Rad TF Maintenance 2012-13: Difference between revisions

From IHE Wiki
Jump to navigation Jump to search
Kevino (talk | contribs)
Created page with "Target: Publish CP Ballot at end-of-April 2013; Incorporate FT CPs into updated TF released July 2013 Number of outstanding CPs: :* XX '''Assigned''' CPs to work on ::* For ..."
 
Kevino (talk | contribs)
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
Target: Publish CP Ballot at end-of-April 2013; Incorporate FT CPs into updated TF released July 2013
Target:  
:* Publish CP Ballot in early-Jan 2013 (for CPs needed for IHE-Europe Connectathon in April 2013)
:* Publish CP Ballot at end-of-April 2013
:* Incorporate FT CPs into updated TF released July 2013
    
    


Number of outstanding CPs:
Number of outstanding CPs:
:* XX '''Assigned''' CPs to work on  
:* 30 '''Assigned''' CPs to work on  
::* For specifics refer to [ftp://iheyr2:interop@ftp.ihe.net/Radiology/TF_Maintenance/IHE_Radiology_CP_Tracking-2012-05-10.xls Tracking Doc] and sort by Status
::* For specifics refer to [ftp://iheyr2:interop@ftp.ihe.net/Radiology/TF_Maintenance/IHE_Radiology_CP_Tracking-2012-05-10.xls Tracking Doc] and sort by Status
::* (about 1/2 are stagnant) Should do a review/triage of dormant CPs and cancel or re-start
::* (about 2/3 are stagnant) Should do a review/triage of dormant CPs and cancel or re-start


:* X '''Completed''' CPs that failed ballot and need to be reworked)
:* 0? '''Completed''' CPs that failed ballot and need to be reworked
 
:* X '''Submitted''' CPs to review/assign
::* <<Summarize>


:* 5 '''Submitted''' CPs to review/assign (as of Oct 26 when this was due)
::* 237 Incorrect reference in Rad 43
::* 238 Align PDF & Text option names for XDS-I.b and XDR-I
::* 239 Refactor RAD-01 and RAD-12 Transactions with IHE ITI PAM
::* 240 Clarify New Series Instance UID semantics in IOCM
::* 241 Clarify how to handle retention policy expiry with XDS-I manifest deletion


List of "non-trivial" CPs:
List of "non-trivial" CPs:
:* CP-xxx : Title (Author)
:* CP-xxx : Title (Author)
:** no "non-trivial" CPs expected
:** no "non-trivial" CPs were raised




List of outstanding items not yet submitted as CPs:
List of outstanding items not yet submitted as CPs:
:* <<Anyone have any?>>
:* 3 more CPs were submitted between Oct 26 and Nov 1


List of other maintenance tasks:
List of other maintenance tasks:
Line 33: Line 39:


Effort Evaluation (as a % of Tech Cmte Bandwidth):
Effort Evaluation (as a % of Tech Cmte Bandwidth):
:* XX% total for maintenance with new templates only for new supplements  
:* 15% total for maintenance with new templates only for new supplements  


Responses to Issues:
Responses to Issues:

Latest revision as of 13:40, 1 November 2012

Target:

  • Publish CP Ballot in early-Jan 2013 (for CPs needed for IHE-Europe Connectathon in April 2013)
  • Publish CP Ballot at end-of-April 2013
  • Incorporate FT CPs into updated TF released July 2013


Number of outstanding CPs:

  • 30 Assigned CPs to work on
  • For specifics refer to Tracking Doc and sort by Status
  • (about 2/3 are stagnant) Should do a review/triage of dormant CPs and cancel or re-start
  • 0? Completed CPs that failed ballot and need to be reworked
  • 5 Submitted CPs to review/assign (as of Oct 26 when this was due)
  • 237 Incorrect reference in Rad 43
  • 238 Align PDF & Text option names for XDS-I.b and XDR-I
  • 239 Refactor RAD-01 and RAD-12 Transactions with IHE ITI PAM
  • 240 Clarify New Series Instance UID semantics in IOCM
  • 241 Clarify how to handle retention policy expiry with XDS-I manifest deletion

List of "non-trivial" CPs:

  • CP-xxx : Title (Author)
    • no "non-trivial" CPs were raised


List of outstanding items not yet submitted as CPs:

  • 3 more CPs were submitted between Oct 26 and Nov 1

List of other maintenance tasks:

  • Cleanup of Cross-Referencing to ITI (they renumbered their sections)
  • Adoption of new IHE Templates <add link>
  • Add 2 FT Supplements to TF (and any made FT next year)
  • R2/RE Harmonization?

7. Risks

  • Risk of effort spent on updating existing Supplements and TF to match new templates being low return-on-investment.

9. Tech Cmte Evaluation

Effort Evaluation (as a % of Tech Cmte Bandwidth):

  • 15% total for maintenance with new templates only for new supplements

Responses to Issues:

See italics in Risk and Open Issue sections

Candidate Editor:

Kevin O'Donnell