Difference between revisions of "IHE Testing and Tools Committee Teleconference Minutes 2011-05-09"
Jump to navigation
Jump to search
Chrisdcarr (talk | contribs) |
Chrisdcarr (talk | contribs) |
||
(12 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
==Attendees== | ==Attendees== | ||
− | + | * Chris Carr | |
− | + | * Todd Cooper | |
+ | * Bruce Curran | ||
+ | * Didi Davis | ||
+ | * Nichole Drye-Mayo | ||
+ | * Joan McMillen | ||
+ | * Steve Moore | ||
+ | * Rob Snelick | ||
+ | * Karen Witting | ||
==Minutes== | ==Minutes== | ||
Line 7: | Line 14: | ||
* Connectathon Planning | * Connectathon Planning | ||
:* IHE Australia | :* IHE Australia | ||
− | :* IHE Korea | + | :* IHE Korea - July 11-15 event dates; Daegu |
− | :* IHE | + | ::* Registration is in progress, about 10 companies registered so far |
+ | ::* Scope to include XDS, Personal Health Monitoring Report, XDS-MS, ATNA; Clinical Use Cases: home glucose monitoring; referral | ||
+ | ::* Taking test plans from Gazelle; need to update based on Pisa feedback | ||
+ | ::* Todd working with organizers on details of test plans and sequence | ||
+ | :* IHE North America - Policies and Guidelines ready for publication along with announcement of timeline, etc. | ||
+ | :* IHE RO - | ||
+ | ::* Currently conducting pre-testing event in Stockholm | ||
+ | ::* Connectathon scheduled for Sept. 13-17 in Fairfax, VA | ||
+ | ::* Moving Connectathon to April-May time frame in 2013 | ||
+ | |||
+ | * Connectathon Manager Training | ||
+ | :* Continuing demand for manager training from national deployment committees (eg, Australia) | ||
+ | :* Add discussion by Technical Management Group about training activities to June agenda | ||
* Tools Development Planning | * Tools Development Planning | ||
− | :* Tool Inventory | + | :* [https://spreadsheets.google.com/ccc?key=0Aof7yn6v1b9gdG9lUUk1Zm4wX1FSbjlXZTZvb3F2X1E&hl=en&authkey=CMyqjrUO Tool Inventory] |
+ | ::* NIST working on tooling infrastructure to enable rapid development of specific testing tools | ||
+ | :::* Test case management tool to make it easier to write test cases and associate artifacts with specific tests | ||
+ | :::* Focusing on PCD domain tools; will offer to other domains | ||
+ | :::* Integration with Gazelle to grab test messages to validate in context of specific profile tests; reduce manual inspection of logs by test monitors | ||
+ | :::* Developing tools to support Meaningful Use Stage 2 (2013) requirements; tracking S&I framework activities to determine potential requirements | ||
+ | ::::* Lab, immunization, biosurveillance likely elements | ||
:* Communication | :* Communication | ||
:* Current Projects | :* Current Projects | ||
Line 19: | Line 44: | ||
:* NIST HQ Logistics | :* NIST HQ Logistics | ||
:* Meeting agenda: | :* Meeting agenda: | ||
− | ::* | + | ::* [https://spreadsheets.google.com/ccc?key=0Aof7yn6v1b9gdG9lUUk1Zm4wX1FSbjlXZTZvb3F2X1E&hl=en&authkey=CMyqjrUO Tool Inventory and development status] |
:::* Gazelle: Eric P/IHE-E | :::* Gazelle: Eric P/IHE-E | ||
:::* Test descriptions and test scripts: Steve Moore/IHE-NA | :::* Test descriptions and test scripts: Steve Moore/IHE-NA | ||
:::* Validation Tools: NIST | :::* Validation Tools: NIST | ||
+ | :::* Domain-by-domain, profile-by-profile tooling inventory | ||
+ | ::::* Identify status and gaps | ||
+ | ::::* Adapt tooling to updated infrastructure | ||
::* Development Planning | ::* Development Planning | ||
:::* Support of new domains and profiles | :::* Support of new domains and profiles |
Latest revision as of 11:32, 9 May 2011
Attendees
- Chris Carr
- Todd Cooper
- Bruce Curran
- Didi Davis
- Nichole Drye-Mayo
- Joan McMillen
- Steve Moore
- Rob Snelick
- Karen Witting
Minutes
- Connectathon Planning
- IHE Australia
- IHE Korea - July 11-15 event dates; Daegu
- Registration is in progress, about 10 companies registered so far
- Scope to include XDS, Personal Health Monitoring Report, XDS-MS, ATNA; Clinical Use Cases: home glucose monitoring; referral
- Taking test plans from Gazelle; need to update based on Pisa feedback
- Todd working with organizers on details of test plans and sequence
- IHE North America - Policies and Guidelines ready for publication along with announcement of timeline, etc.
- IHE RO -
- Currently conducting pre-testing event in Stockholm
- Connectathon scheduled for Sept. 13-17 in Fairfax, VA
- Moving Connectathon to April-May time frame in 2013
- Connectathon Manager Training
- Continuing demand for manager training from national deployment committees (eg, Australia)
- Add discussion by Technical Management Group about training activities to June agenda
- Tools Development Planning
-
- NIST working on tooling infrastructure to enable rapid development of specific testing tools
- Test case management tool to make it easier to write test cases and associate artifacts with specific tests
- Focusing on PCD domain tools; will offer to other domains
- Integration with Gazelle to grab test messages to validate in context of specific profile tests; reduce manual inspection of logs by test monitors
- Developing tools to support Meaningful Use Stage 2 (2013) requirements; tracking S&I framework activities to determine potential requirements
- Lab, immunization, biosurveillance likely elements
- Communication
- Current Projects
- Development Priorities
- June 7-8 Meeting Planning
- NIST HQ Logistics
- Meeting agenda:
-
- Gazelle: Eric P/IHE-E
- Test descriptions and test scripts: Steve Moore/IHE-NA
- Validation Tools: NIST
- Domain-by-domain, profile-by-profile tooling inventory
- Identify status and gaps
- Adapt tooling to updated infrastructure
- Development Planning
- Support of new domains and profiles
- New test management capabilities
- Integration of test management, test definitions, validation tools
- Support of non-Connectathon testing
- European project support
- US "meaningful use" testing and certification support
- Other projects and testing opportunities