Difference between revisions of "PCC-6"

From IHE Wiki
Jump to navigation Jump to search
m (Replacing page with '''The functionality of this transaction was incorporated into {{ILink|PCC-6|PCC-1}} as a result of a Change Proposal. This transaction is now reserved.''')
m
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 +
===PCC-6===
 
''The functionality of this transaction was incorporated into {{ILink|PCC-6|PCC-1}} as a result of a Change Proposal.  This transaction is now reserved.''
 
''The functionality of this transaction was incorporated into {{ILink|PCC-6|PCC-1}} as a result of a Change Proposal.  This transaction is now reserved.''

Latest revision as of 10:58, 13 April 2009

PCC-6

The functionality of this transaction was incorporated into PCC-1 as a result of a Change Proposal. This transaction is now reserved.