IHE Testing and Tools Committee 2010-06-07 Teleconference Minutes
Jump to navigation
Jump to search
Attendees
- Karima Bourquard
- Todd Cooper
- Bruce Curran, RO
- Didi Davis
- Nichole Drye-Mayo
- Cor Loef
- Bill Majurski
- Steve Moore
- Charles Parisot
- Eric Poiseau
Minutes
1. Product Registry
- Eric Poiseau took the group through the new instructions page of the Registry and submission process
- Instructions page has been added to describe submission process
- Removed advance checking requirement from publication process; statements are now published and confirmed after the fact
- Content and usage statistics (number of entries, number of searches) will be added to the main page in near future
- Currently there is not shared single sign-on with Gazelle; will be added at some in future
- Companies are encouraged to add integration statements
- Action Item: Committee members to go through submission process and add comments to issue tracker; test submission url is http://sumo-test.irisa.fr, add to page as "sandbox"
- Action Item: Chris Carr to add announcement about opening of Registry in IHE News blast
2. Gazelle Development
- JIRA bug tracking and release management tool at gazelle.ihe.net is used to track development efforts
- Gazelle Master Model: first version released last week: module with test data will be entered; all instances of Gazelle (for specific testing events) will be "slaves" of this master model
- January NA event will be run as a separate instance and updates will be added after the fact
- External Validation Services, Demographic Service and Simulator modules updated; PDS Simulator completed, XDR and XCP are next profile simulators being developed
- Entering test assertions; so far no GUI for entering them; Committees need to be instructed to identify and specifically format test assertions; each test will be associated with one or more specific assertions in Technical Frameworks; initial testing of BPEL expression of assertions will take place in Pisa next year
- Domain Coordination Committee asked to designate profiles (perhaps two or three) to develop test assertions; need to compare processes and try to establish common practices across domains
- DICOM test objects are available in centralized archive; Eric plans to make available to Connectathon participants
- Bill Majurski working on toolkit to validate any messages and elements of messages in XDS, XDS, XDS, XCA (and Metadata Update); working bottom up on detailed validation; need to find point of convergence with Gazelle test assertions
- NIST looking for testing use case that requires them to validate content of documents in PCC Profiles with ITI transactions
3. Manager Training Event
- Sept. 14-16 in Oak Brook, IL; Aug. 1 registration deadline date
4. Next Meeting: June 21, 10-11 CT
- Review tasks needed to support NA Connectathon in Jan. 2011
- Regional Deployment Projects: NHIN Direct (Didi), EPSOS Projectathon (Karima)
- XD* Toolkit