Difference between revisions of "ITI Change Proposals 2007"
m (→Completed CPs) |
|||
Line 71: | Line 71: | ||
| Date/Time Format | | Date/Time Format | ||
| XDS | | XDS | ||
+ | |- | ||
+ | | [ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2006-2007/CPs/Completed/CP-ITI-156-06.doc CP-ITI-156-06.doc] | ||
+ | | ATNA PIX/PDQ Events | ||
+ | | PIX & PDQ | ||
|- | |- | ||
| [ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2006-2007/CPs/Completed/all_209_00.doc all_209_00.doc] | | [ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2006-2007/CPs/Completed/all_209_00.doc all_209_00.doc] |
Revision as of 11:30, 4 June 2007
Introduction
See Change Proposal process page.
Return to ITI Technical Committee
ITI CP Tracking
All Change Propoposal management is in ITI CP ftp site. The tracking spreadsheet can be accessed at Status directory. It is the file with the most recent date in that directory.
Directory Structure
- Assigned
- contains CPs that have been assigned an editor and are being actively worked on by the committee, i.e. Assigned status
- Ballots
- contains Ballots that have been released for voting by the general community
- Canceled
- contains CPs that have been canceled, i.e. Canceled status
- Completed
- contains the last version of a CP that is in Completed status. It is waiting to be put in a ballot
- FinalText
- contains the last version of a CP that is in FinalText status. It is has been approved by ballot and is waiting to be integrated into the TF.
- Incoming
- contains CPs which have been submitted but have not been assigned a CP number or an editor. This is the place that new incoming CPs are placed prior to the first stage of processing by the committee.
- old_versions
- Contains old versions of Completed and FinalText CPs
- Rejected
- CPs that have been submitted by rejected by the committee
- Status
- contains spreadsheets describing the status of CPs.
Integrated CPs
These CPs have been integrated into the Technical Framework and Supplements.
CP | Title | Profiles Affected | Date |
---|---|---|---|
CP-ITI-229-01.doc | RFD Needs ITI Transaction Numbers | RFD | May 2007 |
Final Text CPs
These CPs are ready for integration into the Technical Framework and Supplements.
CP | Title | Profiles Affected |
---|---|---|
CP-ITI-244-00.doc | Consistent terminology specified in CP 150 not applied to Vol. 1 | XDS |
Completed CPs
These CPs are ready for ballot. They have not yet been balloted.
CP | Title | Profiles Affected |
---|---|---|
xds_030_06.doc | Standardizaton of XDS Documents | XDS |
xds_130_03.doc | DocumentEntry.legalAuthenticator should be multivalued | XDS |
xds_145_01.doc | Date/Time Format | XDS |
CP-ITI-156-06.doc | ATNA PIX/PDQ Events | PIX & PDQ |
all_209_00.doc | Volume 1: Appendix F is obsolete | ATNA |
pix_xds_212_02.doc | Why does Doc Reg get A08 messages | XDS/PIX |
xdssd_214_01.doc | Format code not consistant with other profiles | XDS-SD |
xds_227_01.doc | Provide list of Content Integration Profiles | XDS |
CP-ITI-232-03.doc | ATNA Self Signed and CA Signed Certificates | ATNA |
CP-ITI-239-03.doc | Audit Syslog Requirements (TAG field) | ATNA |
CP-ITI-240-02.doc | Mapping CDA ID to XDS-SD | XDS-SD |
CP-ITI-242-01.doc | PDQ Use case #2 correction | PDQ |
CP-ITI-243-02.doc | PDQ RCP Field 2 clarification | PDQ |
The ITI specific CP Process
See CP Process for IHE specific processing.
- Submission into the Incoming directory
- First consideration by the committee. If CP is accepted it is given a CP #, assigned an editor, renamed to CP-ITI-xxx_00.doc and placed in Assigned. If CP is rejected it is moved to Rejected and submitter is informed of explanation for rejection. Likely reasons for rejection are: dublicate, merged, withdrawn or not enough information to understand the request. Rejected CPs can be resubmitted with more information for reconsideration.
