PCD Pre-Connectathon Testing 2009: Difference between revisions
Jump to navigation
Jump to search
m →Links: arrange list |
m →ACM Tests: add DEC test section |
||
| Line 2: | Line 2: | ||
The intention is to post the final versions on the PCD ftp site. | The intention is to post the final versions on the PCD ftp site. | ||
== DEC Tests == | |||
== ACM Tests == | == ACM Tests == | ||
== PIV Tests == | == PIV Tests == | ||
Latest revision as of 19:49, 20 November 2008
This page provides the Patient Care Device domain with a place to develop and refine the 2009 North American Pre-Connectathon tests.
The intention is to post the final versions on the PCD ftp site.