Difference between revisions of "PCD Connectathon&Showcase WG 2009-10"
m (→Related Pages and Documents: add another related link) |
m (→July, 2009 Meetings: update) |
||
Line 37: | Line 37: | ||
− | '''1 First meeting [[PCD Connectathon&Showcase 2009-07- | + | '''1 First meeting date and time TBD [[PCD Connectathon&Showcase 2009-07-__ Webex]]''', potential agenda items: |
:* Introductions | :* Introductions | ||
:* Review of WG purpose - collaboration, cooperation, facilitation | :* Review of WG purpose - collaboration, cooperation, facilitation |
Revision as of 22:27, 10 July 2009
This is the entry point for this Working Group in the 2009-10 Connectathon and HIMSS Showcase cycle.
Meeting Purpose
Collaborative effort to discuss implementation and demonstration issues and preparations
Related Pages and Documents
PCD Getting Started page with useful links http://wiki.ihe.net/index.php?title=PCD_Getting_Started
Orientation to IHE Connectathons and Showcases (demonstrations) http://www.ihe.net/north_america/flash/IHE_Educational_Webinar_Series_KickOff/IHE_Educational_Webinar_Series_KickOff.swf
Interpreting IHE Technical Frameworks http://www.ihe.net/north_america/flash/First-TimersSession_June18_2009/First-TimersSession_June18_2009.swf
Other Presentations in the IHE Webinar Series http://www.ihe.net/Events/webinars2009.cfm
PCD Pre-Connectathon Testing 2010
PCD Virtual Connectathon Testing 2010
HIMSS10 Website http://www.himssconference.org/
2010 North American Connectathon Overview - Important to View Periodically http://ihewiki.wustl.edu/wiki/index.php/North_America_2010
WebEx Information
Topic: PCD Connectathon and Showcase Working Group
Dates: Most __days, October through April
Time: _ pm, Eastern Time (New York )
Duration: 60 Minutes
July, 2009 Meetings
1 First meeting date and time TBD PCD Connectathon&Showcase 2009-07-__ Webex, potential agenda items:
- Introductions
- Review of WG purpose - collaboration, cooperation, facilitation
- WG documentation - Wiki page(s) for minutes, action items, Scenario (e.g., one page or one page per meeting)
- Summary of preparation process
- Development of a calendar
- IHE Webinars - instead of F2F
- Developing a list of companies, contacts, profiles, actors - survey
- Technical development
- - Brief description of the MWB and its uses
- - Pre-Connectathon, Virtual Connectathon, Connectathon testing
- - NIST's support
- - Availability of last year's samples and MWB efforts
- - RTM compliance required
- Intro to Showcase Process
- - Design of structure
- - Likelihood that PCD will have multiple tours
- - Developing Scenario(s)
- Last year's experience, lessons learned
- - Orientation, mentoring of those new to the process
- - Coordination between technical and marketing folk
The following are placeholders left here as examples from last year; please watch for an email indicating that the agenda has been established
16th regular meeting PCD Connectathon&Showcase 2009-02-18 Webex PCD Connectathon&Showcase 2009-02-18 Webex
Please add to the list
- Action Items
-
- Issues and questions about:
- Monroe experienced a time out problem with the MWB.
- Appropriate dosing units for drugs
- HL7 coding
- - EUI-64
- Kudu, Connectathon, Showcase
- Any discrepancies on tests
- Issues and questions about:
- Connectathon Planning
- Status report on tests for Connectathon
- Schedule - set up begins Monday at 8, testing at 10 am
- NIST validation of RTM
- Dress code
- Showcase Planning
- Scenario update
- System Assignments - identifying your partners,
- - Tours - rethinking the concepts
- Showcase Internet connections
- Showcase Rehearsal at the Connectathon
- Monitoring progress, issues through the rest of the process
- - Risk Assessment
- -Wiki page for Scripts:
- Showcase Planning
- Scenario update
- System Assignments - identifying your partners,
- - Tours - rethinking the concepts
- Showcase Internet connections
- Showcase Rehearsal at the Connectathon
- Monitoring progress, issues through the rest of the process
- - Risk Assessment
- -Wiki page for Scripts
- Dress code
- Showcase Structure
- - Drawings
- - Logos
- - Signs thanking supporters
August 2009 Meetings
September 2009 Meetings
October 2009 Meetings
November 2009 Meetings
December 2009 Meetings
January 2010 Meetings
2009-10 Calendar
This includes placholders; lines preceded with * provide current knowledge of dates This is intended as a work in progress, with milestones added or modified throughout the cycle. Dates to be assigned.
