Difference between revisions of "ITI CPs 2019-20-Agenda and Minutes from past CP calls"

From IHE Wiki
Jump to navigation Jump to search
Line 14: Line 14:
  
 
'''(1) Incoming CPs''' ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/
 
'''(1) Incoming CPs''' ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/
* CP-ITI-LAD-mCSD-LocationConstrainTableFixes.doc (Luke) - reviewed and accepted as CP-ITI-1183.  Completed and ready for future ballot 55.
+
* '''CP-ITI-LAD-mCSD-LocationConstrainTableFixes.doc''' (Luke) - reviewed and accepted as CP-ITI-1183.  Completed and ready for future ballot 55.
* CP-ITI-PDQm-birth-time.doc (John) - reviewed and assigned to John M as CP-ITI-1184.    Attendees thought that the CP should be discussed before balloting it --  at a future call when we have broader attendance.  Perhaps the issue of PDQm having only date (vs date-time in PDQ & PDQv3) --  and the affect (if any) on pediatric demographics or other use cases -- should at least be documented in a Closed or Open issues.  CP rationale is updated accordingly.
+
* '''CP-ITI-PDQm-birth-time.doc''' (John) - reviewed and assigned to John M as CP-ITI-1184.    Attendees thought that the CP should be discussed before balloting it --  at a future call when we have broader attendance.  Perhaps the issue of PDQm having only date (vs date-time in PDQ & PDQv3) --  and the affect (if any) on pediatric demographics or other use cases -- should at least be documented in a Closed or Open issues.  CP rationale is updated accordingly.
  
 
'''(2) Next in CPs'''
 
'''(2) Next in CPs'''

Revision as of 10:49, 11 July 2019

ITI domain CPs for 2019-20 are managed here: ITI Change Proposals 2019-20

This page contains the minutes from past CP review calls during the 2019-20 publication cycle.

Current ITI CP status spreadsheet is here

July 11 2019

Attendees: Dave Pyke (Ready Computing), Spencer LaGesse (Epic), Joe Lamy (Aegis/SSA), Lynn Felhofer

The ITI CP tracking spreadsheet is here.

(1) Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-LAD-mCSD-LocationConstrainTableFixes.doc (Luke) - reviewed and accepted as CP-ITI-1183. Completed and ready for future ballot 55.
  • CP-ITI-PDQm-birth-time.doc (John) - reviewed and assigned to John M as CP-ITI-1184. Attendees thought that the CP should be discussed before balloting it -- at a future call when we have broader attendance. Perhaps the issue of PDQm having only date (vs date-time in PDQ & PDQv3) -- and the affect (if any) on pediatric demographics or other use cases -- should at least be documented in a Closed or Open issues. CP rationale is updated accordingly.

(2) Next in CPs

  • Ballot 54 votes/comments are due July 17. See details here.
  • No CP call on July 18.
  • No CP call on July 25 due to the ITI Tech face-to-face meeting that week.

July 4 -- No CP call

June 27, 2019

Attendees: James Bourette (Intersystems), Spencer LaGesse (Epic), Joe Lamy (SSA/Aegis), Gregorio Canal (Arsenàl.IT), Ben Levy (Corepoint Health), Matt Blackmon (Sequoia), Tarik Idris (InterComponentWare), Luke Duncan, (IntraHealth), Lynn Felhofer

The ITI CP tracking spreadsheet is here.

(1) Assigned CPs for Review ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • CP-ITI-1178-01 - XDS: misalignment between example and description for localizedString (Gregorio) - The latest update to this CP was approved. This CP is Completed and ready for future ballot 55.

(2) Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-TI-hcIdentifier_capitalization_HPD.DOC (Tarik) - this HPD CP is assigned to Tarik as CP-ITI-1181. There are a few more capitalization fixes needed in the HPD tables in ITI-58, so Tarik will bring this back with additional updates.
  • CP-ITI-LF-MHD-mappingTableFixes (Lynn) - this MHD CP is assigned to John M as CP-ITI-1182.

(3) Next in CPs

  • The July 4 ITI CP call is cancelled due to U.S. holiday. ITI CP calls resume on July 11.
  • Ballot 54 is released. Votes/comments are due July 17. See details here.
  • ITI Tech's editors and reviewers have finished their work on CP integration, and the updated documents are being processed by Mary. We expect them to be published on ihe.net by mid-July.

June 20, 2019

Attendees: Oliver Egger (ahdis), James Bourette (Intersystems), Spencer LaGesse (Epic), Joe Lamy (SSA/Aegis), Gregorio Canal (Arsenal.IT), Walco van Loon (WalkIT), John Moehrke (ByLight), Ben Levy (Corepoint Health), Lynn Felhofer

The ITI CP tracking spreadsheet is here.

