PCD Technical Committee Closed Action Items
Items 60 - 69
Number Action Owner Participants Due Date Status Comments
62 Incorporate Bar Coding into ADT implementations; which domain is responsible? Todd Co-chairs 2009.07.01 Closed Please see summary of June 3 for history http://wiki.ihe.net/index.php?title=PCD_TC_2009-06-03_Webex#Discussion. John Rhoads reviewed the topic as discussed at the DCC. Ken and Todd took this to the DCC approximately 6 months ago. The DCC suggested PCD take the lead and coordinate the various IHE Domain. John indicated this was the same approach the DCC took again recently. Todd noted that Khalid is developing an approach for DPI and asked that John take this back to the DCC and he agreed to do so. Paul asked if bar codes (which are available in different standards) are the only identifier of interest. Others could include the patient’s photo. Todd suggested the PC draft a brief profile proposal that could be used to recruit ITI, Radiology and possibly PCC to join the effort. John asked Khalid if he would lead this effort and Khalid agreed to give this some thought. Paul noted that PCD-01 permits multiple patient identifiers. Change date to July 1. October 28, 2009: Bar coding can be folded into patient ID (#84). Close.
67 Integration Profile Registration (w/ OID Defs) John Garguilo Al Engelbert, John Rhoads, Todd Cooper, Robert Flanders. 2010.09.29 Close Previous history is available on this Wiki (see history tab). Note that once the final TF Vols are produce in early 2010, verify that the OIDs registered with IHE are still correct. April 6, 2010: Close. PCD has OIDs now. Al Engelbert asked if the OID will change as a profile changes. John Garguilo responded that another element, .x, will be added and reflect the version. OIDs are tracked on a Wiki page. Once the PCD Technical Framework (Vols I and II) comment period ends (early September 2010) and the final versions are available (Trial Implementation Version), OIDs for the IHE-PCD Integration Profile transactions can be registered with Steve Moore at IHE. Todd set up Google Group and Wiki Page to establish a baseline. See [[1]]
Items 70 - 79
Number Action Owner Participants Due Date Status Comments 77 Preparing a Proposal to HL7 for Pharmacy WG (new name) Gary Meyer Jeff Rinda, Al Engelbert 2010.03.31 Close Jeff noted this is not a critical issue, but the pharmacy group needs to address the issue. Gary is monitoring the Pharmacy WG. They are focused on community practice. Gary suggested that about a third of this work will be useful for institutional practice. Ruth noted that HITSP is working on the ordering process. NCPCP is working on an HL7 2.5 messaging process. This work is US focused and may become an issue internationally. They may not be interested in addressing this in this cycle (Atlanta the week of Sept. 21). Dec. 9, 2009: Change date to Feb. 20. June 30, 2010: Close as completed. 79 Change Proposal Tutorial 2009.07.01 CLOSE Provide a tutorial on filing Change Proposals. These have been suggested and need CPs: ACM: clarify coding of multiple aspects of an alarm; Infusion Pump: clarify coding. John Rhoads / Todd Cooper to contact those developing CPs to ensure the process is understood and properly managed.
Items 80 - 89
Number Action Owner Participants Due Date Status Comments
83 MOUs Sandy Ken 2010.05.03 Closed Follow up MOU status with CIMIT, ASTM. Ken reported that Julian presented this to the ASTM. John Garguilo reported they had a meeting with the FDA and updated them on NIST tools and their work with PCD. June 30, 2010: Move to PC. 84 Patient Identity and PCD Messages Todd, Khalid, Gary 2009.07.01 Close How best to accomplish this tie will be addressed in the white paper for further development as a supplement to PIB (Todd). Coordination with IEEE (-20103 CCOM) and ICE-PAC will be accomplished Jan. Draft a patient association brief profile proposal (Khalid). The A04 registration message is not the commonly used message, while A01 is used by hospitals at admission (Gary). Gary will review this issue and it will be factored into the CPs for publication and testing in the 2010 Connectathon. Also see 62. Note related discussions in the Infusion Pump WG.Dec. 9, 2009" Close; folded into detailed profile proposal. 86 Test Tools John Garguilo, Rob Snellick Manny 2009.07.15 Close NIST will explore a registry for MWB files (Rob). Manny to request PCD Connectathon WG to post MWB files. Change date to June 17, add John Garguilo to the effort. NIST is open to providing incremental releases of "test artifacts" (which include MWB profiles). Need to determine when such information is desired to be available for viewing/browsing. This information would be part of the Testing Infrastructure as part of a public repository. Can we establish a date to make this available by? Members were asked to send Garguilo any MWB files that should be considered when developing registered profiles. Dec. 9, 2009: Close; NIST will add stable profiles to their registry. Combine with #66. 87 IDCO Nick 2009.07.01 CLOSED For history see history tab and previous meetings. Nick Steblay reviewed the public comments received on IDCO. Use case clarification/modification will be addressed in response to Manny’s comment suggesting that a flag be set to indicate clinician review (validation). With regard to identification of the pacemaker, there is a unique identifier for the device that includes vendor, model and in some instances the serial number. Paul noted that the interrogator should be identified for traceability, and use EUI-64. Nick responded that device vendors do not send this now, and this would be an issue. It was agreed that this will be resolved in the future. John Garguilo indicated the WG is currently addressing RTM issues. IDCO leadership will be invited to report at the next TC meeting.
