how to hang them without a wall.
:* Handouts – potentially extracting the most important parts of the HIMSS10 handout and reducing it to one double-sided page, if possible. A first draft of a greatly edited version of the handout employed in Atlanta is attached to initiate development. Please review and comment by email to me.
:* Volunteers to staff the booth – 1 volunteer to date.
 
'''Discussion of Showase Lessons Learned and Other Issues'''
 
|
'''April 14 Meeting Was Cancelled'''
|
 
 
'''Agenda Thirty Seventh Meeting April 20, 3 pm EDT [[PCD Connectathon&Showcase 2010-04-20 Webex]]'''
'''AAMI Mini-Showcase (Continued):'''
:* We have a 10 x 20 booth in a prime location.
::- Steve Merritt's Suggestions:
::: Need to get the point across about "purchasable" products or timelines of when purchasable
::: Need to water-down the technical details as much as possible
::: The target audience will be less informatics-focused and more clinical-device-side and safety focused
::: Need to get this audience to start demanding IHE - help them understand how this reduces their costs and resource requirements.
::- Individuals participating in the demonstration would need to register for the conference in order to attend the education sessions.
:* ACCE booth collaboration on the entire 10 x 30 space.
:* Table top demonstration plus posters
::- AAMI will provide one table
:* There will be no booth rental exhibitor charges, and you need not be exhibiting elsewhere in the hall to participate in this activity.
::- There will be a minimal charge for utilities or other support that will be shared by all, depending upon what we develop.
::- ACCE has offered $2000. to help defray expenses (this may be used for handouts, etc.).
:* We currently assume we use 2 rows of 8 x 2 foot tables, one higher than the other:
::- We still need a DOC
::- LAN provided by a participant or rented.
::- Electrical power and other items listed in Excel spreadsheet.
:* Posters and signage:
::- Posters from HIMSS10 are available for reuse (see PCD HIMSS10 Showcase for posters).
::- Determine if a “block diagram” or other poster or handout is needed to explain the demonstration.
::- Banner or other indication of the booth and purpose.
::- Handouts – potentially extracting the most important parts of the HIMSS10 handout and reducing it to one double-sided page.
:* Volunteers to staff the booth – 1 volunteer to date.
 
 
'''Agenda Thirty Eighth Meeting April 27, 3 pm EDT [[PCD Connectathon&Showcase 2010-04-27 Webex]]'''
'''AAMI Mini-Showcase (Continued):'''
:* We have a 10 x 20 booth in a prime location.
::- Steve Merritt's Suggestions:
::: Need to get the point across about "purchasable" products or timelines of when purchasable
::: Need to water-down the technical details as much as possible
::: The target audience will be less informatics-focused and more clinical-device-side and safety focused
::: Need to get this audience to start demanding IHE - help them understand how this reduces their costs and resource requirements.
::- Scott's Suggestions:
::: I'm not sure any of us know what their hot buttons are.  I strongly suggest that we do not create a script and tour but set up our table based on themes (almost like the walls at HIMSS).  As BioMeds's approach they can be asked what is of interest to them and directed to the section of the table that can demonstrate that interoperability.  Once the demonstration is completed the demo person can inform the BioMed of the other interoperability offerings available and move them to that section.  The table displays can possibly be segmented based on Profile so it will be easier to focus on specifics rather than generalities.
::- Individuals participating in the demonstration would need to register for the conference in order to attend the education sessions.
:* ACCE booth collaboration on the entire 10 x 30 space.
:* Table top demonstration plus posters
:* There are no booth rental exhibitor charges, and you need not be exhibiting elsewhere in the hall to participate in this activity.
::- There will be a minimal charge for utilities or other support that will be shared by all, depending upon what we develop.
::- ACCE has offered $2000. to help defray expenses (this may be used for handouts, etc.).
:* We currently assume we use 2 rows of 8 x 2 foot tables, one higher than the other:
::- We have sufficient participation to demonstrate multiple profiles.
::- LAN provided by a participant or rented.
::- Electrical power and other items listed in Excel spreadsheet.
:* Posters, handouts and signage:
::- Posters from HIMSS10 are available for reuse (see PCD HIMSS10 Showcase for posters).
::- Determine if a “block diagram” or other poster or handout is needed to explain the demonstration.
::- Banner or other indication of the booth and purpose. Sarah suggested "Device Interoperability for the Integrated EHR".
::- Handouts – approval of Jeff's edits, concept.
:* Volunteers to staff the booth – Jon Blasingame, Scott, Al volunteered to date.
 
 
== May 2010 Meetings ==
'''Agenda Thirty Ninth Meeting May 11, 3 pm EDT [[PCD Connectathon&Showcase 2010-05-11 Webex]]'''
'''AAMI Mini-Showcase (Continued):'''
 
:* Notes from last meeting, April 27, 3 pm EDT [[PCD Connectathon&Showcase 2010-04-27 Webex]]
 
:* Recommendations:
::- Steve Merritt:
::: Need to get the point across about "purchasable" products or timelines of when purchasable
::: Need to water-down the technical details as much as possible
::: The target audience will be less informatics-focused and more clinical-device-side and safety focused
::: Need to get this audience to start demanding IHE - help them understand how this reduces their costs and resource requirements.
::- Scott's:
::: I'm not sure any of us know what their hot buttons are.  I strongly suggest that we do not create a script and tour but set up our table based on themes (almost like the walls at HIMSS).  As BioMeds's approach they can be asked what is of interest to them and directed to the section of the table that can demonstrate that interoperability.  Once the demonstration is completed the demo person can inform the BioMed of the other interoperability offerings available and move them to that section.  The table displays can possibly be segmented based on Profile so it will be easier to focus on specifics rather than generalities.
 
:* Registration:
::- Those setting up and demonstrating need access.
::- Individuals participating in the demonstration would need to register for the conference in order to attend the education sessions.
 
:* ACCE booth collaboration on the entire 10 x 30 space.
:* Table top demonstration plus posters
::- We need to settle on the "title" and order the signs.
::- We need the "story" - volunteers sought.
::- We need the posters that describe what is shown, what is coming later. Posters from HIMSS10 are available for reuse (see PCD HIMSS10 Showcase for posters).
::- We need to finalize the handout.
::- We have staffing; feel free to join in – Jon Blasingame, Scott (Sunday, Monday), Al, Erin, John Rhoads.
::- We need a leader to manage the installation.


== 2008-9 Calendar ==
This is intended as a work in progress, with milestones added or modified throughout the cycle. Dates to be assigned.


:: Development of Test Concepts with the Profile WGs - Dec. 21
'''Agenda Fortieth Meeting May 25, 3 pm EDT [[PCD Connectathon&Showcase 2010-05-25 Webex]]'''
:: Development of the Pre-Connectathon Tests (MWB and NIST tools) to qualify systems for the Virtual and actual Connectathons
'''AAMI Mini-Showcase (Continued):'''
:: Development of Connectathon Tests
:: Reporting successful completion of Pre-Connectathon Qualifying Tests (initial qualifying MESA test, PCD profile tests)
:: Conduct of Virtual Connectathon Testing and reporting results - No later than last two weeks of Jan.
:: Submission of networking requirements to Steve Moore - Dec. 17 with MAC addresses due to Steve by Jan. 15
:: Definition of Scenario for Showcase - Rough draft Jan. 6
:: Definition of space, utility and other requirements for the Showcase - Dec. 17


== Action Items (Details in meeting notes) ==
'''AAMI Mini-Showcase Planning'''
:* Handouts:
::- Primary handout inserted in AAMI registration packages:
::- MEM handout if permission is granted):
:* Posters:
::- describing the demonstration:
::- describing MEM:
:::o Ken/Steve:
:::o Steve's 24x7 article
:* Demonstrations:
::- Furnishings, electrical have been ordered through ACCE
:* Set up
::- Monroe will coordinate
::- Need to set a time to begin
:* Elevator speech
:* Next meeting date


Item '''Example from last year'''
== June 2010 Meetings ==
'''Agenda Forty First Meeting June 15, 3 pm EDT [[PCD Connectathon&Showcase 2010-06-15 Webex]]'''
'''AAMI Mini-Showcase (Continued):'''


