Difference between revisions of "PCD Connectathon&Showcase WG 2009-10"

From IHE Wiki
Jump to navigation Jump to search
m (→‎Related Pages and Documents: add another related link)
Line 37: Line 37:
  
  
'''1 First meeting [[PCD Connectathon&Showcase 2009-07-22 Webex]]''', potential agenda items:
+
'''1 First meeting date and time TBD [[PCD Connectathon&Showcase 2009-07-__ Webex]]''', potential agenda items:
 
:* Introductions
 
:* Introductions
 
:* Review of WG purpose - collaboration, cooperation, facilitation
 
:* Review of WG purpose - collaboration, cooperation, facilitation

Revision as of 22:27, 10 July 2009

This is the entry point for this Working Group in the 2009-10 Connectathon and HIMSS Showcase cycle.

Meeting Purpose

Collaborative effort to discuss implementation and demonstration issues and preparations

Related Pages and Documents

PCD Getting Started page with useful links http://wiki.ihe.net/index.php?title=PCD_Getting_Started

Orientation to IHE Connectathons and Showcases (demonstrations) http://www.ihe.net/north_america/flash/IHE_Educational_Webinar_Series_KickOff/IHE_Educational_Webinar_Series_KickOff.swf

Interpreting IHE Technical Frameworks http://www.ihe.net/north_america/flash/First-TimersSession_June18_2009/First-TimersSession_June18_2009.swf

Other Presentations in the IHE Webinar Series http://www.ihe.net/Events/webinars2009.cfm

PCD Pre-Connectathon Testing 2010

PCD Virtual Connectathon Testing 2010

PCD Showcase 2010 Scenario

HIMSS10 Website http://www.himssconference.org/

2010 North American Connectathon Overview - Important to View Periodically http://ihewiki.wustl.edu/wiki/index.php/North_America_2010

WebEx Information

Topic: PCD Connectathon and Showcase Working Group

Dates: Most __days, October through April

Time: _ pm, Eastern Time (New York )

Duration: 60 Minutes

July, 2009 Meetings

1 First meeting date and time TBD PCD Connectathon&Showcase 2009-07-__ Webex, potential agenda items:

  • Introductions
  • Review of WG purpose - collaboration, cooperation, facilitation
  • WG documentation - Wiki page(s) for minutes, action items, Scenario (e.g., one page or one page per meeting)
  • Summary of preparation process
  • Development of a calendar
  • IHE Webinars - instead of F2F
  • Developing a list of companies, contacts, profiles, actors - survey
  • Technical development
- Brief description of the MWB and its uses
- Pre-Connectathon, Virtual Connectathon, Connectathon testing
- NIST's support
- Availability of last year's samples and MWB efforts
- RTM compliance required
  • Intro to Showcase Process
- Design of structure
- Likelihood that PCD will have multiple tours
- Developing Scenario(s)
  • Last year's experience, lessons learned
- Orientation, mentoring of those new to the process
- Coordination between technical and marketing folk


The following are placeholders left here as examples from last year; please watch for an email indicating that the agenda has been established


16th regular meeting PCD Connectathon&Showcase 2009-02-18 Webex PCD Connectathon&Showcase 2009-02-18 Webex

Please add to the list

Action Items
Issues and questions about:
  • Monroe experienced a time out problem with the MWB.
  • Appropriate dosing units for drugs
  • HL7 coding
- EUI-64
  • Kudu, Connectathon, Showcase
  • Any discrepancies on tests
Connectathon Planning
  • Status report on tests for Connectathon
  • Schedule - set up begins Monday at 8, testing at 10 am
  • NIST validation of RTM
  • Dress code
Showcase Planning
  • Scenario update
  • System Assignments - identifying your partners,
- Tours - rethinking the concepts
  • Showcase Internet connections
  • Showcase Rehearsal at the Connectathon
  • Monitoring progress, issues through the rest of the process
- Risk Assessment
-Wiki page for Scripts:
Showcase Planning
  • Scenario update
  • System Assignments - identifying your partners,
- Tours - rethinking the concepts
  • Showcase Internet connections
  • Showcase Rehearsal at the Connectathon
  • Monitoring progress, issues through the rest of the process
- Risk Assessment
-Wiki page for Scripts
  • Dress code
  • Showcase Structure
- Drawings
- Logos
- Signs thanking supporters

August 2009 Meetings

September 2009 Meetings

October 2009 Meetings

November 2009 Meetings

December 2009 Meetings

January 2010 Meetings

2009-10 Calendar

This includes placholders; lines preceded with * provide current knowledge of dates This is intended as a work in progress, with milestones added or modified throughout the cycle. Dates to be assigned.

