Difference between revisions of "Rad TF Maintenance 2014-15"
Jump to navigation
Jump to search
(4 intermediate revisions by the same user not shown) | |||
Line 14: | Line 14: | ||
:* 6 '''Submitted''' CPs to review/assign (as of Sept 24) | :* 6 '''Submitted''' CPs to review/assign (as of Sept 24) | ||
+ | ::* ftp://ftp.ihe.net/Radiology/TF_Maintenance/0.Submitted_CPs | ||
:* 21 '''Final Text''' CPs to confirm have been incorporated into TF | :* 21 '''Final Text''' CPs to confirm have been incorporated into TF | ||
Line 22: | Line 23: | ||
List of outstanding items not yet submitted as CPs: | List of outstanding items not yet submitted as CPs: | ||
− | :* | + | :* Refactor SWF.b to isolate/reference PAM transactions |
List of other maintenance tasks: | List of other maintenance tasks: | ||
Line 32: | Line 33: | ||
==7. Risks== | ==7. Risks== | ||
− | * Risk of effort spent on updating existing Supplements and TF to match new templates being low return-on-investment. | + | * Risk of effort spent on updating existing Supplements and TF to match new templates being low return-on-investment. (although it does have some payoff in terms of easier to read/understand spec for implementers, possibly lower error rate, and it will reduce work for volume editors folding new template supplements into the TF if the TF is aligned.) |
==9. Tech Cmte Evaluation== | ==9. Tech Cmte Evaluation== | ||
Effort Evaluation (as a % of Tech Cmte Bandwidth): | Effort Evaluation (as a % of Tech Cmte Bandwidth): | ||
− | :* | + | :* 30% to do the identified work |
+ | :* 20% if the Planning Cmte wants us to start dropping bits of maintenance work in favor of new Profile work | ||
− | + | Candidate Coordinator: | |
− | |||
− | |||
− | Candidate | ||
: Kevin O'Donnell | : Kevin O'Donnell |
Latest revision as of 10:23, 25 September 2014
Target:
- Publish CP Ballot in early-Jan 2015 (for CPs needed for IHE-Europe Connectathon in April 2015)
- Allow adequate time at the Nov F2F Meeting to prep for this
- Publish CP Ballot at end-of-April 2015
- Incorporate FT CPs into updated TF released July 2015
- Publish CP Ballot in early-Jan 2015 (for CPs needed for IHE-Europe Connectathon in April 2015)
Number of outstanding CPs:
- 47 Assigned CPs to work on
- For specifics refer to Tracking Doc and sort by Status
- (about 2/3 are stagnant) Should do a review/triage of dormant CPs and cancel or re-start
- 0 Completed CPs that failed ballot and need to be reworked
- 6 Submitted CPs to review/assign (as of Sept 24)
- 21 Final Text CPs to confirm have been incorporated into TF
List of "non-trivial" CPs:
- CP-xxx :
List of outstanding items not yet submitted as CPs:
- Refactor SWF.b to isolate/reference PAM transactions
List of other maintenance tasks:
- IHE-J has prepared a National Extension document for submission (focus on SWF.b)
- Add 2 (estimated) FT Supplements to TF
- Cleanup of Cross-Referencing to ITI (they renumbered their sections)
- Adoption of new IHE Templates for Tech Framework
- An upcoming forcing function will be when we make Final Text any of the new supplements that have used the new supplement template which is intended to align with the new TF Template.
7. Risks
- Risk of effort spent on updating existing Supplements and TF to match new templates being low return-on-investment. (although it does have some payoff in terms of easier to read/understand spec for implementers, possibly lower error rate, and it will reduce work for volume editors folding new template supplements into the TF if the TF is aligned.)
9. Tech Cmte Evaluation
Effort Evaluation (as a % of Tech Cmte Bandwidth):
- 30% to do the identified work
- 20% if the Planning Cmte wants us to start dropping bits of maintenance work in favor of new Profile work
Candidate Coordinator:
- Kevin O'Donnell