- Connectathon Registration August 28 - September 30, 2009
- Showcase Registration August 28 - September 30, 2009
- Connectathon January 11-15, 2010 (plan to arrive no later than the 10th)
- Showcase March 1-4, 2010 (watch for date for setup, likely the Saturday before)
- Development of Test Concepts with the Profile WGs - ____
- Development of the Pre-Connectathon Tests (MWB and NIST tools) to qualify systems for the Virtual and actual Connectathons
- Development of Virtual Connectathon Procedures, Tests
- Development of Connectathon Tests
- Reporting successful completion of Pre-Connectathon Qualifying Tests (initial qualifying MESA test, PCD profile tests)
- Conduct of Virtual Connectathon Testing and reporting results
- Submission of networking requirements to Steve Moore - Nov. ___ with MAC addresses due to Steve by ___
- Definition of Scenario for Showcase - Rough draft __
- Final Scenario for Showcase
- Design of Showcase Space
- Definition of space, utility and other requirements for the Showcase
Action Items (Details in meeting notes)
Item Example from last year
- from Jan. 21
- Open Date: Monitor PCD Connectathon registrations periodically.
- Jan. 28: (All) Consider a more effective way to communicate the IHE/PCD message, with fewer presentations.
- Determine which systems provide comparable information within the storyline, even if they are unique in other ways.
- Jan. 28: (Manny) Define data for preload, registration feed for visitors. Consider eliminating printers.
- Jan. 28: (Manny) Address GE's concerns about staffing their Enterprise system.
- Jan. 28: (Manny) Update on ADT/patient-visitor id and association with systems.
- Update on ADT/patient-visitor id and association with systems. Focused meeting, include diagram and other information to be provided.
- John Donnelly will address this as part of the Showcase focused portion of this meeding.
- Check with Bill Klaver, John Donnelly, and Steve Moore. A04 will work this year
- Verify that we will have an A04 message this year. Request preloaded data (medication order, demographics).
- Provide material for the Scenario (outline or brief description) to be followed by Manny compiling a single view.
- Identify overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
- Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow
- Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
- Zebra has agreed to provide printers. We need to decide between two suggested models; determine if Epic can use the same Postscript printer Ruth provides; assure access to the registration kiosk.
- Updates on how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
- (Pump Vendors, Enterprise Systems) Vendors will provide their own approach to bar coding for drugs, infusions, patients and caregivers.
- Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.
- Identify the devices to be connected to middleware, the coding of parameters, identifying partners for testing and demonstration.
- Coordinate ADT testing (Virtual and Connectathon) with Bill Klaver, coordinate with Steve Moore, John Donnelly, seek a backup system.
- Update name for alarm product
- Confirm structure diagrams and utilities
- Define contents of fourth wall
- Set PCD Docent training WebEx / on site (and run through at Connectathon)
- Webex run through of draft Scenario
- Update block diagram with locations of SIS, Cerner, Capsule
- Steve Moore needs MAC addresses
- Virtual Connectathon (tentative deadline for completion; partners may test anytime before this)
- Determine if Cerner can support the AR actor in the Showcase.
- Change proposal to PIB for ADT in PIB option.
Closed Action Items
Examples from 2009
- Why are more companies not implementing SPD query within DOC? Which companies will implement and test this query this year?
- Review items in http://wiki.ihe.net/index.php?title=IHE_PCD_2009_Showcase_Workshop_2008-10-28_to_30#Meeting_Purpose and determine which are transferred here.
