Difference between revisions of "IHE Testing and Tools Committee Teleconference Minutes 2009-01-26"
Jump to navigation
Jump to search
Chrisdcarr (talk | contribs) |
Chrisdcarr (talk | contribs) |
||
Line 27: | Line 27: | ||
'''5. Product Registry''' - Eric Poiseau | '''5. Product Registry''' - Eric Poiseau | ||
* Reviewed [http://sumo-test.irisa.fr:8080/ProductRegistry-dev/home.seam current pre-production version of registry] and discussed linking to Connectathon results | * Reviewed [http://sumo-test.irisa.fr:8080/ProductRegistry-dev/home.seam current pre-production version of registry] and discussed linking to Connectathon results | ||
− | ** Link from Registry to Results page will be on Vendor/Profile/Actor basis (ie, row-by-row) | + | ** Link from Registry to Connectathon Results page will be on Vendor/Profile/Actor basis (ie, row-by-row) |
− | ** Registry and Connectathon results may be merged into a single database to make queries more efficient | + | ** Registry and [http://sumo.irisa.fr/con_result/index.php Connectathon results browser] may be merged into a single database to make queries more efficient |
* '''Action Item: Eric and Chris''' will work on assigning the Registry an ihe.net url | * '''Action Item: Eric and Chris''' will work on assigning the Registry an ihe.net url | ||
* '''Action Item: Eric and Jean-Renan''' will work on putting registry database into production and beginning to populate it with data | * '''Action Item: Eric and Jean-Renan''' will work on putting registry database into production and beginning to populate it with data |
Latest revision as of 12:53, 26 January 2009
Participants
- Jean-Renan Chatel - INRIA
- Geert Claeys - Agfa
- Cor Loef - Philips
- Steve Moore - MIR
- Eric Poiseau - INRIA
- Chris Carr - RSNA
Minutes
1. Connectathon Results Proposal - Charles Parisot/Geert Claeys
- Geert presented revised version of document
- Focuses more narrowly on distinguishing results associated with Trial Implementation profiles
- Eric P will add some text describing linking to product registry and briefly describing capabilities of product registry (browseable, sortable, etc.)
- Action Item: Chris will make final refinements to document and present to Board as informative discussion item
2. Connectathon Quality Control Rules - Cor Loef/Chris Carr
- Reviewed the document Cor produced to describe Connectathon process and notes Chris added about transforming it into a baseline set of quality criteria
- Action Item: Chris will mail annotated draft to group and prepare a new draft for review on next teleconference
3. Committee Charter - Chris Carr
- Deferred to next call
4. Licensing Terms - Chris Carr/Steve Moore
- Deferred to next call
5. Product Registry - Eric Poiseau
- Reviewed current pre-production version of registry and discussed linking to Connectathon results
- Link from Registry to Connectathon Results page will be on Vendor/Profile/Actor basis (ie, row-by-row)
- Registry and Connectathon results browser may be merged into a single database to make queries more efficient
- Action Item: Eric and Chris will work on assigning the Registry an ihe.net url
- Action Item: Eric and Jean-Renan will work on putting registry database into production and beginning to populate it with data
6. Cypress Project - Chris Carr/Steve Moore
- Deferred to next call
7. Next Call: Skip next Monday and resume on normal schedule on Monday, Feb. 16