Difference between revisions of "IHE Testing and Tools Committee 2010-04-26 Teleconference Minutes"
Jump to navigation
Jump to search
Chrisdcarr (talk | contribs) (New page: ==Attendees== ==Minutes== 1) Training Events 2) Gazelle Status 3) Development Tasks Testing and Tools Committee Category: Minutes) |
Chrisdcarr (talk | contribs) |
||
Line 4: | Line 4: | ||
==Minutes== | ==Minutes== | ||
− | 1) | + | 1) IHE Korea Connectathon |
− | 2) Gazelle Status | + | 2) Connectathon Manager Training Events |
+ | |||
+ | * June 6-9 Training event in Paris | ||
+ | :* Registration system set up | ||
+ | ::* '''<Action Item>''': Chris Carr to work with Peter Kuenecke to develop Web page and annct to ihenews | ||
+ | |||
+ | * Oct. training event in US | ||
+ | :* Dates: Sept. 29-Oct. 1 | ||
+ | ::* '''<Action Item>''': Chris Carr will confirm availability of RSNA HQ facility | ||
+ | |||
+ | 3) Gazelle Status | ||
+ | |||
+ | 4) IHE Europe Connectathon Outcomes | ||
− | |||
Revision as of 09:54, 26 April 2010
Attendees
Minutes
1) IHE Korea Connectathon
2) Connectathon Manager Training Events
- June 6-9 Training event in Paris
- Registration system set up
- <Action Item>: Chris Carr to work with Peter Kuenecke to develop Web page and annct to ihenews
- Oct. training event in US
- Dates: Sept. 29-Oct. 1
- <Action Item>: Chris Carr will confirm availability of RSNA HQ facility
3) Gazelle Status
4) IHE Europe Connectathon Outcomes