PCD Connectathon&Showcase 2012-11-13 Webex: Difference between revisions

From IHE Wiki
Jump to navigation Jump to search
Efurst (talk | contribs)
m Participants: enter participants
Efurst (talk | contribs)
m Discussion: begin notes
Line 30: Line 30:
| '''Introductions & Agenda Review''' <br>- Manny
| '''Introductions & Agenda Review''' <br>- Manny
| '''Status/Discussion:'''
| '''Status/Discussion:'''
: No changes were made to the agenda. '''Placeholder'''
: No changes were made to the agenda.  
    
    
: Discussion Summary from last meetings were deferred.
: Discussion Summary from last meetings were deferred.
Line 42: Line 42:
| '''2012 N A Connectathon''' <br>- Manny
| '''2012 N A Connectathon''' <br>- Manny
| '''Status/Discussion:'''  
| '''Status/Discussion:'''  
* Lynn's presentation Oct. 30: Links to the recording & slides for this morning "Pre-Connectathon Test Overview" are now posted on the Connectathon Manager's Support website:  http://na2013.wustl.edu/. 
* No significant issues.


'''Decisions/Issues:'''
'''Decisions/Issues:'''
Line 52: Line 52:
| '''2012 Showcase''' <br>- Manny
| '''2012 Showcase''' <br>- Manny
| '''Status/Discussion:'''   
| '''Status/Discussion:'''   
Monitor sizes: Al recommended 32" rather than 27". Manny will sketch the walls reflecting the current device/system assignments to help determine if 32" will fit.
Assignments: Only a few comments were received in response to the initial assignments.
:- One was the need for a syringe pump in UC 1. CareFusion has the only PCD conforming syringe pump, but they want to bring the LVP. They are willing to bring the syringe pump for UC 1. The LVP is located in another UC.
:- Philips expressed concern about the use of the Philips IP5 monitor in non-MRI settings where it is not an intended use. Manny will discuss this with Philips.
:- The GE monitor in the UC with the GE EMR led to exchange of a Philips monitor with the GE monitor.





Revision as of 11:41, 27 November 2012

PCD Connectathon & Showcase Meeting 2012-2013 Cycle

Action Items

You can find the Action Items at PCD-Connectathon&Showcase-ActionItemsCycle7-2012-2013


Agenda

You can find the agenda at http://wiki.ihe.net/index.php?title=PCD_Connectathon%26Showcase_WG_2012-13

This meeting was recorded, recording is at https://himss.webex.com/himss/lsr.php?AT=pb&SP=MC&rID=63289192&rKey=f925222f7cd19c36 --- PCD Connectathon and Showcase WG-20121113 1909-1 Tuesday, November 13, 2012 2:09 pm New York Time 28 Minutes

Participants

Participants: Kathleen Boland (iSirona), Bikram Day, Patrick Dragani, Al Engelbert, Bob Gold, Laxman Halleppanavar (GE), John Hoyt, Brad Lunde, Jeff McGeath, Darryl Mellott, Monroe Pattillo, Bryan Tamke, Katrina Voigt, Manny Furst

Discussion

Item3 Topic Discussion
1 Introductions & Agenda Review
- Manny
Status/Discussion:
No changes were made to the agenda.
Discussion Summary from last meetings were deferred.

Decisions/Issues:

Action(s):

2 2012 N A Connectathon
- Manny
Status/Discussion:
  • No significant issues.

Decisions/Issues:

Action(s):

3 2012 Showcase
- Manny
Status/Discussion:

Monitor sizes: Al recommended 32" rather than 27". Manny will sketch the walls reflecting the current device/system assignments to help determine if 32" will fit.

Assignments: Only a few comments were received in response to the initial assignments.

- One was the need for a syringe pump in UC 1. CareFusion has the only PCD conforming syringe pump, but they want to bring the LVP. They are willing to bring the syringe pump for UC 1. The LVP is located in another UC.
- Philips expressed concern about the use of the Philips IP5 monitor in non-MRI settings where it is not an intended use. Manny will discuss this with Philips.
- The GE monitor in the UC with the GE EMR led to exchange of a Philips monitor with the GE monitor.


Decisions/Issues:

Action(s):

4 Next Meetings
- Manny
Status/Discussion:
- Next week’s meeting will ________________.

Decisions/Issues:

Action(s):

Return to main WG page which has links to individual meeting pages

Return to main PCD Connectathon/Showcase WG page: PCD_Connectathon&Showcase_WG_2012-13

PCD Home