PCD Pre-Connectathon Testing 2009: Difference between revisions
Jump to navigation
Jump to search
m Establish page |
m →ACM Tests: add DEC test section |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
The intention is to post the final versions on the PCD ftp site. | The intention is to post the final versions on the PCD ftp site. | ||
== DEC Tests == | |||
== ACM Tests == | == ACM Tests == | ||
== PIV Tests == | == PIV Tests == | ||
| Line 14: | Line 16: | ||
== Links == | == Links == | ||
[[PCD | [[PCD Showcase 2009 Scenario]] | ||
[[PCD Showcase | [[PCD Connectathon&Showcase WG 2008-9]] | ||
[[Patient Care Device | PCD Home]] | [[Patient Care Device | PCD Home]] | ||
Latest revision as of 19:49, 20 November 2008
This page provides the Patient Care Device domain with a place to develop and refine the 2009 North American Pre-Connectathon tests.
The intention is to post the final versions on the PCD ftp site.