: '''from Jan. 21'''
:* Handouts:
::- Primary handout inserted in AAMI registration packages:
::- MEM handout (if permission is granted)
::- Handout for Saturday's ACCE Symposium
:* Posters:
::- describing the demonstration
::- describing MEM
::- Steve's 24x7 article (see permission issue above)
:* Set up
::- Please bring Ethernet and Power Cords and Power Strips
::- Monroe will coordinate
::- Set up at 11 am Friday
:* Staffing the booth
::- Vendor recruiting
:* Elevator speech
:* Next meeting date


:* Open Date: Monitor PCD Connectathon registrations periodically.
== 2009-10 Calendar ==
:* Jan. 28: (All) Consider a more effective way to communicate the IHE/PCD message, with fewer presentations.
'''This includes placholders; lines preceded with * provide current knowledge of dates'''
::* Determine which systems provide comparable information within the storyline, even if they are unique in other ways.
This is intended as a work in progress, with milestones added or modified throughout the cycle. Dates to be assigned.
:* Jan. 28: (Manny) Define data for preload, registration feed for visitors. Consider eliminating printers.
:* Jan. 28: (Manny) Address GE's concerns about staffing their Enterprise system.
:* Jan. 28: (Manny) Update on ADT/patient-visitor id and association with systems.
:* Update on ADT/patient-visitor id and association with systems. Focused meeting, include diagram and other information to be provided.
::* John Donnelly will address this as part of the Showcase focused portion of this meeding.
::* Check with Bill Klaver, John Donnelly, and Steve Moore. A04 will work this year
:* Verify that we will have an A04 message this year. Request preloaded data (medication order, demographics).
:* Provide material for the Scenario (outline or brief description) to be followed by Manny compiling a single view.
::* Identify overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
::* Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow
::* Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
:* Zebra has agreed to provide printers. We need to decide between two suggested models; determine if Epic can use the same Postscript printer Ruth provides; assure access to the registration kiosk. 
:* Updates on how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
::* (Pump Vendors, Enterprise Systems) Vendors will provide their own approach to bar coding for drugs, infusions, patients and caregivers.
:* Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.  
:* Identify the devices to be connected to middleware, the coding of parameters, identifying partners for testing and demonstration.
:* Coordinate ADT testing (Virtual and Connectathon) with Bill Klaver, coordinate with Steve Moore, John Donnelly, seek a backup system.
:* Update name for alarm product
:* Confirm structure diagrams and utilities
:* Define contents of fourth wall
:* Set PCD Docent training WebEx / on site (and run through at Connectathon)
:* Webex run through of draft Scenario
:* Update block diagram with locations of SIS, Cerner, Capsule
:* Steve Moore needs MAC addresses
:* Virtual Connectathon (tentative deadline for completion; partners may test anytime before this)
:* Determine if Cerner can support the AR actor in  the Showcase.
:* Change proposal to PIB for ADT in PIB option.


== Closed Action Items ==
:* Connectathon Registration August 28 - September 30, 2009
:* Showcase Registration August 28 - September 30, 2009
:* Connectathon January 11-15, 2010 (plan to arrive no later than the 10th)
:* Showcase March 1-4, 2010 (watch for date for setup, likely the Saturday before)
:: Development of Test Concepts with the Profile WGs - ____
:: Development of the Pre-Connectathon Tests (MWB and NIST tools) to qualify systems for the Virtual and actual Connectathons
:: Development of Virtual Connectathon Procedures, Tests
:: Development of Connectathon Tests
:: Reporting successful completion of Pre-Connectathon Qualifying Tests (initial qualifying MESA test, PCD profile tests)
:: Conduct of Virtual Connectathon Testing and reporting results
:: Submission of networking requirements to Steve Moore - Nov. ___ with MAC addresses due to Steve by ___
:: Definition of Scenario for Showcase - Rough draft __
:: Final Scenario for Showcase
:: Design of Showcase Space
:: Definition of space, utility and other requirements for the Showcase
::


:* Why are more companies not implementing SPD query within DOC? Which companies will implement and test this query this year?
:* Review items in http://wiki.ihe.net/index.php?title=IHE_PCD_2009_Showcase_Workshop_2008-10-28_to_30#Meeting_Purpose and determine which are transferred here.
:* Manny to contact Jim Higgins (Cerner) to coordinate Hill-Rom support. They provided a bed and a gurney in the past. Rita indicated that Cerner will coordinate Hill-Rom and Stryker beds and a gurney.
:* (Manny) Emails to Lisa with feedback on the Workshop
:* (Manny) Draft ACM tests ready for review - covered elsewhere
:* (Manny) HIMSS badge - MRN? - covered elsewhere
:* Ruth indicated that GE Enterprise includes the 5-rights data entry.
:* Special meeting was held to address ADT, other ID. Al had provided information about PAM, the need for A04 which is in ITI-31, not ITI-30, will be part of patient ID issue.
::* Colin FX (Epic) and Ruth (GE) offered approaches to support patient ID/registration requirements / issues from discussion.
::* (All) Patient IDs, ADT/PIB issues, device and caregiver ID are covered in other items on the list.
:* (Manny, pump vendors, any others) Wireless spectrum management. Didi is not supportive of addressing this throughout the convention hall, recommends approaching John Donnelly. Manny will contact John.
:* Emergin, LiveData) Connectathon on site testing with Polycom is scheduled for Thursday, Friday morning.
:* (Ruth) Does GE Enterprise include the 5-rights data entry?
:* Sarah Higgins identified contacts at Datamax and Zebra.
:* (Manny, pump vendors, any others) Wireless spectrum management. Didi is not supportive of addressing this throughout the convention hall, recommends approaching John Donnelly. Manny will contact John.
:* (Emergin, LiveData) Schedule Connectathon on site testing with Polycom
:* (Manny) Summarize focused meeting, include diagram.
:* (Bikram) Now unlikely to have bidirectional distributed demo - pushing data in from their booth to the demo.
:* (Pump Vendors, Enterprise Systems) Vendors will provide their own approach to bar coding for drugs, infusions, patients and caregivers.
:* Business card for Showcase w/ all companies listed + Booth numbers - the Showcase handout may address this.
:* Cerner added the AR actor.
:* (Manny) Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.
:* (Bikram, Rita/Jim Higgins) Identify the devices to be connected to middleware, the coding of parameters, identifying partners for testing and demonstration.
:* (Brett) Update name for alarm product
:* (Manny) Verify that we will have an A04 message this year. Request preloaded data (medication order, demographics).
:* Participants indicated they can test with two devices/patients' data (e.g., two pumps, two beds, two ARs or one AR with two patients)?
:* Structure:
::: - Utilities (electric, network)
::: - Physical requirements (size, mounts if larger, etc)
:* (All) The revised approach permits closing the following:
:: - Determine which systems provide comparable information within the storyline, even if they are unique in other ways.
:: - (All) Provide material for the Scenario (outline or brief description), consistent with the overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
::: - Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow
::: - Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
:* (Manny) Define data for preload, registration feed for visitors. Consider eliminating printers.
:* (Manny) Address GE's concerns about staffing their Enterprise system.
:* Virtual Connectathon:
:: - ADT: Bill Klaver for Virtual Connectathon; John Donnelly, and Steve Moore for Connectathon and Showcase. A04 will work this year
:* (Manny) Final decision on printers.
:* (Pump Vendors, Enterprise Systems) Vendors will provide their own approach to bar coding for drugs, infusions, patients and caregivers.
:* (All) Confirm structure diagrams and utilities - hard deadline for PCD before the Connectathon.
:* Steve Moore needs MAC addresses
:* Comments on Virtual Connectathon experience - replaced with "lessons learned" scheduled for 3/4
:* Monroe experienced a time out problem with the MWB.
:* Monitor PCD Connectathon registrations periodically.
:* The Task Force will meet next Wednesday following the weekly meeting. A "reading" will be scheduled for Friday, Feb. 20 to prepare for the HIMSS Showcase rehearsal with equipment at the Connectathon.
:* First Webex run through of draft Scenario
:* Lessons learned leading up to and through the Connectathon
:: - Pre-Connectathon process and tests, Virtual Connectathon process and tests, Connectathon process and tests
::* Showcase Internet connections
::: - IP addresses - DHCP
::* Showcase wireless availability (802.11 b/g) - If HIMSS doesn't provide
:: - Schedule a reading for docents and rehearsals
::* Read, review the script


== Links ==
== Links to PCD Home and Meetings ==


[[Patient Care Device | PCD Home]]
[[Patient Care Device | PCD Home]]
[[Category:PCD Meeting]]
[[Category:PCD Meeting Archive]]
[[Category:PCD | ABA]]
[[Category:PCD | ABA]]

Latest revision as of 10:03, 6 July 2010

This is the entry point for this Working Group in the 2009-10 Connectathon and HIMSS Showcase cycle.

