PCD Connectathon&Showcase 2010-12-21 Webex: Difference between revisions
Jump to navigation
Jump to search
m →Agenda: update agenda |
m →Discussion: enter the summary |
||
| Line 78: | Line 78: | ||
| '''Status/Discussion:''' | | '''Status/Discussion:''' | ||
* Pre-Connectathon and Connectathon Tests | * Pre-Connectathon and Connectathon Tests | ||
: | :- Manny indicated that he will accept test results all week, and next week and will try to review them. In the absence of review participants who are confident in their success should assume they met requirements. | ||
:- Connectathon testing: No significant issues were raised. | |||
:- Connectathon logistics: Deadlines tomorrow: Steve Moore’s emails registrations, ip addresses (Google Groups). Steve notified everyone to bring Ethernet cables, recommended power strips. Manny added cables, etc. including spares of all that can be brought. Access points were discussed. Geri has Matt's approval for her AP, Al will bring one but not use it unless necessary. Manny indicated that PCD participants should plan on a meeting with Matt during the Connectathon. | |||
'''Decisions/Issues:''' | '''Decisions/Issues:''' | ||
| Line 86: | Line 88: | ||
|- | |- | ||
| align="center" | 4 | | align="center" | 4 | ||
| '''Showcase | | '''Showcase''' <br>- Manny | ||
| '''Status/Discussion:''' | | '''Status/Discussion:''' | ||
* General | * General | ||
: | :- Discussion centered around items listed on the To Do list that was provided by email to the group in advance. Manny asked for the data required to enable specification of electrical and network support within and outside the structure. This includes definition of the clinical story, sequence of clinical sites, and to the extent possible, identification of devices and systems required. Manny will update the documents and drawings of the structure and deliver that to Elli around Jan. 1. | ||
'''Decisions/Issues:''' | '''Decisions/Issues:''' | ||
| Line 101: | Line 100: | ||
|- | |- | ||
| align="center" | 5 | | align="center" | 5 | ||
| ''' | | '''AAMI Mini-Showcase''' <br>- | ||
| '''Status/Discussion:''' | | '''Status/Discussion:''' | ||
:* | :* Deferred | ||
'''Decisions/Issues:''' | '''Decisions/Issues:''' | ||
Revision as of 23:23, 21 December 2010
PCD Connectathon & Showcase Meeting, December 21, 2010
PLACEHOLDER
Action Items
You can find the Action Items at http:___
Agenda
Connectathon Portion of the Agenda
- Multiple items due to Steve: attendance/registration of people, network, etc.
- Tests not posted to Gazelle this week will be considered as passed if time doesn't permit review.
Showcase Portion of the Agenda
- Refer to Excel "to do" list
- Submit Dec. 24 due items before celebrating.
- General, remaining
- In general, it appears that we have reasonable representation of the three profiles on all three walls (and stories). A few issues are apparent:
- - Where and how to include the SPD (filter) option – is time available in the logical place (DEC/mother/baby) and/or elsewhere?
- - Where and how to reference work in progress, notably WCM (and the same can be said for events, MEM and other efforts)? Posters? Part of the handout? Included in the script?
- - What will the Meaningful Use wall require in the number and type of devices?
- - Are all vendors who are asked to provide multiple systems able to do so? With the need to speak to three, if not four profiles, we need to populate the other walls, and this will require at least one, if not two or three additional devices. Also, with so many devices on the DEC wall, and limited time to provide visibility to each type, I would like to see many represented on a second wall.
- - Are the three EMRs and SIS’ periop system capable of displaying representative data from the various systems (DOR at least)?
- - What should be in the handout (last year’s is at ftp://ftp.ihe.net/Patient_Care_Devices/Showcases/HIMSS2010March/Handouts/)?
- Posters
- - We will make use of posters to provide visitors with more detail and fill in gaps, and to provide vendors with a way to address questions. Last year’s posters are at ftp://ftp.ihe.net/Patient_Care_Devices/Showcases/HIMSS2010March/PCD_Posters_2010/. This year posters were listed in an earlier email.
- We need volunteers.
- Docents
- Volunteers
AAMI Mini-Showcase Will be addressed later.
Participants
Placeholder Terry Bettis, Robert Britton, Eric Chetwynd, Scott Eaton, Al Engelbert, Robert Flanders, Ken Fuchs, Sarah Hopkins, Roger Kittelson, Nitin Kunte, Khalil Maalouf, Geri Mitchell-Brown, Monroe Pattillo, Huili Wang, Scott Zaffrin, Manny Furst
Discussion
Item Topic Discussion 1 Introductions & Agenda Review
- MannyStatus/Discussion: - No changes were made to the agenda
Decisions/Issues:
Action(s):
2 Previous Meeting Summary
- MannyStatus/Discussion: Decisions/Issues:
- Accepted
Action(s):
3 Testing
-Status/Discussion: - Pre-Connectathon and Connectathon Tests
- - Manny indicated that he will accept test results all week, and next week and will try to review them. In the absence of review participants who are confident in their success should assume they met requirements.
- - Connectathon testing: No significant issues were raised.
- - Connectathon logistics: Deadlines tomorrow: Steve Moore’s emails registrations, ip addresses (Google Groups). Steve notified everyone to bring Ethernet cables, recommended power strips. Manny added cables, etc. including spares of all that can be brought. Access points were discussed. Geri has Matt's approval for her AP, Al will bring one but not use it unless necessary. Manny indicated that PCD participants should plan on a meeting with Matt during the Connectathon.
Decisions/Issues:
Action(s):
4 Showcase
- MannyStatus/Discussion: - General
- - Discussion centered around items listed on the To Do list that was provided by email to the group in advance. Manny asked for the data required to enable specification of electrical and network support within and outside the structure. This includes definition of the clinical story, sequence of clinical sites, and to the extent possible, identification of devices and systems required. Manny will update the documents and drawings of the structure and deliver that to Elli around Jan. 1.
Decisions/Issues:
Action(s):5 AAMI Mini-Showcase
-Status/Discussion: - Deferred
Decisions/Issues:
Action(s):
Return to main WG page which has links to individual meeting pages
Return to main PCD Connectathon/Showcase WG page: PCD_Connectathon&Showcase_WG_2010-11