PCD MEM 2013-05-17: Difference between revisions
m →Proposed Agenda: update agenda |
m →Next Meeting: add link |
||
| Line 83: | Line 83: | ||
== Next Meeting == | == Next Meeting == | ||
Friday May 24, 3PM Eastern (NY Time) | Friday May 24, 3PM Eastern (NY Time) [[PCD_MEM_2013-05-24]] | ||
[[Patient Care Device | PCD Home]] | [[Patient Care Device | PCD Home]] | ||
Revision as of 14:04, 11 May 2013
Patient Care Device Domain - Medical Equipment Management Working Group
Meeting Purpose
Develop a Demonstration at AAMI 2013 conference to showcase messaging between devices, CMMS, alarm management/phones
Meeting Information
Topic: PCD Device Comm and RTLS at AAMI
Date: Friday 5/17 at 2:00P EDT (NY Time)
Duration: 60 minutes
Proposed Agenda
Placeholder
Verification of the Potential Demonstration Messaging
- - Confirmed:
- B Braun to AwarePoint - PCD-10 start/pause or stop – Benjamin reported on track
- Hospira to AwarePoint - PCD-10 – Benjamin reported on track
- Hospira Location – Simulated display – will do
- B Braun and Hospira PCD-10 to EQ2; will be ready
- Philips Monitor to EQ2: not available
- Al will send PCD-04 sample to Jim; B Braun could send low battery alarm to EQ2: will work
- Philips monitor alarm to EQ2 – unknown status
- Philips alarm system receiving alarm from a device, shown on monitor, phone
- John would send a battery alarm
- EQ2 will have a dummy location on display
- Jim requested clarification of the message for visitors
- - Bob, Rob, John Rhoads for updates
- - Handouts - Status Report
- - Report: Invitation/Heads Up to AAMI Exhibitors and Others (possibly modify for other profiles and vendor targets)
- - Recruiting CMMS, RTLS Vendors
- - Recruiting VA, ISOs, Others
- - Next Meeting
Participants
Placeholder Chair: Manny Furst
Carlene Anteau, Al Engelbert, Monroe Pattillo, Paul Sherman, Jim Smith, Benjamin Yam, Manny Furst
Discussion
Placeholder Manny reviewed the agenda and attachments in the email sent in advance of the meeting.
Placeholder Verification of the Potential Demonstration Messaging
- - Confirmed:
- B Braun to AwarePoint - PCD-10 start/pause or stop
- Hospira to AwarePoint - proprietary and possibly PCD-10
- Hospira Location – Simulated display, live start/stop or pause
- B Braun sent sample PCD-10 to EQ2; nothing yet from Hospira
- Al will send PCD-04 sample to Jim; B Braun could send low battery alarm to EQ2 if desired
- Philips monitor alarm to EQ2 – unknown status
- - Manny to ask Bob and Rob to work with Al, John Rhoads for alarm
- Philips alarm system receiving alarm from a device, shown on monitor, phone.
- John would send a battery alarm.
- - Monroe will send connection/configuration information next week.
- - Jim offered insight into utilization: two aspects - units of time, units of use (e.g., one scan of a diagnostic ultrasound unit); location will require identification of the unit and location as free form or more specifically related to a universal structure. Monroe added that the ITI domain is looking at location in the limited sense of the hospital’s clinical location; this is not RTLS in the usual sense. He described the lack of standards.
Placeholder Posters
- - MEM poster was discussed. Jim suggested that the center portion become a greater focus. He and Paul will offer suggestions early next week.
- This will likely obviate the need for second poster describing the combination of DCM and RTLS.
- - MEM: Change to IPEC for this year.
Placeholder Handout
- - Participants will review the handout. It will be reviewed Tuesday and hopefully finalized next week. Carlene was thanked for the editing and revised format.
- - Manny asked if a second handout focused on the DMC/RTLS demonstration and benefits would be useful as a take away and to facilitate biomeds’ discussion with other vendors, encouraging them to join the WG and develop the profiles.
Next Meeting
Friday May 24, 3PM Eastern (NY Time) PCD_MEM_2013-05-24