Meeting Purpose

Collaborative effort to discuss implementation and demonstration issues and preparations


WebEx Information

Topic: PCD Connectathon and Showcase Working Group

Dates: Regularly Scheduled Weekly Meetings -- Most Tuesdays, through March

Time: 2 pm, Eastern Time (New York EST, or EDT depending upon the date)

Duration: 60 Minutes


Related Pages and Documents

PCD Getting Started page with useful links http://wiki.ihe.net/index.php?title=PCD_Getting_Started

Orientation to IHE Connectathons and Showcases (demonstrations) http://www.ihe.net/north_america/flash/IHE_Educational_Webinar_Series_KickOff/IHE_Educational_Webinar_Series_KickOff.swf

Interpreting IHE Technical Frameworks http://www.ihe.net/north_america/flash/First-TimersSession_June18_2009/First-TimersSession_June18_2009.swf

Other programs in the series (including PCD's presentation on July 30)

Recorded: https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=EC&rID=34315407&rKey=ba21b0d7905e8ce8
Slided only: http://www.ihe.net/Events/webinars2009.cfm
The first PCD Connectathon/Showcase meeting of this cycle was recorded (except for approximately the first ten minutes) and is available at https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=MC&rID=34324237&rKey=c9d66197998e5e59

HIMSS10 http://www.interoperabilityshowcase.org/

Pictures from HIMSS09 ftp://ftp.ihe.net/Patient_Care_Devices/Showcases/HIMSS2009April/Photos/

Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/

Action Items are tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en

PCD Pre-Connectathon Testing 2010

PCD Virtual Connectathon Testing 2010

PCD Showcase 2010 Scenario

HIMSS10 Website http://www.himssconference.org/

2010 North American Connectathon Overview - Important to View Periodically http://ihewiki.wustl.edu/wiki/index.php/North_America_2010

Links to Trial Implementation Versions and New Directions Demo Documentation

PCD links to profiles are found at http://wiki.ihe.net/index.php?title=PCD_Profiles

ACM: ftp://ftp.ihe.net/Patient_Care_Devices/TechnicalFrameworkforTrialImplementation/ note work in progress at __

DEC: ftp://ftp.ihe.net/Patient_Care_Devices/TechnicalFrameworkforTrialImplementation/

DPI: http://wiki.ihe.net/index.php?title=DPI#Overview

IDCO: ftp://ftp.ihe.net/Patient_Care_Devices/Profiles/IDCO

MEM: link available at http://wiki.ihe.net/index.php?title=PCD_MEM_WP_Discussion

PIV: link to last TI at ftp://ftp.ihe.net/Patient_Care_Devices/TechnicalFrameworkforTrialImplementation/, and CPs available at http://wiki.ihe.net/index.php?title=PCD_Pump_2009-07-22_WebEx

RTM: ftp://ftp.ihe.net/Patient_Care_Devices/TechnicalFrameworkforTrialImplementation/ note that the latest versions of the tables are at __

Action Items (Details in meeting notes)

Action Items are tracked on a Google Doc page:

http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en


July, 2009 Meetings

1 First meeting July 30, 3 pm EDT PCD Connectathon&Showcase 2009-07-30 Webex,

This meeting was recorded (except for approximately the first ten minutes) and is available at https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=MC&rID=34324237&rKey=c9d66197998e5e59

Potential agenda items:

  • Introduction of Participating Companies and Profiles/Actors (spreadsheets)
- Developing a list of companies, contacts, profiles, actors - survey
- Companies must be IHE members
- Aug. 28 repeat of June 11 Kick Off with reduced old material and addition of HITSP profiles
  • Technical development
- Brief description of the MWB and its uses
- Pre-Connectathon, Virtual Connectathon, Connectathon testing
- NIST's support
- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/
- RTM compliance required/desired
  • Intro to Showcase Process
- Design of structure
- Pictures from HIMSS09 ftp://ftp.ihe.net/Patient_Care_Devices/Showcases/HIMSS2009April/Photos/
- Developing Scenario(s)
- PCD will likely have multiple tours
  • Last year's experience, lessons learned
- Orientation, mentoring of those new to the process
- Coordination between technical and marketing folk
  • Establish regular meeting dates
  • Initial Action Items

Establish Initial Action Items'

Action Items
  • Orientation for companies joining for the first time
  • Connectathon Planning
- MWB training
- Status report on tests for Connectathon
- NIST validation
Showcase Planning
  • Scenario
Timeline

August 2009 Meetings

Agenda Second meeting August 11, 3 pm EDT PCD Connectathon&Showcase 2009-08-11 Webex

  • Participating Companies and Profiles/Actors (spreadsheets)
- Update of list of companies, contacts, profiles, actors - survey
- Companies must be IHE members
- Connectathon ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/
- Showcase ftp://ftp.ihe.net/Patient_Care_Devices/Showcases/HIMSS2009April/
- Orientation, mentoring of those new to the process
- Coordination between technical and marketing folk
- Message Workbench Training - scheduling tutorials with Peter Rontey (VA)
- PCD F2F October 5-9
  • IHE Webinars - instead of F2F
- PCD Presentation Recorded: https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=EC&rID=34315407&rKey=ba21b0d7905e8ce8
- N A Connectathon Process Aug. 28 http://www.ihe.net/Events/webinars2009.cfm
  • Technical development
- Brief description of the MWB and its uses
- Pre-Connectathon, Virtual Connectathon, Connectathon testing
- NIST's support
- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/
- RTM compliance required/desired

Future Agenda Topics to include

  • Connectathon: EUI-64 and RTM
  • Showcase: Lessons Learned

Agenda Third meeting August 18, 3 pm EDT PCD Connectathon&Showcase 2009-08-18 Webex

  • Participating Companies and Profiles/Actors (spreadsheets)
- Update of list of companies, contacts, profiles, actors - survey
- Companies must be IHE members
- PDQ - straight forward addition of this ITI Profile
- PAM - option to use a "fat free" portion of PAM by referencing specific transactions
- Message Workbench Training - scheduling tutorials with Peter Rontey (VA)
- PCD F2F October 5-9
  • IHE Webinars - instead of F2F - reminder
- PCD Presentation Recorded: https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=EC&rID=34315407&rKey=ba21b0d7905e8ce8
- N A Connectathon Process Aug. 28 http://www.ihe.net/Events/webinars2009.cfm
  • Connectathon: EUI-64 and RTM
- RTM compliance required/desired
- EUI-64 required/desired
  • Technical development
- Brief description of the MWB and its uses
- Pre-Connectathon, Virtual Connectathon, Connectathon testing
o Review last year's Pre-Connectathon Tests, new Pre-Connectathon tests for IDCO
- NIST's support
- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/

Agenda Fourth meeting August 25, 3 pm EDT PCD Connectathon&Showcase 2009-08-25 Webex preliminary, based upon previous meeting; placeholder; please add

  • Participating Companies and Profiles/Actors (spreadsheets)
- Update of list of companies, contacts, profiles, actors - survey
- Companies must be IHE members
- Request for notetaker(s)

September 2009 Meetings

Agenda Fifth meeting September 1, 3 pm EDT PCD Connectathon&Showcase 2009-09-01 Webex preliminary, based upon previous meetings; placeholder; please add

