Rad Tech Agenda 07.11.5-7: Difference between revisions
Moved Agenda items from the Cmte page into the Meeting Agenda Page |
No edit summary |
||
| Line 7: | Line 7: | ||
==Scheduled Workflow II (SWF II)== | |||
* [[Scheduled_Workflow_II_-_Detailed_Proposal| Detailed Scheduled Workflow II Proposal ]] | * [[Scheduled_Workflow_II_-_Detailed_Proposal| Detailed Scheduled Workflow II Proposal ]] | ||
Revision as of 14:35, 31 October 2007
Radiation Dose Management Profile
Scheduled Workflow II (SWF II)
PDI for Large Data Sets
Connectathon Discussion
One of the current challenges with the PDI Profile is it is limited to CDs, which are often not sufficient for the Imaging Data Sets which need to be placed on a Media. There is a desire to look at both alternative media (e.g. DVD) and the ability to compress Imaging Data. To date, this has not been done because of the high interoperability requirements.
The original PDI profile
The original PDI profile looked at DVD and determined that the interoperability of DVD drives and media was not good enough to consider. As technology has advanced, there is a need to revisit this position. Towards that end, there is a proposal on the table to run a PDI Connectathon for DVD media to determine whether it is time to create a PDI for Large Data Sets using DVD media.
The following is information we hope that each Vendor can bring to the face-to-face:
- What is your Company's position of running a DVD Test
- How might your company participate in such a DVD test.
The following is what we hope to cover at the face-to-face:
- Determine user/vendor interest in DVD tests in the Connectathon (Go or No Go)
- Decide about performing the informal tests (Jan. Connectathon). David Clunie has started the development of the DVD Connectathon Testing. Your input and comments to the [PDI_DVD_Preliminary-Evaluation| PDI DVD Preliminary EvaluationDocument] is welcome.
- Determine how to use and publish the DVD Connectathon Testing Results. Lynn Felhofer, one of the IHE North American Connectathon Project Managers will be running the testing.
- Determine if there are any additional next steps. Does a research project on interoperability and compression need to be started at this point?
- Determine how to continue communications up with OFFIS/DRG. Are there additional PDI CPs which can be written this year, or does everything have to wait for the next steps.