88 Cycle 4 Supplement Status Ken, Todd 2009.07.01 Close John Rhoads, Monroe, Paul offered to review the WCM document. Cycle 4 Supplement Status - Anticipated release dates are: IDCO - June 1; PIV - June 1; RTM - June 1; WCM - September 1. White Papers: DPI and MEM will be available this summer. PIV: Recent WG F2F: Todd briefly summarized the meeting. Those interested are referred to the Wiki page (see agenda list above). He noted it was a very productive meeting. RTM update: Paul found 40 errors and as a result is looking at automating the process for identifying them. He noted the harmonized table is looking good. Work continues on RTM ventilator terms. The RTM update should be available for TC ballot in about 10 days. CPs: A number of change proposals are in development. He suggested that the PIV WG review these as soon as possible. Dec. 2, 2009: Close.
89 Verify process for “public comment” period Todd, John Rhoads 2010.03.31 Close For history see history tab. Address common procedure for all domains where the domain keeps the submitting organization informed of progress. Verify process for “public comment” period, esp. for CPs; verify it is properly and appropriately applied to the RTM updates; publish to TC (esp. CP editors Jeff Rinda & Rugh Berge). John Rhoads has reviewed the ITI procedure and provided a modified version for the PCD. Substantial discussion followed and John will update the diagram. Paul asked if there is an appeal process to resolve conflicts. Todd will research the appeal process. 2010.03.17: Ioana has submitted a revision of the process for consideration. June 30, 2010: Close as completed.
Items 90 - 99
Number Action Owner Participants Due Date Status Comments 90 Brief Profile Proposals As Noted See WGs 2009.10.05 Close - Summary as of Sept. 9:
- - RTLS - Ken will write up Brief Profile Proposal
- - MEM - Steve will write up Brief Profile Proposal
- - ACM to Enterprise - Monroe will write up Brief Profile Proposal for Extending ACM to Enterprise
- - Point of Care ID Management - Khalid, Todd will write up Brief Profile Proposal
- - Multi-Parameter Clinical Decision Support Data Integration, Communication and Analysis (MPCDSICA)
- - Location Tracking
- - Middleware Metrics (Brief Proposal)
- - QBD - Query for Bulk Data
- Brief Profile Proposals due the 25th, for PCD, ITI. Next week’s PCD PC meeting will include a review of the proposals received.
- Initial discussion will be held in advance of F2F. Dec. 9, 2009: Close.
