Connectathon Using Gazelle Test Tools: Difference between revisions

From IHE Wiki
Jump to navigation Jump to search
Created page with "The Gazelle Test Tools cover a number of different areas. The Kereval team describes the tools and uses on [https://gazelle.ihe.net/content/gazelle-user-guides this page]."
 
No edit summary
Line 1: Line 1:
The Gazelle Test Tools cover a number of different areas. The Kereval team describes the tools and uses on [https://gazelle.ihe.net/content/gazelle-user-guides this page].
The Gazelle Test Tools cover a number of different areas. The Kereval team describes the tools and uses on [https://gazelle.ihe.net/content/gazelle-user-guides this page].
This page summarizes the tools one would actually use during a Connectathon. The page referenced above describes the full suite of tools, and some of those tools are not used directly at a testing event.
{| style="width:100%" border="1" cellpadding="3"
! Tool
! Comment
|-
| Gazelle Test Management
|
* Sometimes just referred to as 'Gazelle'
* TM is the application used to manage the connectathon process, from registration through pre-Connectathon & Connectathon testing, until the generation of the test report
* More description on this wiki: [[Connectathon Using Gazelle Test Management Only]]
|-
| Gazelle Proxy
|
* "Man in the middle": captures the messages exchanged between two systems and forwards them to the validation service front-end
* More description on this wiki: [[Connectathon Using the Gazelle Proxy]]
|}

Revision as of 15:16, 14 February 2020

The Gazelle Test Tools cover a number of different areas. The Kereval team describes the tools and uses on this page.

This page summarizes the tools one would actually use during a Connectathon. The page referenced above describes the full suite of tools, and some of those tools are not used directly at a testing event.

Tool Comment
Gazelle Test Management
  • Sometimes just referred to as 'Gazelle'
  • TM is the application used to manage the connectathon process, from registration through pre-Connectathon & Connectathon testing, until the generation of the test report
  • More description on this wiki: Connectathon Using Gazelle Test Management Only
Gazelle Proxy
  • "Man in the middle": captures the messages exchanged between two systems and forwards them to the validation service front-end
  • More description on this wiki: Connectathon Using the Gazelle Proxy