Checkpoint Assessment: Difference between revisions

From IHE Wiki
Jump to navigation Jump to search
Created page with "===AISCap Kickoff Assessment === * Profile Name: AISPro ** Describe gaps in Use Case coverage *** Handling of additional information use cases (e.g. prior studies or prior AI results) ** Review ALL "uncertainty points" in the evaluation. Is there a resolution plan for each? ** Do the effort points in the evaluation still seem right? ** Did the Breakdown of Tasks accurately reflect the work? What extra tasks arose? *** Due to decision to use Questionaire and Questionai..."
 
Line 1: Line 1:
===AISCap Kickoff Assessment ===
===AISPro Kickoff Assessment ===





Revision as of 11:50, 12 November 2026

AISPro Kickoff Assessment

  • Profile Name: AISPro
    • Describe gaps in Use Case coverage
      • Handling of additional information use cases (e.g. prior studies or prior AI results)
    • Review ALL "uncertainty points" in the evaluation. Is there a resolution plan for each?
    • Do the effort points in the evaluation still seem right?
    • Did the Breakdown of Tasks accurately reflect the work? What extra tasks arose?
      • Due to decision to use Questionaire and QuestionaireResponse
    • Describe unresolved technical issues/tasks
      • handling of ultracomplex input requirements
    • Describe potential practical issues
    • Review the open issue list. Does it feel complete
    • Which open issues feel most risky; what other risks exist?
    • How is the work fitting in the allocated bandwidth? (Time to spare? Just right? Things were left undone?)
    • How does the scope feel? (Room to expand? Just right? Pretty ambitious?)
    • If you had to reduce scope, what would you drop?
    • Have the promised resources manifested?
    • What tasks would benefit from additional expertise?
    • What implementers are engaged for each actor? Record how many.
    • Was the profile where it needed to be at the start of the Kickoff meeting (See "Kickoff Meeting" above), if not what was the gap
    • Was the profile where it needed to be at the end of the Kickoff meeting, if not what was the gap
    • How many tcons would you like between now and the PC Prep Meeting?

It will be the responsibility of the Profile Editor to lead resolution of these issues before the Public Comment preparation meeting.

Resolution may involve:

  • Scheduling additional Tcons to complete the technical discussion
  • Reducing the scope of the profile to fit within the allocated % bandwidth
  • Including open issues in the PC Profile draft for wider comment (generally for issues that would not radically change the profile)
  • Changing the workitem from a profile to a whitepaper to explore the solution space if it is not ready for profiling.
    • Hopefully the whitepaper work is solid enough that it will be ready to profile next year and the same proposal will be selected again
  • Dismissing the workitem as not ready for profiling in the forseeable future.
    • This likely means there was something the TC should have caught during evaluation