  • Connectathon Registration August 28 - September 30, 2009
  • Showcase Registration August 28 - September 30, 2009
  • Connectathon January 11-15, 2010 (plan to arrive no later than the 10th)
  • Showcase March 1-4, 2010 (watch for date for setup, likely the Saturday before)
Development of Test Concepts with the Profile WGs - ____
Development of the Pre-Connectathon Tests (MWB and NIST tools) to qualify systems for the Virtual and actual Connectathons
Development of Virtual Connectathon Procedures, Tests
Development of Connectathon Tests
Reporting successful completion of Pre-Connectathon Qualifying Tests (initial qualifying MESA test, PCD profile tests)
Conduct of Virtual Connectathon Testing and reporting results
Submission of networking requirements to Steve Moore - Nov. ___ with MAC addresses due to Steve by ___
Definition of Scenario for Showcase - Rough draft __
Final Scenario for Showcase
Design of Showcase Space
Definition of space, utility and other requirements for the Showcase

Action Items (Details in meeting notes)

Item Example from last year

from Jan. 21
  • Open Date: Monitor PCD Connectathon registrations periodically.
  • Jan. 28: (All) Consider a more effective way to communicate the IHE/PCD message, with fewer presentations.
  • Determine which systems provide comparable information within the storyline, even if they are unique in other ways.
  • Jan. 28: (Manny) Define data for preload, registration feed for visitors. Consider eliminating printers.
  • Jan. 28: (Manny) Address GE's concerns about staffing their Enterprise system.
  • Jan. 28: (Manny) Update on ADT/patient-visitor id and association with systems.
  • Update on ADT/patient-visitor id and association with systems. Focused meeting, include diagram and other information to be provided.
  • John Donnelly will address this as part of the Showcase focused portion of this meeding.
  • Check with Bill Klaver, John Donnelly, and Steve Moore. A04 will work this year
  • Verify that we will have an A04 message this year. Request preloaded data (medication order, demographics).
  • Provide material for the Scenario (outline or brief description) to be followed by Manny compiling a single view.
  • Identify overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
  • Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow
  • Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
  • Zebra has agreed to provide printers. We need to decide between two suggested models; determine if Epic can use the same Postscript printer Ruth provides; assure access to the registration kiosk.
  • Updates on how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
  • (Pump Vendors, Enterprise Systems) Vendors will provide their own approach to bar coding for drugs, infusions, patients and caregivers.
  • Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.
  • Identify the devices to be connected to middleware, the coding of parameters, identifying partners for testing and demonstration.
  • Coordinate ADT testing (Virtual and Connectathon) with Bill Klaver, coordinate with Steve Moore, John Donnelly, seek a backup system.
  • Update name for alarm product
  • Confirm structure diagrams and utilities
  • Define contents of fourth wall
  • Set PCD Docent training WebEx / on site (and run through at Connectathon)
  • Webex run through of draft Scenario
  • Update block diagram with locations of SIS, Cerner, Capsule
  • Steve Moore needs MAC addresses
  • Virtual Connectathon (tentative deadline for completion; partners may test anytime before this)
  • Determine if Cerner can support the AR actor in the Showcase.
  • Change proposal to PIB for ADT in PIB option.