- Manny to contact Jim Higgins (Cerner) to coordinate Hill-Rom support. They provided a bed and a gurney in the past. Rita indicated that Cerner will coordinate Hill-Rom and Stryker beds and a gurney.
- (Manny) Emails to Lisa with feedback on the Workshop
- (Manny) Draft ACM tests ready for review - covered elsewhere
- (Manny) HIMSS badge - MRN? - covered elsewhere
- Ruth indicated that GE Enterprise includes the 5-rights data entry.
- Special meeting was held to address ADT, other ID. Al had provided information about PAM, the need for A04 which is in ITI-31, not ITI-30, will be part of patient ID issue.
- Colin FX (Epic) and Ruth (GE) offered approaches to support patient ID/registration requirements / issues from discussion.
- (All) Patient IDs, ADT/PIB issues, device and caregiver ID are covered in other items on the list.
- (Manny, pump vendors, any others) Wireless spectrum management. Didi is not supportive of addressing this throughout the convention hall, recommends approaching John Donnelly. Manny will contact John.
- Emergin, LiveData) Connectathon on site testing with Polycom is scheduled for Thursday, Friday morning.
- (Ruth) Does GE Enterprise include the 5-rights data entry?
- Sarah Higgins identified contacts at Datamax and Zebra.
- (Manny, pump vendors, any others) Wireless spectrum management. Didi is not supportive of addressing this throughout the convention hall, recommends approaching John Donnelly. Manny will contact John.
- (Emergin, LiveData) Schedule Connectathon on site testing with Polycom
- (Manny) Summarize focused meeting, include diagram.
- (Bikram) Now unlikely to have bidirectional distributed demo - pushing data in from their booth to the demo.
- (Pump Vendors, Enterprise Systems) Vendors will provide their own approach to bar coding for drugs, infusions, patients and caregivers.
- Business card for Showcase w/ all companies listed + Booth numbers - the Showcase handout may address this.
- Cerner added the AR actor.
- (Manny) Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.
- (Bikram, Rita/Jim Higgins) Identify the devices to be connected to middleware, the coding of parameters, identifying partners for testing and demonstration.
- (Brett) Update name for alarm product
- (Manny) Verify that we will have an A04 message this year. Request preloaded data (medication order, demographics).
- Participants indicated they can test with two devices/patients' data (e.g., two pumps, two beds, two ARs or one AR with two patients)?
- Structure:
- - Utilities (electric, network)
- - Physical requirements (size, mounts if larger, etc)
- (All) The revised approach permits closing the following:
- - Determine which systems provide comparable information within the storyline, even if they are unique in other ways.
- - (All) Provide material for the Scenario (outline or brief description), consistent with the overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
- - Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow
- - Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
- (Manny) Define data for preload, registration feed for visitors. Consider eliminating printers.
- (Manny) Address GE's concerns about staffing their Enterprise system.
- Virtual Connectathon:
- - ADT: Bill Klaver for Virtual Connectathon; John Donnelly, and Steve Moore for Connectathon and Showcase. A04 will work this year
- (Manny) Final decision on printers.
- (Pump Vendors, Enterprise Systems) Vendors will provide their own approach to bar coding for drugs, infusions, patients and caregivers.
- (All) Confirm structure diagrams and utilities - hard deadline for PCD before the Connectathon.
- Steve Moore needs MAC addresses
- Comments on Virtual Connectathon experience - replaced with "lessons learned" scheduled for 3/4
- Monroe experienced a time out problem with the MWB.
- Monitor PCD Connectathon registrations periodically.
- The Task Force will meet next Wednesday following the weekly meeting. A "reading" will be scheduled for Friday, Feb. 20 to prepare for the HIMSS Showcase rehearsal with equipment at the Connectathon.
- First Webex run through of draft Scenario
- Lessons learned leading up to and through the Connectathon
- - Pre-Connectathon process and tests, Virtual Connectathon process and tests, Connectathon process and tests
- Showcase Internet connections
- - IP addresses - DHCP
- Showcase wireless availability (802.11 b/g) - If HIMSS doesn't provide
- - Schedule a reading for docents and rehearsals
- Read, review the script