Tcon April 2, 2007
Agenda & Minutes
- Incoming CP review (ATNA only), see incoming directory
- CP-ITI-ATNA-MOORE-TLS-Break-Glass.doc Reject this CP as inappropriate.
- CP-ITI-232-00.doc (originally named CP-ITI-ATNA-MOORE-Self-Signed-Certificate.doc) Assign to John, # 232
- CP-ITI-233-00.doc (originally named CP-ITI-ATNA-MOORE-Key-Length.doc) Systems must be able to be configurable to key lengths between 1024-4096. Assign to John, #233
- CP-ITI-ATNA-MOORE-Certificate-Request-Process.doc Reject, but process should be a part of the testing environment.
- CP-ITI-234-00.doc (originally named CP-ITI-ATNA-MOORE-Certificate-Per-System-Not-CA.doc) Assign to John, #234
- CP-ITI-235-00.doc (originally named CP-ITI-ATNA-MOORE-Certificate-Contents.doc) Assign to Rob, #235. Should require that a system be able to configure off the checking of hostname.
- CP-ITI-236-00.doc (originally named CP_ATNA_070216.doc] Assign to John, #236
- Assigned CPs ready for review: (as time allows, in following order)
- 209 - Move CP to complete. All the items in the referenced Appendix have been addressed by the standards body. So the list should be removed from the TF. This CP updates the appendix to be empty.
- 164 - Reviewed discussion items in text. Agreed that this should be an XDS specific section in a new Appendix. The PDQ and PIX work will be another section in the same appendix.
- CP-ITI-228-01.doc - Brief review. Needs review by originator (Sarah).
- 156 - Warren: deferred
- 212 - Charles: deferred
- CP Planning: Plan future CP work
- xds_118_00.doc- Requires clarification by original initiator. Steve/Karen to followup with possible initiator. Re-assigned to Karen. New version at CP-ITI-118-01.doc
- xds_147_00.doc - Two possible approaches to this a) require registries to do unicode normalization b) require patient ids to be in the ASCII character set. Second option seems preferable. Rob will write that option up and it will be distributed to national areas that would have a concern (Korea, others?)
- dsg_160_00.doc - This requires more thought and there seems to be no urgency. Still not enough vendors implementing DSG to require connectathon testing of it.
- atna_180_00.doc - team login question requires further discussion with larger group.
Tcon March 23, 2007
See Minutes .