Closed Action Items

Examples from 2009

  • Why are more companies not implementing SPD query within DOC? Which companies will implement and test this query this year?
  • Review items in http://wiki.ihe.net/index.php?title=IHE_PCD_2009_Showcase_Workshop_2008-10-28_to_30#Meeting_Purpose and determine which are transferred here.
  • Manny to contact Jim Higgins (Cerner) to coordinate Hill-Rom support. They provided a bed and a gurney in the past. Rita indicated that Cerner will coordinate Hill-Rom and Stryker beds and a gurney.
  • (Manny) Emails to Lisa with feedback on the Workshop
  • (Manny) Draft ACM tests ready for review - covered elsewhere
  • (Manny) HIMSS badge - MRN? - covered elsewhere
  • Ruth indicated that GE Enterprise includes the 5-rights data entry.
  • Special meeting was held to address ADT, other ID. Al had provided information about PAM, the need for A04 which is in ITI-31, not ITI-30, will be part of patient ID issue.
  • Colin FX (Epic) and Ruth (GE) offered approaches to support patient ID/registration requirements / issues from discussion.
  • (All) Patient IDs, ADT/PIB issues, device and caregiver ID are covered in other items on the list.
  • (Manny, pump vendors, any others) Wireless spectrum management. Didi is not supportive of addressing this throughout the convention hall, recommends approaching John Donnelly. Manny will contact John.
  • Emergin, LiveData) Connectathon on site testing with Polycom is scheduled for Thursday, Friday morning.
  • (Ruth) Does GE Enterprise include the 5-rights data entry?
  • Sarah Higgins identified contacts at Datamax and Zebra.
  • (Manny, pump vendors, any others) Wireless spectrum management. Didi is not supportive of addressing this throughout the convention hall, recommends approaching John Donnelly. Manny will contact John.
  • (Emergin, LiveData) Schedule Connectathon on site testing with Polycom
  • (Manny) Summarize focused meeting, include diagram.
  • (Bikram) Now unlikely to have bidirectional distributed demo - pushing data in from their booth to the demo.
  • (Pump Vendors, Enterprise Systems) Vendors will provide their own approach to bar coding for drugs, infusions, patients and caregivers.
  • Business card for Showcase w/ all companies listed + Booth numbers - the Showcase handout may address this.
  • Cerner added the AR actor.
  • (Manny) Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.
  • (Bikram, Rita/Jim Higgins) Identify the devices to be connected to middleware, the coding of parameters, identifying partners for testing and demonstration.
  • (Brett) Update name for alarm product
  • (Manny) Verify that we will have an A04 message this year. Request preloaded data (medication order, demographics).
  • Participants indicated they can test with two devices/patients' data (e.g., two pumps, two beds, two ARs or one AR with two patients)?
  • Structure:
- Utilities (electric, network)
- Physical requirements (size, mounts if larger, etc)
  • (All) The revised approach permits closing the following:
- Determine which systems provide comparable information within the storyline, even if they are unique in other ways.
- (All) Provide material for the Scenario (outline or brief description), consistent with the overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
- Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow
- Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
  • (Manny) Define data for preload, registration feed for visitors. Consider eliminating printers.
  • (Manny) Address GE's concerns about staffing their Enterprise system.
  • Virtual Connectathon:
- ADT: Bill Klaver for Virtual Connectathon; John Donnelly, and Steve Moore for Connectathon and Showcase. A04 will work this year
  • (Manny) Final decision on printers.
  • (Pump Vendors, Enterprise Systems) Vendors will provide their own approach to bar coding for drugs, infusions, patients and caregivers.
  • (All) Confirm structure diagrams and utilities - hard deadline for PCD before the Connectathon.
  • Steve Moore needs MAC addresses
  • Comments on Virtual Connectathon experience - replaced with "lessons learned" scheduled for 3/4
  • Monroe experienced a time out problem with the MWB.
  • Monitor PCD Connectathon registrations periodically.
  • The Task Force will meet next Wednesday following the weekly meeting. A "reading" will be scheduled for Friday, Feb. 20 to prepare for the HIMSS Showcase rehearsal with equipment at the Connectathon.
  • First Webex run through of draft Scenario
  • Lessons learned leading up to and through the Connectathon
- Pre-Connectathon process and tests, Virtual Connectathon process and tests, Connectathon process and tests
  • Showcase Internet connections
- IP addresses - DHCP
  • Showcase wireless availability (802.11 b/g) - If HIMSS doesn't provide
- Schedule a reading for docents and rehearsals
  • Read, review the script

Links

PCD Home