  • Participating Companies and Profiles/Actors (spreadsheets)
- Update of list of companies, contacts, profiles, actors - survey
- Companies must be IHE members
- PDQ - straight forward addition of this ITI Profile
- PAM - option to use a "fat free" portion of PAM by referencing specific transactions
- Message Workbench Training - scheduling tutorials with Peter Rontey (VA)
- PCD F2F October 5-9
- Review, update PIV Pre-Connectathon Tests
- Develop IDCO Pre-Connectathon Tests
- Otehr
  • IHE Webinars - instead of F2F - reminder
- PCD Presentation Recorded: https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=EC&rID=34315407&rKey=ba21b0d7905e8ce8
- N A Connectathon Process Aug. 28 http://www.ihe.net/Events/webinars2009.cfm
  • Connectathon: EUI-64 and RTM
- RTM compliance required/desired
- EUI-64 required/desired
  • Technical development - reminder
- Brief description of the MWB and its uses
- Pre-Connectathon, Virtual Connectathon, Connectathon testing
- NIST's support
- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/

|

Agenda Sixth meeting September 8, 3 pm EDT PCD Connectathon&Showcase 2009-09-08 Webex

  • DOR ability to access ADT (PIB) - Grouped and Non-Grouped actors
- PDQ - straight forward addition of this ITI Profile
- PAM - straight forward addition of this ITI Profile
- PAM Lite - new name for "fat free" portion of PAM referencing specific transactions
  • PIV Grouped and Non-Grouped DEC actors
  • Other technical developments
- Brief description of the MWB and its uses
- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/
- Pre-Connectathon, Virtual Connectathon, Connectathon testing
- NIST's support
  • IHE Webinars - instead of F2F - reminder
- PCD Presentation Recorded: https://ihe.webex.com/ihe/lsr.php?AT=pb&SP=EC&rID=34315407&rKey=ba21b0d7905e8ce8
- N A Connectathon Process Aug. 28 http://www.ihe.net/Events/webinars2009.cfm
  • Connectathon
- Registration for Connectathon and Showcase is open until the end of the month
- Participating Companies and Profiles/Actors (spreadsheets)
- Update of list of companies, contacts, profiles, actors - survey
- Companies must be IHE members
- Recruiting additional companies as full participants and recruiting for New Directions
- RTM compliance required/desired
- EUI-64 required/desired
- Message Workbench Training - scheduling tutorials with Peter Rontey (VA)
- PCD F2F October 5-9 - please RSVP and make hotel reservations
- Review, update PIV Pre-Connectathon Tests
- Develop IDCO Pre-Connectathon Tests
- Other

|

Agenda Seventh meeting September 15, 3 pm EDT PCD Connectathon&Showcase 2009-09-15 Webex

- PDQ - straight forward addition of this ITI Profile
- PAM - straight forward addition of this ITI Profile
- PAM Lite - select new name for "fat free" portion of PAM referencing specific transactions
  • PIV Grouped and Non-Grouped DEC actors
  • CPs developed as we progress from here: assure all are on the same page, save CP submission until March
  • Other technical developments
- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/
- Pre-Connectathon, Virtual Connectathon, Connectathon testing
- NIST's support
  • Connectathon
- Registration for Connectathon and Showcase is open until the end of the month
- Participating Companies and Profiles/Actors (spreadsheets)
- Correction - companies NEED NOT be IHE members
- Recruiting additional companies as full participants and recruiting for New Directions
- Message Workbench Training - scheduling tutorials with Peter Rontey (VA)
o MWB files are at ftp://ftp.ihe.net/Patient_Care_Devices/Tools/MWB/MWB%20v%201.6.8.2/
- PCD F2F October 5-9 - please RSVP and make hotel reservations
- Review, update PIV Pre-Connectathon Tests
- Develop IDCO Pre-Connectathon Tests
- Other

|

Agenda Eighth meeting September 22, 3 pm EDT PCD Connectathon&Showcase 2009-09-22 Webex

- PDQ - straight forward addition of this ITI Profile
- PAM - straight forward addition of this ITI Profile
- PAM Lite - select new name for "fat free" portion of PAM referencing specific transactions
  • PIV Grouped and Non-Grouped DEC actors
  • CPs developed as we progress from here: assure all are on the same page, save CP submission until March
  • Other technical developments
- Availability of last year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/Yr3-2009/Yr3-PreConnectathonTesting/
- Pre-Connectathon, Virtual Connectathon, Connectathon testing
- NIST's support
  • Connectathon
- Registration for Connectathon and Showcase is open until the end of the month
- Participating Companies and Profiles/Actors (spreadsheets)
- Correction - companies NEED NOT be IHE members
- Recruiting additional companies as full participants and recruiting for New Directions
- Pre-Connectathon Tests
o MWB and NIST Test Tools - availability, scope, requirements
+ Please post ASAP to assist your test partners
- Message Workbench Training - scheduling tutorials with Peter Rontey (VA)
o MWB files are at ftp://ftp.ihe.net/Patient_Care_Devices/Tools/MWB/MWB%20v%201.6.8.2/
- PCD F2F October 5-9 - please RSVP and make hotel reservations
- Review, update PIV Pre-Connectathon Tests
- Develop IDCO Pre-Connectathon Tests
- Other

|

Agenda Ninth meeting September 29, 3 pm EDT PCD Connectathon&Showcase 2009-09-29 Webex changes welcome

  • Review of previous meeting Discussion Summary PCD Connectathon&Showcase 2009-09-22 Webex
  • Connectathon Kudu registration and HIMSS10 indications
  • Remaining ADT Issues
  • Update on Grouped and Non-Grouped actors
  • Update: Assuring CPs developed as we progress are adopted by all developers affected.
  • Other technical developments
- Availability of this year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/
- Pre-Connectathon, Virtual Connectathon, Connectathon testing
- Message Workbench Training - tutorial Oct. 2 with Peter Rontey (VA)
o MWB files are at ftp://ftp.ihe.net/Patient_Care_Devices/Tools/MWB/MWB%20v%201.6.8.2/
- NIST's test tools
o Tutorial following F2F
- Update on Pre-Connectathon Tests
  • Connectathon
- Registration for Connectathon and Showcase is open until the end of the month
- Participating Companies and Profiles/Actors (spreadsheets)
- Recruiting additional companies as full participants and recruiting for New Directions
- PCD F2F October 5-9 - please RSVP and make hotel reservations

|:

October 2009 Meetings

|

Agenda - Special Tenth meeting - October 2, 11 am EDT PCD Connectathon&Showcase 2009-10-02 Webex Message Workbench Training with Peter Rontey of the VA

|

Agenda Eleventh meeting October 13, 3 pm EDT PCD Connectathon&Showcase 2009-10-13 Webex

  • Review of previous meeting Discussion Summary PCD Connectathon&Showcase 2009-09-29 Webex
  • Connectathon Kudu registration and HIMSS10 indications
  • Issues with Profile TIs, MWB item - from participants
  • Remaining ADT Issues
  • Update on Grouped and Non-Grouped actors
  • Update: Assuring CPs developed as we progress are adopted by all developers affected.
  • Other technical developments
- Availability of this year's samples and MWB efforts ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/
- Pre-Connectathon, Virtual Connectathon, Connectathon testing
- Message Workbench Training - Part I tutorial Oct. 2 with Peter Rontey (VA) is not available
- MWB Training - Part II tutorial Oct. 16 at 11 am EDT
o MWB files are at ftp://ftp.ihe.net/Patient_Care_Devices/Tools/MWB/MWB%20v%201.6.8.2/
- NIST's test tools
o Tutorial October 19 11 am EDT
- Update on Pre-Connectathon Tests
  • Connectathon
- Registration for Connectathon and Showcase closed
- Participating Companies and Profiles/Actors (spreadsheets)
- Recruiting additional companies as full participants and recruiting for New Directions

|:

Agenda Special Twelfth meeting - MWB Tutorial Part II October 16

  • Meeting was recorded. The link is posted above.