(1) Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • XDS: CP-ITI-GC-misalignment_between_example_and_description_for_localizedString.doc (Gregorio) - this CP was broadly discussed. Notes from that discussion were added to the rationale of the CP. This is now CP 1178, assigned to Gregorio. Rather than updating the examples alone, the committee identified other areas of Vol 3 to clarify with regard to use of localizedString, especially with regard to Registries not validating the content.
  • MHD: CP-ITI-GC-Clarify_use_of_outcome_in_ITI-65.doc (Gregorio) - this CP was discussed and modified. CP 1179 is Completed and ready for future ballot 55.
  • XDM: CP-ITI-XDM-email (John) - accepted as CP 1180. Completed and ready for a future ballot. This CP contains a reference to the new S/MIME option in ATNA, so balloting this CP depends on CP 1151 (with the new options) in Ballot 54 being declared Final Text.

(2) Next in CPs

  • Ballot 54 is released. Votes/comments are due July 17. See details here.
  • 3 ITI TI Supps are out for public comment. Comments due Mon Jul 24.
  • Next CP call is June 27; no CP call on July 4.

June 13, 2019

Attendees: Steve Nichols (GE), Joe Lamy (SSA/Aegis), Ben Levy, (Corepoint Health), John Moehrke (ByLight), Spencer LaGesse (Epic), Matt Blackmon (Sequoia), Lynn Felhofer

The ITI CP tracking spreadsheet is here.

(1) Assigned CPs for Review ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • CP-ITI-1151-01 - ATNA Authenticate-Node clarity – Update options in Vol 1 (John) - this CP was discussed and slightly update during the call version -02 is approved as Completed and ready for Ballot 54.
    • Refer to Final Text CP-ITI-1145 (Add three options affecting [ITI-19] Authenticate Node) to see current options for ATNA actors

(2) Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-DEN-mismatch-SecurityConsiderations.doc -- accepted as (editorial) CP 1175, assigned to Lynn
  • CP-ITI-KB-fixBrokenLinksInAppxO.doc -- accepted as (editorial) CP 1176; assigned to Matt Blackmon who will determine if anything can be done with reasonable effort (thanks, Matt)
    • also supplemental info in CP-ITI-KB-BrokenLinksVol2x.txt
  • CP-ITI-KB-fixOWaspLinkAppxV.doc -- accepted as (editorial) CP 1177; it is Completed but will be held for future Ballot 55 so that it could potentially be balloted with 1176 above

(3) Next in CPs

June 6, 2019

Attendees: Joe Lamy (Aegis/SSA), John Moehrke (By Light), Matt Blackmon (Sequoia), Spencer LaGesse (Epic), Oliver Egger (ahdis), Massimiliano Masi (Tiani-Spirit), Walco van Loon (WalkIT - guest), Paul Lomayesva (Intersystems), Lynn Felhofer

The ITI CP tracking spreadsheet is here.

(1) Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-PDQM-clarifyFamilySearch.doc (Oliver) - accepted as CP 1174. Approved as Completed and ready for future Ballot 54.
  • The following CPs were deferred to a future call:
    • CP-ITI-DEN-mismatch-SecurityConsiderations.doc
    • CP-ITI-KB-fixBrokenLinksInAppxO.doc
      • also supplemental info in CP-ITI-KB-BrokenLinksVol2x.txt
    • CP-ITI-KB-fixOWaspLinkAppxV.doc

(2) Assigned CPs for Review ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • CP-ITI-907 - IUA Maintenance and alignment with FHIR initiatives (Walco) - after some discussion, the group agreed that the best path forward is for Walco and Massi to draft a work item proposal for needed updates to IUA. Next steps:
    • John will send the work item proposal template to Walco.
    • Walco and Massi will prepare a work item proposal to present to the ITI Planning Cmte at their next scheduled call on 18-June. John advised that the work item proposal include information about the need for the update, as well as the planned scope of the update, so that the Planning Cmte can prioritize the work.
    • Lynn will send Walco the Word version of the current-published IUA and look for any other open IUA CPs
    • The soonest that the ITI Tech Committee can consider this work item (assuming it is approved) is at their F2F meeting at the end of July.
    • In the interim, Walco and Massi can work on the proposed updates to the Supplement.
    • With the continuous development model, it is possible that IUA could be updated (re-published) by the end of 2019, but the preliminary steps above need to be completed before timing could be confirmed
    • When/if the workitem is approved, this CP will be cancelled
  • CP-ITI-897 - Clarify that rqmts in ITI-19 provide a baseline set, and are not mandated at all deployments (John) - discussed and approved as Completed and ready for future Ballot 54
  • CP-ITI-1047 - Remove mandatory User Authentication from ITI-19 (John) - discussed and approved as Completed and ready for future Ballot 54
  • CP-ITI-1151 - ATNA Authenticate-Node clarity - Update options in Vol 1 (John) - John has proposed a revamping of ATNA actors' options that relate to TLS (ITI-19).
    • This CP is ready for committee review. We will devote the June 13 call to reviewing this CP, with the goal of approving it for ballot. Lynn will send out this CP to the ititech mailing list, along with CP 1145, the Final Text CP that added the FQDN server cert validation and BCP195 options.

(3) Next in CPs

  • If you plan to attend CP calls in the coming months, please indicate your availability using this google doc so we can make efficient use of our CP review time.
  • CP integration is currently on-going. Look for the Pub2019 tab on the CP tracking spreadsheet to see editor assignments and schedule for CP integration & republishing updated ITI TF docs.