PCD Connectathon&Showcase WG 2009-10: Difference between revisions
m →Proposed Agendas July, 2009: edit |
m →December 2009 Meetings: establish sections |
||
| Line 129: | Line 129: | ||
19 Special Meeting to Discuss Scenario Friday, February 20 11 am EST | 19 Special Meeting to Discuss Scenario Friday, February 20 11 am EST | ||
== August 2009 Meetings == | |||
== September 2009 Meetings == | |||
== October 2009 Meetings == | |||
== November 2009 Meetings == | |||
== December 2009 Meetings == | == December 2009 Meetings == | ||
Revision as of 22:15, 4 July 2009
This is the entry point for this Working Group in the 2009-10 Connectathon and HIMSS Showcase cycle.
Meeting Purpose
Collaborative effort to discuss implementation and demonstration issues and preparations
Related Pages and Documents
PCD Pre-Connectathon Testing 2010
PCD Virtual Connectathon Testing 2010
WebEx Information
Topic: PCD Connectathon and Showcase Working Group
Dates: Most __days, October through April
Time: _ pm, Eastern Time (New York )
Duration: 60 Minutes
July, 2009 Meetings
1 First meeting PCD Connectathon&Showcase 2009-__-08 Webex, potential agenda items:
- Introductions
- Review of meeting purpose
- Consideration of Wiki page(s) for minutes, action items, Scenario (e.g., one page or one page per meeting)
- Summary of preparation process
- Development of a calendar
- Mandatory workshop Oct. 29-31
- List of profiles, actors
- Brief description of the MWB and its uses
- Reminder of MWB tutorial Oct. 10
- Review of testing concepts developed to date
- Developing Scenario(s)
- Process, timetable, tools
meeting PCD Connectathon&Showcase 2009-02-11 Webex PCD Connectathon&Showcase 2009-02-11 Webex
Please add to the list
- Action Items
- Issues and questions about:
- HL7 coding
- - EUI-64
- Kudu, Connectathon, Showcase
- Any discrepancies on tests
- Connectathon Planning
- Status report on tests for Connectathon
- - Wiki page is available for recording Virtual Connectathon results
- - Can you test with two patients' data (e.g., two beds, two ARs or one AR with two patients)?
- NIST validation of RTM
- Showcase Planning
- Scenario update
- System Assignments - identifying your partners,
- - Tours - rethinking the concepts
- Showcase Internet connections
- Showcase Virtual Connectathon and Rehearsal at the Connectathon
- Monitoring progress, issues through the rest of the process
- - Risk Assessment
- -Wiki page for Scripts
- Showcase Structure
- - Drawings, only minor changes are required
- - Utilities (electric, network)
- - Physical requirements (size, mounts if larger, etc)
- - Logos -
- - Signs thanking supporters
- Timeline
- Steve's new list: http://ihewiki.wustl.edu/wiki/index.php/North_America_2009
18 16th regular meeting PCD Connectathon&Showcase 2009-02-18 Webex PCD Connectathon&Showcase 2009-02-18 Webex
Please add to the list
- Action Items
-
- Issues and questions about:
- Monroe experienced a time out problem with the MWB.
- Appropriate dosing units for drugs
- HL7 coding
- - EUI-64
- Kudu, Connectathon, Showcase
- Any discrepancies on tests
- Issues and questions about:
- Connectathon Planning
- Status report on tests for Connectathon
- Schedule - set up begins Monday at 8, testing at 10 am
- NIST validation of RTM
- Dress code
- Showcase Planning
- Scenario update
- System Assignments - identifying your partners,
- - Tours - rethinking the concepts
- Showcase Internet connections
- Showcase Rehearsal at the Connectathon
- Monitoring progress, issues through the rest of the process
- - Risk Assessment
- -Wiki page for Scripts:
- Showcase Planning
- Scenario update
- System Assignments - identifying your partners,
- - Tours - rethinking the concepts
- Showcase Internet connections
- Showcase Rehearsal at the Connectathon
- Monitoring progress, issues through the rest of the process
- - Risk Assessment
- -Wiki page for Scripts
- Dress code
- Showcase Structure
- - Drawings
- - Logos
- - Signs thanking supporters
- Timeline
- Steve's new list: http://ihewiki.wustl.edu/wiki/index.php/North_America_2009
19 Special Meeting to Discuss Scenario Friday, February 20 11 am EST
August 2009 Meetings
September 2009 Meetings
October 2009 Meetings
November 2009 Meetings
December 2009 Meetings
January 2010 Meetings
2009-10 Calendar
example from last year This is intended as a work in progress, with milestones added or modified throughout the cycle. Dates to be assigned.