Agenda Special Thirteenth meeting - NIST Test Tools Tutorial October 19

Agenda Fourteenth Meeting October 20, 3 pm EDT PCD Connectathon&Showcase 2009-10-20 Webex

- How to post results from NIST and Virtual Connectathon tests TBD
- Post Successfully Tested Messages with explanatory README files as needed. Each system has a distinct folder under each profile implemented. Please post sending messages as early as possible. The Virtual Connectathon tests will use the Internet unless firewall issues prevent these tests. In that case these tested, posted, messages will substitute from the sending systems.
- ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/
- Test results are due December 1; however Thanksgiving is November 26; for many the effective deadline is November 25.
  • Connectathon Kudu registration and HIMSS10 indications
- Your electrial requirements should be sent directly to the contractor at the hotel. There is a service kit with that information available at http://www.ihe.net/north_america/connectathon_na2010_participants.cfm
  • Issues with Profile TIs, MWB item - from participants
  • Remaining ADT Issues
  • Update on Grouped and Non-Grouped actors
  • Update: Assuring CPs developed as we progress are adopted by all developers affected.
  • Other technical developments
- NIST's test tools - slides, recordings
  • Connectathon
- Registration for Connectathon and Showcase closed - any issues remaining?
- Excel Status Workbook
  • Showcase - Update
- Task Force Report

|:

Agenda Fifteenth Meeting October 27, 3 pm EDT PCD Connectathon&Showcase 2009-10-27 Webex

- How to post results from NIST and Virtual Connectathon tests
- Post Successfully Tested Messages with explanatory README files as needed. Each system has a distinct folder under each profile implemented. Please post sent messages as early as possible.
  • The Virtual Connectathon tests will use the Internet unless firewall issues prevent these tests. In that case tested, posted, messages will substitute for the sending systems.
- ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/
  • MWB Part 1 Tutorial this Friday, 11 am EDT.
  • Issues with Profile TIs, MWB and NIST test tools - from participants
  • Wireless communications at the Connectathon and Showcase
- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
  • Remaining ADT Issues
  • Other technical developments
  • Connectathon
- Excel Status Workbook
  • Showcase - Update
- Task Force Report

Agenda Special Sixteenth meeting - MWB Tutorial Part I October 30

  • Meeting was recorded. The link is posted above.

November 2009 Meetings

Agenda Seventeenth Meeting November 3, 3 pm EDT PCD Connectathon&Showcase 2009-11-03 Webex

Pre-Connectathon Tests

  • Status of test documents
- PIV, IDCO out for review
- DEC, ACM updates by Monday; no major changes expected
- RTM compliance anticipated; no negative responses received
  • Questions about posting results on Kudu, PCD ftp site (results from MWB testing)
- Post Successfully Tested Messages with explanatory README files as needed. Each system has a distinct folder under each profile implemented. Please post sending messages as early as possible. The Virtual Connectathon tests will use the Internet unless firewall issues prevent these tests. In that case these tested, posted, messages will substitute from the sending systems.
- To upload: Obtain access to the ftp site from the project manager.
- ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/
  • Update on NIST and Virtual Connectathon tests
  • MWB Part 1 Tutorial last Friday, recording available
  • Issues with Profile TIs, MWB item - from participants
  • Remaining ADT Issues
  • Other technical developments

Connectathon

  • Wireless communications at the Connectathon and Showcase
- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
  • Excel Status Workbook
  • New Directions ACM testing at the Connectathon - set data
  • Continua testing at the Connectathon

Showcase - Update

  • Task Force Update
- Meeting yesterday
- Scheduling weekly meetings
  • Continua link to PCD

Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en

Other

Agenda Eighteenth Meeting November 10, 3 pm EDT PCD Connectathon&Showcase 2009-11-10 Webex

Pre-Connectathon Tests
- One document for PIV and one for IDCO have been out for review and significant changes made during multiple iterations. The IOC Pre-Connectathon tests have been distributed and posted. The IDCR should be finalized this week.
- DEC, ACM updates were anticipated by Monday and are delayed; no major changes expected. The latest versions are:
DEC: Last year's tests are available in this year's folder; Manny to review once more.
ACM: Last year's tests are available in this year's folder; Manny to review once more.
- Grouped PIB actors - testing and Integration Statement documentation as grouped actors
- RTM compliance anticipated; EUI-64 vendor portion - values requested
  • Questions about posting results on Kudu, PCD ftp site (results from MWB testing) - password and instructions available
- Post Successfully Tested Messages with explanatory README files as needed. Each system has a distinct folder under each profile implemented. Please post sending messages as early as possible. The Virtual Connectathon tests will use the Internet unless firewall issues prevent these tests. In that case these tested, posted, messages will substitute from the sending systems.
- ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/
  • Update on NIST and Virtual Connectathon tests
  • Issues with Profile TIs, MWB item - from participants
  • Remaining ADT Issues
- Volunteer need to submit a CP for the ACK in DEC
  • Other technical developments
- MSH-21 OID – would the OID provided in Wiki page by John Rhoads be the appropriate OID? For this year, use the OID without extension or assign one to each profile?
Connectathon
  • Wireless communications at the Connectathon and Showcase
- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
  • Excel Status Workbook
Showcase - Update
  • Task Force Update
- Scheduling weekly meetings
- Defining the messages for each wall; the "one page" descriptions
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other

Agenda Nineteenth Meeting November 17, 3 pm EDT PCD Connectathon&Showcase 2009-11-17 Webex

Pre-Connectathon Tests
  • Status of test documents
- PIV, IDCO out for review
- DEC v. 3.4 issued
- ACM updates this week; no major changes expected
- RTM compliance anticipated; no negative responses received
  • Posting results on Kudu, PCD ftp site (results from MWB testing)
- Post Successfully Tested Messages with explanatory README files as needed. The NIST and Virtual Connectathon test results are not posted, merely require an email to the project manager indicating success.
- ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/
  • Waivers are available for MWB tests based upon past success with the same systems for the same tests.
  • Update on NIST and Virtual Connectathon tests
  • Issues with Profile TIs, MWB item - from participants
  • Remaining ADT Issues
  • Other technical developments
Connectathon
  • Wireless communications at the Connectathon and Showcase
- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
  • Excel Status Workbook
Showcase - Update
  • MRN, Bar Code, Badges - Is MRN sufficient? No name?
  • Task Force Update
- Meeting yesterday addressing PCD's messages, scenarios
- Beginning design of structures; request for physical requirements
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other

Agenda Twentieth Meeting November 24, 3 pm EDT PCD Connectathon&Showcase 2009-11-24 Webex Placeholder

Pre-Connectathon Tests
  • Status of test documents
- PIV, IDCO out for review
- DEC v. 3.4 issued
- ACM updates this week; no major changes expected
- RTM compliance anticipated; no negative responses received
  • Posting results on Kudu, PCD ftp site (results from MWB testing)
- Post Successfully Tested Messages with explanatory README files as needed. The NIST and Virtual Connectathon test results are not posted, merely require an email to the project manager indicating success.
- ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/
  • Waivers are available for MWB tests based upon past success with the same systems for the same tests.
  • Update on NIST and Virtual Connectathon tests
  • Issues with Profile TIs, MWB item - from participants
  • Remaining ADT Issues
  • Other technical developments
Connectathon
  • Wireless communications at the Connectathon and Showcase
- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
  • Excel Status Workbook
Showcase - Update
  • Task Force Update
- Meeting yesterday addressing PCD's messages, scenarios
- Beginning design of structures; request for physical requirements
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other

December 2009 Meetings

Agenda Twenty-First Meeting December 1, 3 pm EST PCD Connectathon&Showcase 2009-12-01 Webex

Pre-Connectathon Tests
  • Status of test documents
- ACM issues raised by Monroe
  • Posting results on Kudu, PCD ftp site (results from MWB testing) - as soon as possible
- Post Successfully Tested Messages with explanatory README files as needed. The NIST and Virtual Connectathon test results are not posted, merely require an email to the project manager indicating success.
- ftp://ftp.ihe.net/Patient_Care_Devices/ConnectathonsIncludingProcessAndTesting/YR4-2010Connectathon-PreConnectathonTesting/SampleMessages/
  • Waivers are available for MWB tests based upon past success with the same systems for the same tests.
  • Update on NIST and Virtual Connectathon tests
- Recruiting PAM, PDQ Sources
  • Issues with Profile TIs, MWB item - from participants
  • Remaining ADT Issues
  • Other technical developments
Connectathon
  • Wireless communications at the Connectathon and Showcase
- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
  • Excel Status Workbook
Showcase - Update
  • New Drawings for Next Week
- Physical requirements and utilities
  • Task Force Update
- Meeting Friday for Pacemaker Scenario
- Beginning design of structures; request for physical requirements
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other

