ITI Change Proposals 2007: Difference between revisions

From IHE Wiki
Jump to navigation Jump to search
Witting (talk | contribs)
Witting (talk | contribs)
Line 85: Line 85:
<b>Agenda & Minutes</b>
<b>Agenda & Minutes</b>
* [ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2006-2007/CPs/Assigned/CP-ITI-241-01.doc CP-ITI-241-01.doc]
* [ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2006-2007/CPs/Assigned/CP-ITI-241-01.doc CP-ITI-241-01.doc]
* [ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2006-2007/CPs/Assigned/xds_117_01.doc xds_117_01.doc]
* [ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2006-2007/CPs/Assigned/xds_117_02.doc xds_117_02.doc]
* [ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2006-2007/CPs/Assigned/CP-ITI-228-01.doc CP-ITI-228-01.doc]
* [ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2006-2007/CPs/Assigned/CP-ITI-228-01.doc CP-ITI-228-01.doc]



Revision as of 08:36, 15 May 2007

Introduction

See Change Proposal process page.

Return to ITI Technical Committee

ITI CP Tracking

All Change Propoposal management is in ITI CP ftp site. The tracking spreadsheet can be accessed at Status directory. It is the file with the most recent date in that directory.


Directory Structure

Assigned
contains CPs that have been assigned an editor and are being actively worked on by the committee, i.e. Assigned status
Ballots
contains Ballots that have been released for voting by the general community
Canceled
contains CPs that have been canceled, i.e. Canceled status
Completed
contains the last version of a CP that is in Completed status. It is waiting to be put in a ballot
FinalText
contains the last version of a CP that is in FinalText status. It is has been approved by ballot and is waiting to be integrated into the TF.
Incoming
contains CPs which have been submitted but have not been assigned a CP number or an editor. This is the place that new incoming CPs are placed prior to the first stage of processing by the committee.
old_versions
Contains old versions of Completed and FinalText CPs
Rejected
CPs that have been submitted by rejected by the committee
Status
contains spreadsheets describing the status of CPs.

Final Text CPs

These CPs are ready for integration into the Technical Framework and Supplements.

CP Title Profiles Affected
CP-ITI-229-01.doc RFD Needs ITI Transaction Numbers RFD

Completed CPs

These CPs are ready for ballot. They have not yet been balloted.

CP Title Profiles Affected
xds_227_01.doc Provide list of Content Integration Profiles XDS
xds_145_01.doc Date/Time Format XDS
xds_130_03.doc DocumentEntry.legalAuthenticator should be multivalued XDS
xds_030_06.doc Standardizaton of XDS Documents XDS
all_209_00.doc Volume 1: Appendix F is obsolete ATNA
CP-ITI-244-00.doc Consistent terminology specified in CP 150 not applied to Vol. 1 XDS

The ITI specific CP Process

See CP Process for IHE specific processing.

  1. Submission into the Incoming directory
  2. First consideration by the committee. If CP is accepted it is given a CP #, assigned an editor, renamed to CP-ITI-xxx_00.doc and placed in Assigned. If CP is rejected it is moved to Rejected and submitter is informed of explanation for rejection. Likely reasons for rejection are: dublicate, merged, withdrawn or not enough information to understand the request. Rejected CPs can be resubmitted with more information for reconsideration.
  3. Committee works with editor to draft the CP. Versions are kept in Assigned directory and numbered starting with -00, -01, -02, etc.
  4. Committee decides CP is ready for ballot. Latest version of CP is moved to Completed diretory and old versions are moved to old_versions.
  5. Co-chair collects Completed CPs into a ballot. The Ballot directory will be used for this.
  6. Ballot is released to the general community for voting
  7. Votes and comments are collected. All yes votes means the CP passed ballot and moved to FinalText. No votes are resolved by the committee. Sometimes CP is withdrawn, sometimes NO voter changes to yes vote after explanations. CP may be updated in this process. If updates are insignificant (clarification only) the CP is considered passed. If updates are significant the CP is submitted for another ballot.
  8. CP approved in ballot are put in FinalText and scheduled to be integrated into the Technical Framework or Supplement.

Face-to-face May 15, 2007

Agenda & Minutes

Tcon May 7, 2007

Agenda & Minutes

  • pix_204_02.doc Agreed in principle, Laurie and Dave will be asked to review detailed text and then it will be released for ballot.
  • xds_028_03.doc General agreement on the direction. Suggestion that there should be a partial sucess status added. Email to ititech will solicit further comments.
  • Submissions from Laurie accepted and assigned CP 242 & 243. With a few wording fixes these are ready for ballot.
  • xds_118_00.doc agreed to cancel
  • pdq_203_01.doc Agreed on direction, Yongjian will update and review with Laurie and then ready for ballot.
  • CP-ITI-239-01.doc Reassigned to John.
  • CP-ITI-241-00.doc Requires a Vol. 1 update as well and discussion of requirement of query.

Tcon April 2, 2007

Agenda & Minutes

  • Assigned CPs ready for review: (as time allows, in following order)
    • 209 - Move CP to complete. All the items in the referenced Appendix have been addressed by the standards body. So the list should be removed from the TF. This CP updates the appendix to be empty.
    • 164 - Reviewed discussion items in text. Agreed that this should be an XDS specific section in a new Appendix. The PDQ and PIX work will be another section in the same appendix.
    • CP-ITI-228-01.doc - Brief review. Needs review by originator (Sarah).
    • 156 - Warren: deferred
    • 212 - Charles: deferred
  • CP Planning: Plan future CP work
    • xds_118_00.doc- Requires clarification by original initiator. Steve/Karen to followup with possible initiator. Re-assigned to Karen. New version at CP-ITI-118-01.doc
    • xds_147_00.doc - Two possible approaches to this a) require registries to do unicode normalization b) require patient ids to be in the ASCII character set. Second option seems preferable. Rob will write that option up and it will be distributed to national areas that would have a concern (Korea, others?)
    • dsg_160_00.doc - This requires more thought and there seems to be no urgency. Still not enough vendors implementing DSG to require connectathon testing of it.
    • atna_180_00.doc - team login question requires further discussion with larger group.

Tcon March 23, 2007

See Minutes .

Return to