Difference between revisions of "PCD Detailed Profile Proposal Cycle6 LTS"
Jump to navigation
Jump to search
Stevemerritt (talk | contribs) |
Stevemerritt (talk | contribs) |
||
Line 56: | Line 56: | ||
===Impact on existing integration profiles=== | ===Impact on existing integration profiles=== | ||
− | + | * Location information could be included in other profiles or used to extend other profiles. For example knowing the location of an alarm could be beneficial. | |
===New integration profiles needed=== | ===New integration profiles needed=== |
Revision as of 10:19, 22 December 2010
Proposed Work Item: Location Tracking Services [LTS]
- Proposal Editor: Steve Merritt / Ken Fuchs / Ben Mannisto
- Editor: TBA
- Date: N/A (Wiki keeps history)
- Version: N/A (Wiki keeps history)
- Domain: Patient Care Device
Summary
The Problem
Key Use Case(s)
Standards & Systems
- Examples listed here for reference only
- ISO/IEEE 11073-10101 Health informatics — Point-of-care medical device communication — Part 10101: Nomenclature, First edition, 2004-12-15. ISO and IEEE, 2004.
- The ‘Unified Code for Units of Measure (UCUM).
- Health Level 7, version X.X
- There was some work done in HL7 v3.
- Adaptation of the HL7 v2 OBX messaging structure could be used.
Technical Approach
Existing actors
New actors
Some new actors may include:
-
- Data Types to be stored include:
- Data Types to be stored include:
-
- Query types may include:
- Query types may include:
Existing transactions
New transactions (standards used)
Impact on existing integration profiles
- Location information could be included in other profiles or used to extend other profiles. For example knowing the location of an alarm could be beneficial.
New integration profiles needed
Support & Resources
The LTS has received support from:
- AIMS
- Baystate Health
- Mindray
- IBM
- Capsule
- Emergin
- SIS
- Ekahau
- Renovo
- VA
- Cisco
- Aeroscout
- Philips
Risks
Technical risks include:
- Complexity of
- Lack of participation
Political risks include:
- ???
Open Issues
Tech Cmte Evaluation
<The technical committee will use this area to record details of the effort estimation, etc.>
Effort Evaluation (as a % of Tech Cmte Bandwidth):
- Typical for new profile development
Responses to Issues:
- See italics in Risk and Open Issue sections
Candidate Editor:
- TBA