Difference between revisions of "IHE Testing and Tools Committee 2009-08-03 Teleconference Minutes"

From IHE Wiki
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 
==Attendees==
 
==Attendees==
 +
* Bruce Curran - ASTRO
 +
* Didi Davis - Serendipity Consulting
 
* Cor Loef - Philips
 
* Cor Loef - Philips
 
* Steve Moore - Mallinckrodt
 
* Steve Moore - Mallinckrodt
Line 8: Line 10:
 
==Minutes==
 
==Minutes==
  
1) Connectathon Guidelines<br>
+
1) Connectathon Guidelines
 
* Clarify requirements for training vs. committee participation and tools development
 
* Clarify requirements for training vs. committee participation and tools development
 
* Approve for distribution
 
* Approve for distribution
Line 14: Line 16:
 
2) Training Event
 
2) Training Event
 
* Announcement release
 
* Announcement release
 +
* Make enews announcement, Web page and pdf document (to target specific
  
 
3) Gazelle
 
3) Gazelle
 
* Update
 
* Update
 +
** Eric Poiseau's lab working on control layer
 +
** Actors available on the Internet for testing in October with Connectathon participants
 
* Tcon with NIST
 
* Tcon with NIST
** NEMA held discussion with NIST re ARRA support and tools development
+
** Charles Parisot reported on NEMA discussion with NIST re ARRA support and tools development
 
*** Working on release of RFP for tools development; no date specified
 
*** Working on release of RFP for tools development; no date specified
*** Will try to bring together several efforts, including Gazelle; goal is "partial compatibility" with Gazelle, allowing Gazelle applications to run on the NIST testing platform
+
*** Will try to bring together several efforts, including Gazelle; goal is "partial compatibility" with Gazelle, allowing Gazelle applications to run on the NIST testing platform via API, etc.
 +
*** NIST continues to work with several parties: NHIN contractors, CCHIT/Mitre, HITSP, etc.
 +
*** NHIN is contemplating testing of one or more reference implementations based on Connect gateway *** NHIN specification includes XCA and XCPD: Technical Leads are Tim Cromwell (Med VA), Omar Bouhaddou who work for David Riley at ONC; Gavin O'Brien is NIST contact
 +
*** CCHIT is working with NHIN contractors using validation framework developed by Bill Majurski at NIST
 +
*** Underlined need to coordinate development strategy and update NIST on Gazelle development
 +
** Chris Carr has requested that Lisa and Rob participate in an update teleconference
 +
*** Include strategic direction in discussion and recommend alignment of development on Gazelle platform
 +
*** Plan for demonstration of Gazelle by end of August
 +
* IHE USA - act as coordinating body for testing activities; perform outreach to parties engaged in testing and tools development
  
4) Registry
+
 
 +
4) Registry (deferred due to time)
 
* Update on development
 
* Update on development
 
* Switch Web page links
 
* Switch Web page links

Latest revision as of 11:10, 3 August 2009

Attendees

  • Bruce Curran - ASTRO
  • Didi Davis - Serendipity Consulting
  • Cor Loef - Philips
  • Steve Moore - Mallinckrodt
  • Charles Parisot - GE
  • Lisa Spellman - HIMSS
  • Chris Carr - RSNA

Minutes

1) Connectathon Guidelines

  • Clarify requirements for training vs. committee participation and tools development
  • Approve for distribution

2) Training Event

  • Announcement release
  • Make enews announcement, Web page and pdf document (to target specific

3) Gazelle

  • Update
    • Eric Poiseau's lab working on control layer
    • Actors available on the Internet for testing in October with Connectathon participants
  • Tcon with NIST
    • Charles Parisot reported on NEMA discussion with NIST re ARRA support and tools development
      • Working on release of RFP for tools development; no date specified
      • Will try to bring together several efforts, including Gazelle; goal is "partial compatibility" with Gazelle, allowing Gazelle applications to run on the NIST testing platform via API, etc.
      • NIST continues to work with several parties: NHIN contractors, CCHIT/Mitre, HITSP, etc.
      • NHIN is contemplating testing of one or more reference implementations based on Connect gateway *** NHIN specification includes XCA and XCPD: Technical Leads are Tim Cromwell (Med VA), Omar Bouhaddou who work for David Riley at ONC; Gavin O'Brien is NIST contact
      • CCHIT is working with NHIN contractors using validation framework developed by Bill Majurski at NIST
      • Underlined need to coordinate development strategy and update NIST on Gazelle development
    • Chris Carr has requested that Lisa and Rob participate in an update teleconference
      • Include strategic direction in discussion and recommend alignment of development on Gazelle platform
      • Plan for demonstration of Gazelle by end of August
  • IHE USA - act as coordinating body for testing activities; perform outreach to parties engaged in testing and tools development


4) Registry (deferred due to time)

  • Update on development
  • Switch Web page links

Testing and Tools Committee