Agenda Twenty-Second Meeting December 8, 3 pm EST PCD Connectathon&Showcase 2009-12-08 Webex

Pre-Connectathon Tests
  • ADT: Can we eliminate the need for PCD-specific PAM, PDQ sources this year?
- Look ahead to next year
  • Update on NIST and Virtual Connectathon tests
- Recruiting PAM, PDQ Sources
  • Issues with Profile TIs, MWB item - from participants
  • Remaining ADT Issues
  • Other technical developments
Connectathon
  • Wireless communications at the Connectathon and Showcase
- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
  • Excel Status Workbook - any revisions? missing contact information (cell phones)
  • Table layout, power and network requirements (e.g., more than one Ethernet IP address)
Showcase - Update
  • Task Force Update
- Meeting lst Friday for Pacemaker Scenario
- Beginning design of structures; request for physical requirements
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other


Agenda Twenty-Third Meeting December 15, 3 pm EST PCD Connectathon&Showcase 2009-12-15 Webex

Pre-Connectathon Tests
  • Survey of Lessons Learned and Potential Improvements
  • Issues with Profile TIs, MWB item - from participants
  • Other technical developments
Connectathon
  • Process, training, what to bring
  • Wireless communications at the Connectathon and Showcase
- Coordinate with Steve Moore if the wireless folks need fixed IP addresses.
- Coordinate with Matt Barth on network infrastructure. Matt is doing both connectathon and showcase again.
  • Excel Status Workbook
  • Remaining ADT Issues
Showcase - Update
  • Task Force Update
  • Design of structures; request for physical requirements
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other


Agenda Twenty-Fourth Meeting December 22, 3 pm EST PCD Connectathon&Showcase 2009-12-22 Webex placeholder

Pre-Connectathon Tests
  • Survey of Lessons Learned and Potential Improvements
  • Issues with Profile TIs, MWB item - from participants
  • Other technical developments
Connectathon
  • Process, training, what to bring
  • Wireless and Ethernet communications at the Connectathon and Showcase
- Contact Steve if external access is required
  • Remaining ADT Issues
Showcase - Update
  • Task Force Update
  • Design of structures; request for physical requirements
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other

January 2010 Meetings

Agenda Twenty-Fifth Meeting January 5, 3 pm EST PCD Connectathon&Showcase 2010-01-05 Webex

Pre-Connectathon Tests
  • Survey of Lessons Learned and Potential Improvements
  • Issues with Profile TIs, MWB item - from participants
  • Other technical developments
Connectathon
  • Process, training, what to bring
  • Wireless and Ethernet communications at the Connectathon and Showcase
- Contact Steve if external access is required
  • Remaining ADT Issues
Showcase - Update
  • Task Force Update
  • Design of structures; request for physical requirements
  • Showcase schedule from move in to tear down
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other

Agenda Twenty-Sixth Meeting January 19, 3 pm EST PCD Connectathon&Showcase 2010-01-19 Webex

Pre-Connectathon Tests
  • Survey of Lessons Learned and Potential Improvements
- Comments on Pre-Connectathon Tests looking back (number, relevance, etc.)
  • Issues with Profile TIs, MWB item - from participants
- Survey Monkey and discussion
  • Other technical developments
Connectathon
  • Lessons Learned and Potential Improvements
- Survey Monkey and discussion
Showcase
  • Bar Code and Patient IDs
  • Task Force Update - Snapshot Forms, Scripts, Other Items
  • Design of structures - request for physical requirements, other changes
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other


Agenda Twenty-Seventh Meeting January 25, 10 am EST PCD Connectathon&Showcase 2010-01-25 Webex

Pre-Connectathon and Connectathon Tests and Processes
  • Review wall assignments, snapshots and block diagrams Walls 1, 2 to assure all systems are represented and
- assure that multiple instances of vendors can be supported where needed
  • Review and edit the Snapshot document for at least Walls 1, 2
  • Review the “stories” (clinical and technical story outlines)
  • Review titles, theme – one theme for all walls, two sentence descriptors
  • Review posters Walls 1, 2
- Posters for HIMSS production are due in final form Thursday for Manny to send Friday
  • Solicit volunteers to develop the docent scripts
- Will docents wear white coats?
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other

Agenda Twenty-Eighth Meeting January 26, 3 pm EST PCD Connectathon&Showcase 2010-01-26 Webex

- assure multiple instances of vendors can be supported
  • Review and edit the Snapshot document for at least Walls 3, 4
  • Review the “stories” (clinical and technical story outlines)
- Review titles, theme – one theme for all walls, two sentence descriptors
  • Review posters Walls 3, 4
- Posters for HIMSS production are due in final form Thursday for Manny to send Friday
- What size should the posters be?
- What size should the posters be?
  • Review posters for top banners (all 4 walls) and logos
  • Solicit volunteers to develop the docent scripts
  • Patient IDs, MRNs, bar codes
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other

February 2010 Meetings

Agenda Twenty-Ninth Meeting February 2, 3 pm EST PCD Connectathon&Showcase 2010-02-02 Webex

Showcase
  • Question: Any MUST CHANGE issues with Walls 1-3 Snapshots?
  • Question: When may we expect remaining posters?
  • Review block diagrams
- Select among ACM options
  • Review docent scripts
- Scripts should refer to other walls, meaningful use
  • Call for review of network and IP requirements (use the existing spreadsheet)
  • Docent recruitment
  • AAMI Mini-Showcase (next week?)
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other

Agenda Thirtieth Meeting February 9, 3 pm EST PCD Connectathon&Showcase 2010-02-09 Webex

Showcase
  • Question: Any MUST CHANGE issues with Walls 1-3 Block Diagrams, Snapshots?
- Wall 3: Cerner for Hill-Rom interface, add AR to pumps' support
- Wall 4: Epic EMR with IOP, no bed, LiveData clinical workflow alarm, Amcom, ...
  • Posters were printed yesterday. Question: When may we expect remaining posters?
  • Review docent scripts, availability
- Docent rehearsals next week - Doodle survey
- Scripts should refer to other walls, meaningful use
  • Call for review of network and IP requirements (use the existing spreadsheet)
  • Docent recruitment update
  • AAMI Mini-Showcase - initial expression of interest, update on effort
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other

Agenda Thirty First Meeting February 16, 3 pm EST PCD Connectathon&Showcase 2010-02-16 Webex

Showcase
  • Walls 1-4 Snapshots with Block Diagrams
  • Floor plan
  • Walls - update on design
  • Posters were printed; additional posters to go to Elli
  • Handouts to printer today
- CABG or Trauma?
- Resources on back of business card
- Other
  • Review docent scripts, availability
- Docent rehearsals schedule
- Scripts should refer to other walls, meaningful use
  • Handouts to printer; PDF available for participant use
  • AAMI Mini-Showcase - initial expression of interest, update on effort
  • Lessons learned from Showcase experience
  • Next meetings
- Next Tuesday
- Following HIMSS10 or a week for recovery first?
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other

Agenda Thirty Second Meeting February 23, 3 pm EST PCD Connectathon&Showcase 2010-02-23 Webex

Showcase
  • Review docent scripts, availability
- Docent schedule at HIMSS10
- Docent rehearsals schedule
- Scripts should refer to other walls, meaningful use
  • Handouts
  • Lessons learned from Showcase experience
  • AAMI Mini-Showcase - initial expression of interest, update on effort
Action Items - tracked on a Google Doc page: http://spreadsheets.google.com/ccc?key=0AhUkNc_rKDnudFZKVUFrZEZQWmNBcU9RWnhVS0FCenc&hl=en
Other

March 2010 Meetings

Agenda Thirty Third Meeting March 16, 3 pm EDT PCD Connectathon&Showcase 2010-03-16 Webex

  • Review of previous meetings Discussion Summaries PCD Connectathon&Showcase 2010-02-23 Webex,
  • Develop HIMSS11 Concepts: number, type of profiles/systems; number, type of stories; size and shape of structure
  • Begin developing Mini-Showcase at AAMI: companies, systems, concepts
  • Next Meeting