91 Making the LOA optional 2009 Dec. 2 Close From F2F: Making the LOA optional without any detail is problematic. The group asked about: what is the rationale for Item 2 and why is section E optional? Patent Disclosure Wiki Page = IHE should modify page to provide link to the disclosure and to segment the page by profile and actor. Take to DCC. Dec. 9, 2009: Close; activity is at Board level. 92 Grouped Actors Manny 2010.05.03 Close F2F: Did Kudu registration permit signing up for DOR as a grouped actor? Dec. 9, 2009: Pending discussion at DCC. June 30, 2010: Close as addressed by removing this as potentially available to PIB. PIB will become a suggestion or reference to PAM, PDQ that are separate and distinct ITI profiles. 94 TF Gaps to Fill Ruth 2009 Nov. 18 Close Ruth will check status of ITI HL7 ACK text for PCD-03. Feb. 24, 2010: Manny to ask Ruth for update.June 30, 2010: Close. 95 ADT Binding for Pumps Ruth, Gary 2009.Nov. 18 Close F2F: See Thursday, Discussion Item 6; added Oct. 14. Close; will be in detailed profile proposal. 96 Add ITI-31 (PAM PCD) to the TF Robert, John Rhoads 2010.03.31 Close November 18: Robert raised the need for ITI-31 for PCD; this will be added to the TF. Robert working on CP. June 30, 2010: Close in favor of Patient Device Association addressing this issue. Open new item to obtain all ADT support required. PAM, PDQ, PEC. Open new item for PDA with possible interim document.
97 QoS and a QoD (quality of data) issues need to be addressed within the alarm/alert communications
Monroe, Ken
2010.08.30 Closed Initiated F2F May 3, 2010 afternoon, item 2: (a) build the ability to identify these issues and (b) implement a response. An alert and/or log should be sent/noted when it is needed. May 26, 2010: Monroe has begun work. Initial proposal on how to proceed June 30. June 30, 2010: Change date. April 6, 2010: Close with reference to 60601-8 and its reference to end-to-end delay.
98 Open source solution to archiving persistent data
Ken, Vaughan Zakian 2010.06.30 Closed Initiated F2F May 3, 2010: Ken and Vaughan will address an open source solution to archiving persistent data. May 26, 2010: Ken will contact Vaughan and report back the end of June. April 6, 2010: Close.
99 Review 2010, Develop 2011 Test Cases
Manny John Garguilo 2010.09.25 Closed Initiated F2F May 3, 2010: Manny will schedule review of existing test cases and then extensions and new test cases [Complete]. Manny will add device identification and chain of data to the list of potential changes to testing [Comlete]. May 26, 2010: Summer, with a plan in a couple of weeks. June 30, 2010: Reviews have begun, changed due date to end of Aug. Tuesday sessions held [and completed] for DEC, PIV, ACM, and IDCO test case review. Test cases are being revised and reviewed a second time during first 3 weeks of Sept. 2010 April 6, 2011: noted this was closed Oct. 4, 2010.
Items 100 - 109
Number Action Owner Participants Due Date Status Comments 100 CPs: PCD-01, PCD-02, ACM, ACK, ITI-31, RTM, other
2010.06.02 Close Initiated F2F May: CPs will be submitted, after revisions if necessary. All were supported by those present. Pump WG will address at least two. Monroe will revise ACM TI. Manny to ask John Donnelly to seek vendors to test, implement at Showcase. May 26, 2010: Manny to get CPs out when available. Recruit needed vendors - move to PC. June 30, 2010: Close. Vendor recruiting to be a PC responsibility.
103 DPI/ICE-PAC Project
2010.05.26 Close Initiated F2F May 7, 2010: Define the next steps and enroll vendors to develop this in time for the Connectathon and Showcase. This would include: a technical report, and possibly technical documents such draft supplements for DPI or other. This would be a demonstration testing for a New Directions wall. Philips and Draeger expressed interest. Draft a project plan targeting (a) specification development over the summer, (b) prototyping in the fall / early winter, (c) demonstration testing event, (d) public demonstration during HIMSS '11 (end of February in Orlando). Jon B. offered to recruit vendors & organize. May 26, 2010: Add Todd. Todd developed a Google Group. Rapid Device Configuration (RDC) is the project name. The intent of the item has been met. Close.
104 CDA (HL 7 v.3)
2010.05.26 Close Initiated F2F May 7, 2010: They will set up meetings and Wiki pages. John Rhoads will poll participants to set a meeting time. May 26: 19.Todd reported that this was discussed in detail in Rio. John will take this forward. The GAS WG (anesthesia) is also working in this area, with effort on a CDA report. Close.
107 NIST Extensions John Garguilo Sandra Martinez December 8, 2010 CLOSED Wednesday, Oct. 20: NIST Test Agent extension work for all Integration Profiles will be discussed with each WG. Nov 2010, Sandra resolved issues via email with Integration Profile WGs.
Go to PCD Technical Committee Action Items page.
Go to Patient Care Device home.