- Committee works with editor to draft the CP. Versions are kept in Assigned directory and numbered starting with -00, -01, -02, etc.
- Committee decides CP is ready for ballot. Latest version of CP is moved to Completed diretory and old versions are moved to old_versions.
- Co-chair collects Completed CPs into a ballot. The Ballot directory will be used for this.
- Ballot is released to the general community for voting
- Votes and comments are collected. All yes votes means the CP passed ballot and moved to FinalText. No votes are resolved by the committee. Sometimes CP is withdrawn, sometimes NO voter changes to yes vote after explanations. CP may be updated in this process. If updates are insignificant (clarification only) the CP is considered passed. If updates are significant the CP is submitted for another ballot.
- CP approved in ballot are put in FinalText and scheduled to be integrated into the Technical Framework or Supplement.
May 30, 2007
The CPs listed below were discussed on the call. The version listed below of each file is the version including the updates from today's discussion. If the link fails then the author has not yet submitted the promised fixes. To load previous version, copy/paste the link and edit.
- CP-ITI-233-01.doc - Ready for Ballot
- CP-ITI-236-01.doc - Ready for Ballot
- CP-ITI-237-02.doc - small edits - Ready for Ballot
- CP-ITI-238-03.doc - small edits - Ready for Ballot
- CP-ITI-239-00.doc - Already approved for Ballot - no discussion necessary
- CP-ITI-234-02.doc - ATNA Maintaining a List of Certificates for Trusted Nodes/Applications - wording and concept issues. John is providing additional background material and will work work Manuel.
- xds_117_03.doc - small fixes, may be some addition comments via email, once incorporated it will be ready for ballot
- CP-ITI-230-02.doc - small edits - Ready for Ballot - needs wiki article on how to fill this in.
- xdssq_215_02.doc - small updates - Ready for Ballot
- CP-ITI-180-01.doc - Ready for Ballot
- CP-ITI-235-00.doc - Duplicate - issues solved by CP 232
- CP-ITI-250-02.doc - small update - Ready for Ballot
- CP-ITI-247-01.doc - small update - Ready for Ballot
- CP-ITI-248-00.doc - Ready for Ballot
- CP-ITI-249-00.doc - John will update and start discussion on ITI Tech
May 25, 2007
- CP-ITI-156-04.doc- editorial comments, updated version will be reviewed by email and then ready for ballot.
- xds_164_09.doc - reformat to go into the Security Considerations sections of transactions (rather than in a separate appendix). Updated version will be reviewed by email and then ready for ballot.
- CP-ITI-232-02.doc - small editorial update and then ready for ballot.
- CP-ITI-239-02.doc - small editorial update and then ready for ballot.
May 24, 2007
- CP-ITI-244-00.doc - Ready to be integrated.
- xds_028_06.doc Reg/Rep Error Codes - Editorial updates suggested, email review then ready for ballot.
- xds_187_05.doc Extra Metadata - one word change then ready for ballot.
- CP-ITI-238-00.doc - Strike note 1 & 2 and include explanatory text for submitter. Email review then ready for ballot.
- CP-ITI-241-02.doc - Editorial changes. Email review then ready for ballot.
- CP-ITI-246-00.doc - Editorial changes. Email review then ready for ballot.
- CP-ITI-242-01.doc - ready for ballot.
- CP-ITI-243-01.doc - typo fix then ready for ballot.
May 23, 2007 Joint with PCC
- Additional XDS Document Entry Identifiers Change Proposal CP-ITI-Additional_XDS_Document_Entry_Identifiers-03.doc. Discussion fleshed out the details of the proposal and identified a solution. Probably needs to be released as a small supplement. Keith will write up next version and distribute to committees.
- CP-ITI-240-01.doc - after discussion and clarification this CP is ready to be issued for ballot
- BPPC - ready to go to final text after application of several PCC change proposals. Agreed to provided revised supplement to ITI mid-June for review and feedback in July. After updates based on review the supplement will be integrated into the ITI Vol. 1 and 2 Technical Framework documents as part of the update to V4.0 expected in August.
