Difference between revisions of "PCD Connectathon&Showcase 2008-11-05 Webex"

From IHE Wiki
Jump to navigation Jump to search
m (→‎Discussion: add to notes)
(→‎Discussion: additions to meeting notes)
Line 69: Line 69:
 
| '''Introductions & Agenda Review''' <br>- Manny
 
| '''Introductions & Agenda Review''' <br>- Manny
 
| '''Status/Discussion:'''
 
| '''Status/Discussion:'''
No changes
+
| No changes
 
'''Decisions/Issues:'''
 
'''Decisions/Issues:'''
  
Line 84: Line 84:
 
|-
 
|-
 
| align="center" | 3
 
| align="center" | 3
| '''Action Items Review''' <br>- Chair
+
| '''Action Items Review''' <br>- Manny
 
| '''Status/Discussion:'''
 
| '''Status/Discussion:'''
 
:* Reviewed registrations, updated spreadsheet will be distributed (r13)
 
:* Reviewed registrations, updated spreadsheet will be distributed (r13)
Line 104: Line 104:
 
| '''Issues and Questions''' <br>- Manny
 
| '''Issues and Questions''' <br>- Manny
 
| '''Status/Discussion:'''
 
| '''Status/Discussion:'''
:* Reminder that Pete Rontey will provide the initial tutorial for the VA. Those interested should contact Peter for admission.
+
:* Reminder that Pete Rontey will provide the initial tutorial for VA staff. Those interested should contact Peter for an invitation.
 
:* The Advanced MWB Tutorial will be scheduled for 1-3 pm Monday Nov. 17, which appears acceptable to all. Webex information to be provided.
 
:* The Advanced MWB Tutorial will be scheduled for 1-3 pm Monday Nov. 17, which appears acceptable to all. Webex information to be provided.
 
:* No other significant issues.
 
:* No other significant issues.
Line 117: Line 117:
 
| '''Status/Discussion:'''
 
| '''Status/Discussion:'''
 
:* Updated block diagram will be distributed.
 
:* Updated block diagram will be distributed.
:* Participants were asked to review the spreadsheets and offer corrections, changes.
+
:* Participants were asked to review the spreadsheet identifying system participation and offer corrections, changes.
 
:: Brian indicated that GE's DOF is a stretch goal.
 
:: Brian indicated that GE's DOF is a stretch goal.
:: Cerner will use the DOF, and that may be a model for short discussion of its importance by them and others.
+
:: Cerner will use the DOF to obtain only pump data, and that may be a model for short discussion of its importance by them and others.
 
:* Participants were asked to consider what they want to say as the detailed Scenario is developed and then the Script.
 
:* Participants were asked to consider what they want to say as the detailed Scenario is developed and then the Script.
 
:: Brett suggested several reasons why each company representative should provide its  portion of the Script, rather than having a single person present for all on a tour or single site (OR, ICU, SD). Manny reviewed Bikram's suggestion for the latter. A decision will be made when the Script is drafted.
 
:: Brett suggested several reasons why each company representative should provide its  portion of the Script, rather than having a single person present for all on a tour or single site (OR, ICU, SD). Manny reviewed Bikram's suggestion for the latter. A decision will be made when the Script is drafted.
Line 126: Line 126:
  
 
'''Action(s):'''
 
'''Action(s):'''
:*  
+
:* Manny to contact Jim Higgins (Cerner) to coordinate Hill-Rom support. They provided a bed and a gurney in the past.
 +
:* Sarah Higgins to identify contacts at Zebra and Manny to talk with them about bar code printers.
  
 
|-
 
|-
Line 134: Line 135:
 
:* Participants were asked to indicate if test cases were needed before Thanksgiving. None were requested at the moment.
 
:* Participants were asked to indicate if test cases were needed before Thanksgiving. None were requested at the moment.
 
'''Decisions/Issues:'''
 
'''Decisions/Issues:'''
:*
 
  
 
'''Action(s):'''
 
'''Action(s):'''
:*
 
  
 
|}
 
|}

Revision as of 22:22, 5 November 2008

PCD Connectathon/Showcase WG

Agenda

Action Items
  • Open Date: Monitor registrations for various actors.
  • Nov. 5: Determine how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
Likely to select a number of parameters, etc. for testing this year
Relatively small addition to one or two tests for each profile
  • Oct. 15: Why are more companies not implementing SPD query within DOC? Which companies will implement and test this query this year?
Issues and questions about:
  • The Trial Implementation version of any profiles
  • The MWB
Those needing the introductory Tutorial should contact Peter
November 17, 1 pm EST looks likely for the Advanced
  • HL7
  • Timeline
  • Interview Form, Kudu, Installation Test (PAM, PDQ)
Connectathon and Showcase Planning
  • Connectathon and earlier tests
Scenario update, see below, and
  • How would we demo in the short time available?
  • Should we plan on a stronger Docent/Tour Leader role for continuity?
Status report on Test Case development
  • DEC
  • ACM
  • PIV
  • RTM

IHE PCD Showcase Scenario Draft 2009

Overview: Male patient, 65 years, BMI 32 (slightly overweight), coronary artery disease (AMI 6 months ago), moderate COPD (smoker), compensated renal insufficiency (40% GFR). Adenocarcinoma of the lower esophagus (close to the entry into the stomach), scheduled for gastrectomy and distal, transabdominal esophagectomy.


