Difference between revisions of "IHE Testing and Tools Committee Teleconference Minutes 2011-05-09"

From IHE Wiki
Jump to navigation Jump to search
 
(12 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
==Attendees==
 
==Attendees==
 
+
* Chris Carr
 
+
* Todd Cooper
 +
* Bruce Curran
 +
* Didi Davis
 +
* Nichole Drye-Mayo
 +
* Joan McMillen
 +
* Steve Moore
 +
* Rob Snelick
 +
* Karen Witting
  
 
==Minutes==
 
==Minutes==
Line 7: Line 14:
 
* Connectathon Planning
 
* Connectathon Planning
 
:* IHE Australia
 
:* IHE Australia
:* IHE Korea
+
:* IHE Korea - July 11-15 event dates; Daegu
:* IHE USA
+
::* Registration is in progress, about 10 companies registered so far
 +
::* Scope to include XDS, Personal Health Monitoring Report, XDS-MS, ATNA; Clinical Use Cases: home glucose monitoring; referral
 +
::* Taking test plans from Gazelle; need to update based on Pisa feedback
 +
::* Todd working with organizers on details of test plans and sequence
 +
:* IHE North America - Policies and Guidelines ready for publication along with announcement of timeline, etc.
 +
:* IHE RO -
 +
::* Currently conducting pre-testing event in Stockholm
 +
::* Connectathon scheduled for Sept. 13-17 in Fairfax, VA
 +
::* Moving Connectathon to April-May time frame in 2013
 +
 
 +
* Connectathon Manager Training
 +
:* Continuing demand for manager training from national deployment committees (eg, Australia)
 +
:* Add discussion by Technical Management Group about training activities to June agenda
  
 
* Tools Development Planning
 
* Tools Development Planning
:* Tool Inventory
+
:* [https://spreadsheets.google.com/ccc?key=0Aof7yn6v1b9gdG9lUUk1Zm4wX1FSbjlXZTZvb3F2X1E&hl=en&authkey=CMyqjrUO  Tool Inventory]
 +
::* NIST working on tooling infrastructure to enable rapid development of specific testing tools
 +
:::* Test case management tool to make it easier to write test cases and associate artifacts with specific tests
 +
:::* Focusing on PCD domain tools; will offer to other domains
 +
:::* Integration with Gazelle to grab test messages to validate in context of specific profile tests; reduce manual inspection of logs by test monitors
 +
:::* Developing tools to support Meaningful Use Stage 2 (2013) requirements; tracking S&I framework activities to determine potential requirements
 +
::::* Lab, immunization, biosurveillance likely elements
 
:* Communication
 
:* Communication
 
:* Current Projects
 
:* Current Projects
Line 19: Line 44:
 
:* NIST HQ Logistics
 
:* NIST HQ Logistics
 
:* Meeting agenda:
 
:* Meeting agenda:
::* Development status
+
::* [https://spreadsheets.google.com/ccc?key=0Aof7yn6v1b9gdG9lUUk1Zm4wX1FSbjlXZTZvb3F2X1E&hl=en&authkey=CMyqjrUO Tool Inventory and development status]
 
:::* Gazelle: Eric P/IHE-E
 
:::* Gazelle: Eric P/IHE-E
 
:::* Test descriptions and test scripts: Steve Moore/IHE-NA
 
:::* Test descriptions and test scripts: Steve Moore/IHE-NA
 
:::* Validation Tools: NIST
 
:::* Validation Tools: NIST
 +
:::* Domain-by-domain, profile-by-profile tooling inventory
 +
::::* Identify status and gaps
 +
::::* Adapt tooling to updated infrastructure
 
::* Development Planning
 
::* Development Planning
 
:::* Support of new domains and profiles
 
:::* Support of new domains and profiles

Latest revision as of 11:32, 9 May 2011

Attendees

  • Chris Carr
  • Todd Cooper
  • Bruce Curran
  • Didi Davis
  • Nichole Drye-Mayo
  • Joan McMillen
  • Steve Moore
  • Rob Snelick
  • Karen Witting

Minutes

  • Connectathon Planning
  • IHE Australia
  • IHE Korea - July 11-15 event dates; Daegu
  • Registration is in progress, about 10 companies registered so far
  • Scope to include XDS, Personal Health Monitoring Report, XDS-MS, ATNA; Clinical Use Cases: home glucose monitoring; referral
  • Taking test plans from Gazelle; need to update based on Pisa feedback
  • Todd working with organizers on details of test plans and sequence
  • IHE North America - Policies and Guidelines ready for publication along with announcement of timeline, etc.
  • IHE RO -
  • Currently conducting pre-testing event in Stockholm
  • Connectathon scheduled for Sept. 13-17 in Fairfax, VA
  • Moving Connectathon to April-May time frame in 2013
  • Connectathon Manager Training
  • Continuing demand for manager training from national deployment committees (eg, Australia)
  • Add discussion by Technical Management Group about training activities to June agenda
  • Tools Development Planning
  • NIST working on tooling infrastructure to enable rapid development of specific testing tools
  • Test case management tool to make it easier to write test cases and associate artifacts with specific tests
  • Focusing on PCD domain tools; will offer to other domains
  • Integration with Gazelle to grab test messages to validate in context of specific profile tests; reduce manual inspection of logs by test monitors
  • Developing tools to support Meaningful Use Stage 2 (2013) requirements; tracking S&I framework activities to determine potential requirements
  • Lab, immunization, biosurveillance likely elements
  • Communication
  • Current Projects
  • Development Priorities
  • June 7-8 Meeting Planning
  • NIST HQ Logistics
  • Meeting agenda:
  • Gazelle: Eric P/IHE-E
  • Test descriptions and test scripts: Steve Moore/IHE-NA
  • Validation Tools: NIST
  • Domain-by-domain, profile-by-profile tooling inventory
  • Identify status and gaps
  • Adapt tooling to updated infrastructure
  • Development Planning
  • Support of new domains and profiles
  • New test management capabilities
  • Integration of test management, test definitions, validation tools
  • Support of non-Connectathon testing
  • European project support
  • US "meaningful use" testing and certification support
  • Other projects and testing opportunities



Testing and Tools Committee