Agenda Thirty Fourth Meeting March 23, 3 pm EDT PCD Connectathon&Showcase 2010-03-23 Webex

HIMSS11 (Continued):

  • Identify profiles likely to be demonstrated.
- Which profiles will be shown on each wall?
- Which stories lend themselves to integration with other IHE Domains or other transactions? The attached spreadsheet reflects last week’s discussion.
  • Estimate the number of vendors for each profile.
- For PCD, alternating vendors in a story/tour needs to be minimized. E.g., if we have 5 pump vendors or 5 ACM AC vendors, how many can be used simultaneously in a single story?
  • How many “walls” might be needed?
  • From Gary:
- Act 3 Care theme Emergency Care---PCD emergency room setting feeds info to EMR or the scenario could feed into a PCD OR or ICU setting;
- Act 6 Care theme Chronic Care—patient condition does not improve CHF secondary to heart valve deterioration. Patient scheduled for surgery—moved to PCD surgery scenario;
- Act 24 Care Theme Clinical Decision support—stroke patient is directly admitted to the PCD ICU.
- Just some suggested based on last year. Would a wall not a cube be better? If PCD is on the outside, as we have been, the wall will represent ED, Surgery, ICU maybe step down. A closet for the infrastructure stretches behind the units.
- Other option is a centered pentagon. Should we drop the new horizons wall? Would it be better to include future concepts in the general scenarios?

AAMI Mini-Showcase (Continued):

  • We have a 10 x 20 booth in a prime location.
  • It is adjacent to the ACCE booth; we may collaborate on the entire 10 x 30 space.
  • AAMI will provide tables – this will largely be a table top and poster exhibit. I have the posters we used in Atlanta for reuse in Tampa.
- If necessary we can brainstorm other display techniques (e.g., a bookcase to hold displays and function like a wall).
  • There will be no exhibitor charges, and you need not be exhibiting elsewhere in the hall to participate in this activity.
- There may be a minimal charge for utilities or other support that will be shared by all, depending upon what we develop.
- ACCE has offered $2000. to help defray expenses (this may be used for handouts, etc.).
  • For discussion of feasibility only, let’s assume we use 6 x 2 foot tables in one row, 18’ long:
- Pump(s) on pole with LCD monitor, keyboard, mouse on table – 2 pump vendors to date.
- IOP – 1 vendor to date
- Bedside monitor(s) with LCD monitor, keyboard, mouse on table – 1 vendor to date.
- EMR or CIS; LCD monitor, keyboard, mouse on table – possible CIS.
- Alarm system with data from pump(s), monitor(s) and phone or display – possible AM and phone system; various ARs.
- Gateways, servers, etc. under the table.
  • The above, and more should be feasible. Those highlighted in green on the attached spreadsheet have indicated an interest in participating.
  • Determine if a table top presentation will work for the device(s) and system(s) or if we need research a better way.
- LAN provided by a participant or rented.
- Electrical power.
  • Posters from Atlanta and possibly one or two new ones.
- Posters from HIMSS10 are available for reuse (most of the inventory is attached).
- Determine if a “block diagram” or other poster is needed to explain the demonstration.
- Banner or other indication of the booth and purpose.
- We will brainstorm how best to display these, how to hang them without a wall.
  • Handouts – potentially extracting the most important parts of the HIMSS10 handout and reducing it to one double-sided page, if possible. A first draft of a greatly edited version of the handout employed in Atlanta is attached to initiate development. Please review and comment by email to me.
  • Volunteers to staff the booth – 1 volunteer to date.
  • Ken suggested a large LCD monitor showing some sort of animation which illustrates the various data paths and how they end up from the device into the EPR. Not sure exactly what this would look like but it should tell the story more dynamically than a bunch of devices and display monitors.

Discussion of Connectathon Lessons Learned and Other Issues


  • Next Meeting


Agenda Thirty Fifth Meeting March 30, 3 pm EDT PCD Connectathon&Showcase 2010-03-30 Webex AAMI Mini-Showcase (Continued):

  • We have a 10 x 20 booth in a prime location.
  • It is adjacent to the ACCE booth; we may collaborate on the entire 10 x 30 space.
  • AAMI will provide tables – this will largely be a table top and poster exhibit. I have the posters we used in Atlanta for reuse in Tampa.
- If necessary we can brainstorm other display techniques (e.g., a bookcase to hold displays and function like a wall).
  • There will be no exhibitor charges, and you need not be exhibiting elsewhere in the hall to participate in this activity.
- There may be a minimal charge for utilities or other support that will be shared by all, depending upon what we develop.
- ACCE has offered $2000. to help defray expenses (this may be used for handouts, etc.).
  • For discussion of feasibility only, let’s assume we use 6 x 2 foot tables in one row, 18’ long:
- Pump(s) on pole with LCD monitor, keyboard, mouse on table – 2 pump vendors to date.
- IOP – 1 vendor to date
- Bedside monitor(s) with LCD monitor, keyboard, mouse on table – 1 vendor to date.
- EMR or CIS; LCD monitor, keyboard, mouse on table – possible CIS.
- Alarm system with data from pump(s), monitor(s) and phone or display – possible AM and phone system; various ARs.
- Gateways, servers, etc. under the table.
  • The above, and more should be feasible. Those highlighted in green on the attached spreadsheet have indicated an interest in participating.
  • Determine if a table top presentation will work for the device(s) and system(s) or if we need research a better way.
- LAN provided by a participant or rented.
- Electrical power.
  • Posters from Atlanta and possibly one or two new ones.
- Posters from HIMSS10 are available for reuse (most of the inventory is attached).
- Determine if a “block diagram” or other poster is needed to explain the demonstration.
- Banner or other indication of the booth and purpose.
- We will brainstorm how best to display these, how to hang them without a wall.
  • Handouts – potentially extracting the most important parts of the HIMSS10 handout and reducing it to one double-sided page, if possible. A first draft of a greatly edited version of the handout employed in Atlanta is attached to initiate development. Please review and comment by email to me.
  • Volunteers to staff the booth – 1 volunteer to date.
  • Ken suggested a large LCD monitor showing some sort of animation which illustrates the various data paths and how they end up from the device into the EPR. Not sure exactly what this would look like but it should tell the story more dynamically than a bunch of devices and display monitors.

Discussion of Connectathon Lessons Learned and Other Issues

April 2010 Meetings

Agenda Thirty Sixth Meeting April 6, 3 pm EDT PCD Connectathon&Showcase 2010-04-06 Webex AAMI Mini-Showcase (Continued):

  • We have a 10 x 20 booth in a prime location.
- Steve Merritt's Suggestions:
Need to get the point across about "purchasable" products or timelines of when purchasable
Need to water-down the technical details as much as possible
The target audience will be less informatics-focused and more clinical-device-side and safety focused
Need to get this audience to start demanding IHE - help them understand how this reduces their costs and resource requirements.
- Individuals participating in the demonstration would need to register for the conference in order to attend the education sessions.
  • ACCE booth collaboration on the entire 10 x 30 space.
  • AAMI will provide tables – this will largely be a table top and poster exhibit. I have the posters we used in Atlanta for reuse in Tampa.
- If necessary we can brainstorm other display techniques (e.g., a bookcase to hold displays and function like a wall).
  • There will be no exhibitor charges, and you need not be exhibiting elsewhere in the hall to participate in this activity.
- There may be a minimal charge for utilities or other support that will be shared by all, depending upon what we develop.
- ACCE has offered $2000. to help defray expenses (this may be used for handouts, etc.).
  • We currently assume we use 2 rows of 6 x 2 foot tables, one higher than the other:
- We still need a DOC
- LAN provided by a participant or rented.
- Electrical power.
  • Posters from Atlanta and possibly one or two new ones.
- Posters from HIMSS10 are available for reuse (most of the inventory is attached).
- Determine if a “block diagram” or other poster is needed to explain the demonstration.
- Banner or other indication of the booth and purpose.
- We will brainstorm how best to display these, how to hang them without a wall.
  • Handouts – potentially extracting the most important parts of the HIMSS10 handout and reducing it to one double-sided page, if possible. A first draft of a greatly edited version of the handout employed in Atlanta is attached to initiate development. Please review and comment by email to me.
  • Volunteers to staff the booth – 1 volunteer to date.