- Development of Test Concepts with the Profile WGs - Dec. 21
- Development of the Pre-Connectathon Tests (MWB and NIST tools) to qualify systems for the Virtual and actual Connectathons
- Development of Connectathon Tests
- Reporting successful completion of Pre-Connectathon Qualifying Tests (initial qualifying MESA test, PCD profile tests)
- Conduct of Virtual Connectathon Testing and reporting results - No later than last two weeks of Jan.
- Submission of networking requirements to Steve Moore - Dec. 17 with MAC addresses due to Steve by Jan. 15
- Definition of Scenario for Showcase - Rough draft Jan. 6
- Definition of space, utility and other requirements for the Showcase - Dec. 17
Action Items (Details in meeting notes)
Item Example from last year
- from Jan. 21
- Open Date: Monitor PCD Connectathon registrations periodically.
- Jan. 28: (All) Consider a more effective way to communicate the IHE/PCD message, with fewer presentations.
- Determine which systems provide comparable information within the storyline, even if they are unique in other ways.
- Jan. 28: (Manny) Define data for preload, registration feed for visitors. Consider eliminating printers.
- Jan. 28: (Manny) Address GE's concerns about staffing their Enterprise system.
- Jan. 28: (Manny) Update on ADT/patient-visitor id and association with systems.
- Update on ADT/patient-visitor id and association with systems. Focused meeting, include diagram and other information to be provided.
- John Donnelly will address this as part of the Showcase focused portion of this meeding.
- Check with Bill Klaver, John Donnelly, and Steve Moore. A04 will work this year
- Verify that we will have an A04 message this year. Request preloaded data (medication order, demographics).
- Provide material for the Scenario (outline or brief description) to be followed by Manny compiling a single view.
- Identify overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
- Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow
- Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
- Zebra has agreed to provide printers. We need to decide between two suggested models; determine if Epic can use the same Postscript printer Ruth provides; assure access to the registration kiosk.
- Updates on how RTM will be tested in Pre-Connectathon, Virtual Connectathon, and Connectathon.
- (Pump Vendors, Enterprise Systems) Vendors will provide their own approach to bar coding for drugs, infusions, patients and caregivers.
- Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.
- Identify the devices to be connected to middleware, the coding of parameters, identifying partners for testing and demonstration.
- Coordinate ADT testing (Virtual and Connectathon) with Bill Klaver, coordinate with Steve Moore, John Donnelly, seek a backup system.
- Update name for alarm product
- Confirm structure diagrams and utilities
- Define contents of fourth wall
- Set PCD Docent training WebEx / on site (and run through at Connectathon)
- Webex run through of draft Scenario
- Update block diagram with locations of SIS, Cerner, Capsule
- Steve Moore needs MAC addresses
- Virtual Connectathon (tentative deadline for completion; partners may test anytime before this)
- Determine if Cerner can support the AR actor in the Showcase.
- Change proposal to PIB for ADT in PIB option.
Closed Action Items
- Why are more companies not implementing SPD query within DOC? Which companies will implement and test this query this year?
- Review items in http://wiki.ihe.net/index.php?title=IHE_PCD_2009_Showcase_Workshop_2008-10-28_to_30#Meeting_Purpose and determine which are transferred here.
- Manny to contact Jim Higgins (Cerner) to coordinate Hill-Rom support. They provided a bed and a gurney in the past. Rita indicated that Cerner will coordinate Hill-Rom and Stryker beds and a gurney.
- (Manny) Emails to Lisa with feedback on the Workshop
- (Manny) Draft ACM tests ready for review - covered elsewhere
- (Manny) HIMSS badge - MRN? - covered elsewhere
- Ruth indicated that GE Enterprise includes the 5-rights data entry.
