PCD Pump 2025-07-14 Teams

From IHE Wiki
Revision as of 18:11, 17 July 2025 by Kelliason (talk | contribs) (Discussion Notes)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

(Infusion Pump Main Page)


Meeting Purpose

IHE PCD Infusion Pump Working Group discussions.

WebEx Information

Topic: IHE PCD Infusion Pump WG

Date: Monday, July 14, 2025

Time: 12:00, Eastern Time (GMT -05:00, New York)

Duration: 60 Minutes


Note: Specific web & phone information will be provided via e-mail to group members.

Contact Kurt Elliason for more information.

Proposed Agenda

1. Review today's Agenda
2. Review 2025-06-28 Pump Teams Session
3a. Rack/Stack CP-DEV-020 draft
3b. New terms - drug not in library and completion mode for switching sources
3c. pcd-15 containment for pumps
4a. PCD-03 Error codes
4b. White paper updates Device Identification June draft
4c. PCD-03 Clinician Bolus (ORC-1 = CH)
5. Review PCD Device Infusion Pump Action Items
6. New Business / Next Meetings

Attachments / Materials

  • <add attachments links here>

Discussion Notes

Chair/Host: Kurt Elliason (ICU Medical)
Participants: Al Engelbert (BBraun), Amy Rowe (BBraun), Brian Witkowski (Baxter), Evan O'Grady(Fresenius-Kabi), Michael Workman (BD), Nicolas Crouzier (NIST), Paul Schluter (Paul Schluter Consulting), Shantanu Chawla (BD), Silas Morris (Epic), Tom Kowalczyk (BBraun)



NOTE: Action Item Review updates have been posted directly to the Infusion Pump Action Items wiki page


Item Topic Discussion
1 Agenda & Discussion Notes Review
- Chair
Status/Discussion:


Decisions/Issues:


Action(s):

2 Agenda topics
- tbd
Status/Discussion:
3a. Rack/Stack
CP-DEV-020 - not ready for ballot, checked with Michael F. & Nicolas C. about NIST Connectathon tool error when using 2^^7.
OBX-5 is a repeatable element so ~ are allowed here.
And since you are using ST, a primitive, ^ will not make sense and are not allowed.
Should we use a different data type instead of ST. or use ST and not use empty strings with ~ (2,NA,NA,7) is 2~NA~NA~7 instead of 2^^^7
3b. New terms
Proposed new term for PCD-01/-10: MDCX_DRUG_IS_IN_LIBRARY
· Boolean value indicating if the currently programmed drug is in the drug library
· If not present, assumed to be unknown
· Rationale: Manually programmed drugs will always be in the drug library, but auto-programmed drugs may not be if they are experimental or the drug library has not been updated to include the new drug(s). It is important to know if drugs outside of the library are being administered, since those drugs will not have limits enforced. In addition, reporting if the drug is in the drug library will allow the EMR to monitor alignment between their formulary and the drug library.

·

Proposed new value for MDC_PUMP_PROGRAM_COMPLETION_MODE: pump-program-completion-mode-switch-source
· Description/Definition of MDC_PUMP_PROGRAM_COMPLETION_MODE: Programmed operation of the pump when a delivery completes (e.g., KVO).
· Currently defined set of values:
o pump-program-completion-mode-stop
o pump-program-completion-mode-kvo
o pump-program-completion-mode-continue
· None of the currently defined values address the case where a pump that is running a secondary will automatically switch to the primary when the secondary is complete
· Note: the set of values for MDC_PUMP_NOT_DELIVERING_REASON includes pump-stopped-switching-source
3c. PCD-15 containment for pumps
MDC_CLINICAL_USE_STATE Clinical use state could use more detail. i.e. Infusion pump is in use if it is programmed and ready to infuse. or the more generic case, device is in use if it is programmed/configured and ready to be used with a patient.
4a. PCD-03 Error codes
No updates
4b. White paper updates
Ready to review with DEV Technical Committee
4c. PCD-03 Clinician Bolus (ORC-1 = CH)
Discussed possible option of having multiple RXG segments like a multistep program for Loading Dose, Continuous, PCA etc but without steps. Add to agenda to review next meeting.


Decisions/Issues:


Action(s):


3 TBD
- tbd
Status/Discussion:


Decisions/Issues:


Action(s):


4 Next Meeting
- Chair
Status/Discussion:

Decisions/Issues:

  • Topics will include ...

Action(s):


Next Meeting

NOTE: Next Meeting will be held during the regularly scheduled time: 12:00 (Eastern) on July 28 (60 minutes)


(Reviewed & approved by PCD Infusion Pump WG on <TBD>


PCD Home