Discussion of Showase Lessons Learned and Other Issues

| April 14 Meeting Was Cancelled |


Agenda Thirty Seventh Meeting April 20, 3 pm EDT PCD Connectathon&Showcase 2010-04-20 Webex AAMI Mini-Showcase (Continued):

  • We have a 10 x 20 booth in a prime location.
- Steve Merritt's Suggestions:
Need to get the point across about "purchasable" products or timelines of when purchasable
Need to water-down the technical details as much as possible
The target audience will be less informatics-focused and more clinical-device-side and safety focused
Need to get this audience to start demanding IHE - help them understand how this reduces their costs and resource requirements.
- Individuals participating in the demonstration would need to register for the conference in order to attend the education sessions.
  • ACCE booth collaboration on the entire 10 x 30 space.
  • Table top demonstration plus posters
- AAMI will provide one table
  • There will be no booth rental exhibitor charges, and you need not be exhibiting elsewhere in the hall to participate in this activity.
- There will be a minimal charge for utilities or other support that will be shared by all, depending upon what we develop.
- ACCE has offered $2000. to help defray expenses (this may be used for handouts, etc.).
  • We currently assume we use 2 rows of 8 x 2 foot tables, one higher than the other:
- We still need a DOC
- LAN provided by a participant or rented.
- Electrical power and other items listed in Excel spreadsheet.
  • Posters and signage:
- Posters from HIMSS10 are available for reuse (see PCD HIMSS10 Showcase for posters).
- Determine if a “block diagram” or other poster or handout is needed to explain the demonstration.
- Banner or other indication of the booth and purpose.
- Handouts – potentially extracting the most important parts of the HIMSS10 handout and reducing it to one double-sided page.
  • Volunteers to staff the booth – 1 volunteer to date.


Agenda Thirty Eighth Meeting April 27, 3 pm EDT PCD Connectathon&Showcase 2010-04-27 Webex AAMI Mini-Showcase (Continued):

  • We have a 10 x 20 booth in a prime location.
- Steve Merritt's Suggestions:
Need to get the point across about "purchasable" products or timelines of when purchasable
Need to water-down the technical details as much as possible
The target audience will be less informatics-focused and more clinical-device-side and safety focused
Need to get this audience to start demanding IHE - help them understand how this reduces their costs and resource requirements.
- Scott's Suggestions:
I'm not sure any of us know what their hot buttons are. I strongly suggest that we do not create a script and tour but set up our table based on themes (almost like the walls at HIMSS). As BioMeds's approach they can be asked what is of interest to them and directed to the section of the table that can demonstrate that interoperability. Once the demonstration is completed the demo person can inform the BioMed of the other interoperability offerings available and move them to that section. The table displays can possibly be segmented based on Profile so it will be easier to focus on specifics rather than generalities.
- Individuals participating in the demonstration would need to register for the conference in order to attend the education sessions.
  • ACCE booth collaboration on the entire 10 x 30 space.
  • Table top demonstration plus posters
  • There are no booth rental exhibitor charges, and you need not be exhibiting elsewhere in the hall to participate in this activity.
- There will be a minimal charge for utilities or other support that will be shared by all, depending upon what we develop.
- ACCE has offered $2000. to help defray expenses (this may be used for handouts, etc.).
  • We currently assume we use 2 rows of 8 x 2 foot tables, one higher than the other:
- We have sufficient participation to demonstrate multiple profiles.
- LAN provided by a participant or rented.
- Electrical power and other items listed in Excel spreadsheet.
  • Posters, handouts and signage:
- Posters from HIMSS10 are available for reuse (see PCD HIMSS10 Showcase for posters).
- Determine if a “block diagram” or other poster or handout is needed to explain the demonstration.
- Banner or other indication of the booth and purpose. Sarah suggested "Device Interoperability for the Integrated EHR".
- Handouts – approval of Jeff's edits, concept.
  • Volunteers to staff the booth – Jon Blasingame, Scott, Al volunteered to date.


May 2010 Meetings

Agenda Thirty Ninth Meeting May 11, 3 pm EDT PCD Connectathon&Showcase 2010-05-11 Webex AAMI Mini-Showcase (Continued):

  • Recommendations:
- Steve Merritt:
Need to get the point across about "purchasable" products or timelines of when purchasable
Need to water-down the technical details as much as possible
The target audience will be less informatics-focused and more clinical-device-side and safety focused
Need to get this audience to start demanding IHE - help them understand how this reduces their costs and resource requirements.
- Scott's:
I'm not sure any of us know what their hot buttons are. I strongly suggest that we do not create a script and tour but set up our table based on themes (almost like the walls at HIMSS). As BioMeds's approach they can be asked what is of interest to them and directed to the section of the table that can demonstrate that interoperability. Once the demonstration is completed the demo person can inform the BioMed of the other interoperability offerings available and move them to that section. The table displays can possibly be segmented based on Profile so it will be easier to focus on specifics rather than generalities.
  • Registration:
- Those setting up and demonstrating need access.
- Individuals participating in the demonstration would need to register for the conference in order to attend the education sessions.
  • ACCE booth collaboration on the entire 10 x 30 space.
  • Table top demonstration plus posters
- We need to settle on the "title" and order the signs.
- We need the "story" - volunteers sought.
- We need the posters that describe what is shown, what is coming later. Posters from HIMSS10 are available for reuse (see PCD HIMSS10 Showcase for posters).
- We need to finalize the handout.
- We have staffing; feel free to join in – Jon Blasingame, Scott (Sunday, Monday), Al, Erin, John Rhoads.
- We need a leader to manage the installation.


Agenda Fortieth Meeting May 25, 3 pm EDT PCD Connectathon&Showcase 2010-05-25 Webex AAMI Mini-Showcase (Continued):

AAMI Mini-Showcase Planning

  • Handouts:
- Primary handout inserted in AAMI registration packages:
- MEM handout if permission is granted):
  • Posters:
- describing the demonstration:
- describing MEM:
o Ken/Steve:
o Steve's 24x7 article
  • Demonstrations:
- Furnishings, electrical have been ordered through ACCE
  • Set up
- Monroe will coordinate
- Need to set a time to begin
  • Elevator speech
  • Next meeting date

June 2010 Meetings

Agenda Forty First Meeting June 15, 3 pm EDT PCD Connectathon&Showcase 2010-06-15 Webex AAMI Mini-Showcase (Continued):

  • Handouts:
- Primary handout inserted in AAMI registration packages:
- MEM handout (if permission is granted)
- Handout for Saturday's ACCE Symposium
  • Posters:
- describing the demonstration
- describing MEM
- Steve's 24x7 article (see permission issue above)
  • Set up
- Please bring Ethernet and Power Cords and Power Strips
- Monroe will coordinate
- Set up at 11 am Friday
  • Staffing the booth
- Vendor recruiting
  • Elevator speech
  • Next meeting date

2009-10 Calendar

This includes placholders; lines preceded with * provide current knowledge of dates This is intended as a work in progress, with milestones added or modified throughout the cycle. Dates to be assigned.

  • Connectathon Registration August 28 - September 30, 2009
  • Showcase Registration August 28 - September 30, 2009
  • Connectathon January 11-15, 2010 (plan to arrive no later than the 10th)
  • Showcase March 1-4, 2010 (watch for date for setup, likely the Saturday before)
Development of Test Concepts with the Profile WGs - ____
Development of the Pre-Connectathon Tests (MWB and NIST tools) to qualify systems for the Virtual and actual Connectathons
Development of Virtual Connectathon Procedures, Tests
Development of Connectathon Tests
Reporting successful completion of Pre-Connectathon Qualifying Tests (initial qualifying MESA test, PCD profile tests)
Conduct of Virtual Connectathon Testing and reporting results
Submission of networking requirements to Steve Moore - Nov. ___ with MAC addresses due to Steve by ___
Definition of Scenario for Showcase - Rough draft __
Final Scenario for Showcase
Design of Showcase Space
Definition of space, utility and other requirements for the Showcase


Links to PCD Home and Meetings

PCD Home