Operating Room Patient needs full invasive CV monitoring starting at induction. Patient identified on each of the 3 vendor pumps and started on 3 infusions: Dextrose 5% 1000 mL @ 75 mL/hr, propofol, @100 mcg/kg/min and morphine 100 mg/ dextrose 5% 100 nL @ 1 mg/hr. Status of all 3 infusions is viewable on monitors via PCD01/02.

Intensive Care Unit After surgery patient remains intubated and is transferred to ICU. After initial stabilization (some fluids according to CO and SvO2, low dose Dopamine) rapid weaning of the ventilator on SmartCare/PS.

Using PIV, the nurse uses BCMA to send low dose Dopamine 400 mg in Dextrose 5% 250 mL @ 2.5 mcg/kg/min) to pump to aid kidney perfusion. The infusion status is viewable on monitors via PCD01/02

The patient is extubated after 12 hours after admission to ICU. Ventilator Alarms are managed, routed and displayed Discharge to SDU after 36 hours.

Step-Down Unit On SDU patient require still monitoring of HR, BP, RR and SpO2

Antibiotic continued for 72 hours. Vancomycin 1 g in Dextrose 5% 250 mL is infused over 60 minutes via IV device. Using PIV, the nurse uses BCMA to send Vancomycin order data to pump. The infusion status is viewable on monitors via PCD01/02

Participants

Al Engelbert, Brett Cohen, Robert Cuyugan, Robert Flanders, Brian Fors, Ken Fuchs, Sarah Hopkins, Gary Meyer, Monroe Pattillo, Scott Zaffrin, Khalid Zubaidi, Manny Furst

Discussion

Item Topic Discussion
1 Introductions & Agenda Review
- Manny
Status/Discussion: No changes

Decisions/Issues:

Action(s):

2 Approval of Meeting Notes should be made to the Wiki; significant issues brought to the next meeting
- Manny
Status/Discussion:

Decisions/Issues:

Action(s):

3 Action Items Review
- Manny
Status/Discussion:
  • Reviewed registrations, updated spreadsheet will be distributed (r13)
  • Reviewed John Garguilo's ideas for testing RTM:
Limited testing this year of a defined set of parameters, UOM, etc. Likely to be one or two tests for each profile.
Testing possible during pre-connectathon, virtual connectathon and/or connectathon; testing in advance will minimize time spent at Connectathon
May utilize log of messages received, then utilize NIST tools
Brett asked about use of middleware to validate; NIST looking into MWB
  • Implementation of DOF: Cerner will use DOF to restrict data to pumps. Brett indicated DOF/SPD is an essential feature; example: OR using a few pumps, but hospital has several hundred, need to focus on those in use in OR. Robert Flanders agreed, indicating that their gateway reduces the flow of data from physiologic monitors.

Decisions/Issues:

Action(s): Ask John to join one or the other meeting next week.


4 Issues and Questions
- Manny
Status/Discussion:
  • Reminder that Pete Rontey will provide the initial tutorial for VA staff. Those interested should contact Peter for an invitation.
  • The Advanced MWB Tutorial will be scheduled for 1-3 pm Monday Nov. 17, which appears acceptable to all. Webex information to be provided.
  • No other significant issues.

Decisions/Issues:

Action(s):

5 Connectathon and Showcase Planning
- Manny
Status/Discussion:
  • Updated block diagram will be distributed.
  • Participants were asked to review the spreadsheet identifying system participation and offer corrections, changes.
Brian indicated that GE's DOF is a stretch goal.
Cerner will use the DOF to obtain only pump data, and that may be a model for short discussion of its importance by them and others.
  • Participants were asked to consider what they want to say as the detailed Scenario is developed and then the Script.
Brett suggested several reasons why each company representative should provide its portion of the Script, rather than having a single person present for all on a tour or single site (OR, ICU, SD). Manny reviewed Bikram's suggestion for the latter. A decision will be made when the Script is drafted.

Decisions/Issues:

Action(s):

  • Manny to contact Jim Higgins (Cerner) to coordinate Hill-Rom support. They provided a bed and a gurney in the past.
  • Sarah Higgins to identify contacts at Zebra and Manny to talk with them about bar code printers.
6 Test Case Development
- Manny
Status/Discussion:
  • Participants were asked to indicate if test cases were needed before Thanksgiving. None were requested at the moment.

Decisions/Issues:

Action(s):

Return to main WG page which has links to individual meeting pages

PCD Connectathon&Showcase WG 2008-9