Card Tech Minutes 2012.08.08: Difference between revisions

From IHE Wiki
Jump to navigation Jump to search
Created page with "=== Attendees === * Anthony Scinicariello - St. Jude Medical * Barry Brown - Mortara * Bryan Jennings - Medical Micrographics * Chris Melo - Philips * Harry Solomon - GE * Paul ..."
 
Line 15: Line 15:


* Review of EP Analysis by Anthony and Chris
* Review of EP Analysis by Anthony and Chris
** Goal is to come up with a plan on how to proceed with the EP supplement
** Review is based on existing supplement, key data elements and report samples
** Review is based on existing supplement, key data elements and report samples
** Approach was to structurally map key data elements to content modules of CRC
** Approach was to structurally map key data elements to content modules of CRC
Line 23: Line 24:
***# EP Study
***# EP Study
***# Device implant, explant, replacement
***# Device implant, explant, replacement
***# Lead revision, extraction
***# Ablation
***# Cardioversion
**** Device Implant and Ablation seem to be the most commonly performed procedures
*** During an ablation procedure the steps performed may change based on observations during procedure
*** Granularity of procedure  vs procedure activity procedure
*** Modeling of ICD devices and leads. Are leads separate devices
*** Support for different graphic types like ECG or 3D anatomic maps
** Options to develop a profile
*** Minimal narative option (procedure description and results will be narrative text only)
*** Coded procedure results and findings, but narrative procedure description
*** Completly coded
** Decision
*** Since the narative options is the least interoperable solution the committee unanimously voted to submit a new profile proposal for the next cycle based on the information from this analysis
** Action Items
** Antje to provide templates for short and detailed proposal for Anthony/Chris
** Chris to upload analysis results to FTP server in current year directory
** Anthony and Chris to submit a detailed proposal for a 2012/2013 worktitem
** Paul Dow to send out Call for work item proposals

Revision as of 01:47, 9 August 2012

Attendees

  • Anthony Scinicariello - St. Jude Medical
  • Barry Brown - Mortara
  • Bryan Jennings - Medical Micrographics
  • Chris Melo - Philips
  • Harry Solomon - GE
  • Paul Dow - ACC
  • Paul Seifert - Agfa
  • Rich Fronek - Cardiac Science
  • Tom Dolan - Philips
  • Antje Schroeder - Siemens

Meeting Notes

  • Review of EP Analysis by Anthony and Chris
    • Goal is to come up with a plan on how to proceed with the EP supplement
    • Review is based on existing supplement, key data elements and report samples
    • Approach was to structurally map key data elements to content modules of CRC
    • Three areas of structural changes needed
      • Needs to be filled in
    • Modelling needs to take into account the following aspects:
      • different procedure types
        1. EP Study
        2. Device implant, explant, replacement
        3. Lead revision, extraction
        4. Ablation
        5. Cardioversion
        • Device Implant and Ablation seem to be the most commonly performed procedures
      • During an ablation procedure the steps performed may change based on observations during procedure
      • Granularity of procedure vs procedure activity procedure
      • Modeling of ICD devices and leads. Are leads separate devices
      • Support for different graphic types like ECG or 3D anatomic maps
    • Options to develop a profile
      • Minimal narative option (procedure description and results will be narrative text only)
      • Coded procedure results and findings, but narrative procedure description
      • Completly coded
    • Decision
      • Since the narative options is the least interoperable solution the committee unanimously voted to submit a new profile proposal for the next cycle based on the information from this analysis
    • Action Items
    • Antje to provide templates for short and detailed proposal for Anthony/Chris
    • Chris to upload analysis results to FTP server in current year directory
    • Anthony and Chris to submit a detailed proposal for a 2012/2013 worktitem
    • Paul Dow to send out Call for work item proposals