- Special meeting was held to address ADT, other ID. Al had provided information about PAM, the need for A04 which is in ITI-31, not ITI-30, will be part of patient ID issue.
- Colin FX (Epic) and Ruth (GE) offered approaches to support patient ID/registration requirements / issues from discussion.
- (All) Patient IDs, ADT/PIB issues, device and caregiver ID are covered in other items on the list.
- (Manny, pump vendors, any others) Wireless spectrum management. Didi is not supportive of addressing this throughout the convention hall, recommends approaching John Donnelly. Manny will contact John.
- Emergin, LiveData) Connectathon on site testing with Polycom is scheduled for Thursday, Friday morning.
- (Ruth) Does GE Enterprise include the 5-rights data entry?
- Sarah Higgins identified contacts at Datamax and Zebra.
- (Manny, pump vendors, any others) Wireless spectrum management. Didi is not supportive of addressing this throughout the convention hall, recommends approaching John Donnelly. Manny will contact John.
- (Emergin, LiveData) Schedule Connectathon on site testing with Polycom
- (Manny) Summarize focused meeting, include diagram.
- (Bikram) Now unlikely to have bidirectional distributed demo - pushing data in from their booth to the demo.
- (Pump Vendors, Enterprise Systems) Vendors will provide their own approach to bar coding for drugs, infusions, patients and caregivers.
- Business card for Showcase w/ all companies listed + Booth numbers - the Showcase handout may address this.
- Cerner added the AR actor.
- (Manny) Created Wiki page for "virtual connectathon" on Connectathon '09 page. Will eventually include, partners, issues list / resolution, status, etc.
- (Bikram, Rita/Jim Higgins) Identify the devices to be connected to middleware, the coding of parameters, identifying partners for testing and demonstration.
- (Brett) Update name for alarm product
- (Manny) Verify that we will have an A04 message this year. Request preloaded data (medication order, demographics).
- Participants indicated they can test with two devices/patients' data (e.g., two pumps, two beds, two ARs or one AR with two patients)?
- Structure:
- - Utilities (electric, network)
- - Physical requirements (size, mounts if larger, etc)
- (All) The revised approach permits closing the following:
- - Determine which systems provide comparable information within the storyline, even if they are unique in other ways.
- - (All) Provide material for the Scenario (outline or brief description), consistent with the overarching message (e.g., patient safety. Note that Ray presented the stakeholder survey which showed
- - Survey Slide #17, "Improved Patient Care and Safety" was by far the greatest "incentives for IHE integration"; #2 was "Long term cost reduction"; #3 was improved workflow
- - Workshop discussion suggested we focus on these, with 5 rights, remote alarm communication among the specifics
- (Manny) Define data for preload, registration feed for visitors. Consider eliminating printers.
- (Manny) Address GE's concerns about staffing their Enterprise system.
- Virtual Connectathon:
- - ADT: Bill Klaver for Virtual Connectathon; John Donnelly, and Steve Moore for Connectathon and Showcase. A04 will work this year
- (Manny) Final decision on printers.
- (Pump Vendors, Enterprise Systems) Vendors will provide their own approach to bar coding for drugs, infusions, patients and caregivers.
- (All) Confirm structure diagrams and utilities - hard deadline for PCD before the Connectathon.
- Steve Moore needs MAC addresses
- Comments on Virtual Connectathon experience - replaced with "lessons learned" scheduled for 3/4
- Monroe experienced a time out problem with the MWB.
- Monitor PCD Connectathon registrations periodically.
- The Task Force will meet next Wednesday following the weekly meeting. A "reading" will be scheduled for Friday, Feb. 20 to prepare for the HIMSS Showcase rehearsal with equipment at the Connectathon.
- First Webex run through of draft Scenario
- Lessons learned leading up to and through the Connectathon
- - Pre-Connectathon process and tests, Virtual Connectathon process and tests, Connectathon process and tests
- Showcase Internet connections
- - IP addresses - DHCP
- Showcase wireless availability (802.11 b/g) - If HIMSS doesn't provide
- - Schedule a reading for docents and rehearsals
- Read, review the script