- Web Services - Both ITI and PCC are defining HL7 V3 Web SErvices transactions. This work needs to be harmonized. Keith will review ITI's work and give input.
Face-to-face May 15, 2007
Agenda & Minutes
- CP-ITI-241-01.doc - agreed to general direction of the CP. Break the lifecycle management options into independent options (including replace). Add query to be an optional transaction that is required if any of the options are specified.
- xds_117_02.doc - good and substantial comments were received, an updated version will be reviewed again
Face-to-face May 16, 2007
- CP-ITI-234-00.doc - Reassign to Manuel Metz, new version at CP-ITI-234-01.doc
- CP-ITI-236-00.doc - context explained and now understood. John will review existing text in that context and decide if textual update is needed.
- xds_028_05.doc - minor updates suggested. ready for ballot
- xds_055_01.doc - suggested to cancel. Canceled and moved to xds_055_02.doc
- xds_147_00.doc - agreed to normalize prior to compare of patient id by registry. Rob to write up.
- pix_xds_212_01.doc - Ready for ballot
Tcon May 7, 2007
Agenda & Minutes
- pix_204_02.doc Agreed in principle, Laurie and Dave will be asked to review detailed text and then it will be released for ballot.
- xds_028_03.doc General agreement on the direction. Suggestion that there should be a partial sucess status added. Email to ititech will solicit further comments.
- Submissions from Laurie accepted and assigned CP 242 & 243. With a few wording fixes these are ready for ballot.
- xds_118_00.doc agreed to cancel
- pdq_203_01.doc Agreed on direction, Yongjian will update and review with Laurie and then ready for ballot.
- CP-ITI-239-01.doc Reassigned to John.
- CP-ITI-241-00.doc Requires a Vol. 1 update as well and discussion of requirement of query.
Tcon April 2, 2007
Agenda & Minutes
- Incoming CP review (ATNA only), see incoming directory
- CP-ITI-ATNA-MOORE-TLS-Break-Glass.doc Reject this CP as inappropriate.
- CP-ITI-232-00.doc (originally named CP-ITI-ATNA-MOORE-Self-Signed-Certificate.doc) Assign to John, # 232
- CP-ITI-233-00.doc (originally named CP-ITI-ATNA-MOORE-Key-Length.doc) Systems must be able to be configurable to key lengths between 1024-4096. Assign to John, #233
- CP-ITI-ATNA-MOORE-Certificate-Request-Process.doc Reject, but process should be a part of the testing environment.
- CP-ITI-234-00.doc (originally named CP-ITI-ATNA-MOORE-Certificate-Per-System-Not-CA.doc) Assign to John, #234
- CP-ITI-235-00.doc (originally named CP-ITI-ATNA-MOORE-Certificate-Contents.doc) Assign to Rob, #235. Should require that a system be able to configure off the checking of hostname.
- CP-ITI-236-00.doc (originally named CP_ATNA_070216.doc] Assign to John, #236
- Assigned CPs ready for review: (as time allows, in following order)
- 209 - Move CP to complete. All the items in the referenced Appendix have been addressed by the standards body. So the list should be removed from the TF. This CP updates the appendix to be empty.
- 164 - Reviewed discussion items in text. Agreed that this should be an XDS specific section in a new Appendix. The PDQ and PIX work will be another section in the same appendix.
- CP-ITI-228-01.doc - Brief review. Needs review by originator (Sarah).
- 156 - Warren: deferred
- 212 - Charles: deferred
- CP Planning: Plan future CP work
- xds_118_00.doc- Requires clarification by original initiator. Steve/Karen to followup with possible initiator. Re-assigned to Karen. New version at CP-ITI-118-01.doc
- xds_147_00.doc - Two possible approaches to this a) require registries to do unicode normalization b) require patient ids to be in the ASCII character set. Second option seems preferable. Rob will write that option up and it will be distributed to national areas that would have a concern (Korea, others?)
- dsg_160_00.doc - This requires more thought and there seems to be no urgency. Still not enough vendors implementing DSG to require connectathon testing of it.
- atna_180_00.doc - team login question requires further discussion with larger group.
Tcon March 23, 2007
See Minutes .