Difference between revisions of "IHE Testing and Tools Committee 2009-08-03 Teleconference Minutes"
Jump to navigation
Jump to search
Chrisdcarr (talk | contribs) |
Chrisdcarr (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
==Attendees== | ==Attendees== | ||
+ | * Bruce Curran - ASTRO | ||
+ | * Didi Davis - Serendipity Consulting | ||
* Cor Loef - Philips | * Cor Loef - Philips | ||
* Steve Moore - Mallinckrodt | * Steve Moore - Mallinckrodt | ||
Line 8: | Line 10: | ||
==Minutes== | ==Minutes== | ||
− | 1) Connectathon Guidelines | + | 1) Connectathon Guidelines |
* Clarify requirements for training vs. committee participation and tools development | * Clarify requirements for training vs. committee participation and tools development | ||
* Approve for distribution | * Approve for distribution | ||
Line 14: | Line 16: | ||
2) Training Event | 2) Training Event | ||
* Announcement release | * Announcement release | ||
+ | * Make enews announcement, Web page and pdf document (to target specific | ||
3) Gazelle | 3) Gazelle | ||
* Update | * Update | ||
+ | ** Eric Poiseau's lab working on control layer | ||
+ | ** Actors available on the Internet for testing in October with Connectathon participants | ||
* Tcon with NIST | * Tcon with NIST | ||
− | ** NEMA | + | ** Charles Parisot reported on NEMA discussion with NIST re ARRA support and tools development |
*** Working on release of RFP for tools development; no date specified | *** Working on release of RFP for tools development; no date specified | ||
− | *** Will try to bring together several efforts, including Gazelle; goal is "partial compatibility" with Gazelle, allowing Gazelle applications to run on the NIST testing platform | + | *** Will try to bring together several efforts, including Gazelle; goal is "partial compatibility" with Gazelle, allowing Gazelle applications to run on the NIST testing platform via API, etc. |
+ | *** NIST continues to work with several parties: NHIN contractors, CCHIT/Mitre, HITSP, etc. | ||
+ | *** NHIN is contemplating testing of one or more reference implementations based on Connect gateway *** NHIN specification includes XCA and XCPD: Technical Leads are Tim Cromwell (Med VA), Omar Bouhaddou who work for David Riley at ONC; Gavin O'Brien is NIST contact | ||
+ | *** CCHIT is working with NHIN contractors using validation framework developed by Bill Majurski at NIST | ||
+ | *** Underlined need to coordinate development strategy and update NIST on Gazelle development | ||
+ | ** Chris Carr has requested that Lisa and Rob participate in an update teleconference | ||
+ | *** Include strategic direction in discussion and recommend alignment of development on Gazelle platform | ||
+ | *** Plan for demonstration of Gazelle by end of August | ||
+ | * IHE USA - act as coordinating body for testing activities; perform outreach to parties engaged in testing and tools development | ||
− | 4) Registry | + | |
+ | 4) Registry (deferred due to time) | ||
* Update on development | * Update on development | ||
* Switch Web page links | * Switch Web page links |
Latest revision as of 11:10, 3 August 2009
Attendees
- Bruce Curran - ASTRO
- Didi Davis - Serendipity Consulting
- Cor Loef - Philips
- Steve Moore - Mallinckrodt
- Charles Parisot - GE
- Lisa Spellman - HIMSS
- Chris Carr - RSNA
Minutes
1) Connectathon Guidelines
- Clarify requirements for training vs. committee participation and tools development
- Approve for distribution
2) Training Event
- Announcement release
- Make enews announcement, Web page and pdf document (to target specific
3) Gazelle
- Update
- Eric Poiseau's lab working on control layer
- Actors available on the Internet for testing in October with Connectathon participants
- Tcon with NIST
- Charles Parisot reported on NEMA discussion with NIST re ARRA support and tools development
- Working on release of RFP for tools development; no date specified
- Will try to bring together several efforts, including Gazelle; goal is "partial compatibility" with Gazelle, allowing Gazelle applications to run on the NIST testing platform via API, etc.
- NIST continues to work with several parties: NHIN contractors, CCHIT/Mitre, HITSP, etc.
- NHIN is contemplating testing of one or more reference implementations based on Connect gateway *** NHIN specification includes XCA and XCPD: Technical Leads are Tim Cromwell (Med VA), Omar Bouhaddou who work for David Riley at ONC; Gavin O'Brien is NIST contact
- CCHIT is working with NHIN contractors using validation framework developed by Bill Majurski at NIST
- Underlined need to coordinate development strategy and update NIST on Gazelle development
- Chris Carr has requested that Lisa and Rob participate in an update teleconference
- Include strategic direction in discussion and recommend alignment of development on Gazelle platform
- Plan for demonstration of Gazelle by end of August
- Charles Parisot reported on NEMA discussion with NIST re ARRA support and tools development
- IHE USA - act as coordinating body for testing activities; perform outreach to parties engaged in testing and tools development
4) Registry (deferred due to time)
- Update on development
- Switch Web page links