Checkpoint Assessment: Difference between revisions
Jump to navigation
Jump to search
Aschroeder (talk | contribs) Created page with "===AISCap Kickoff Assessment === * Profile Name: AISPro ** Describe gaps in Use Case coverage *** Handling of additional information use cases (e.g. prior studies or prior AI results) ** Review ALL "uncertainty points" in the evaluation. Is there a resolution plan for each? ** Do the effort points in the evaluation still seem right? ** Did the Breakdown of Tasks accurately reflect the work? What extra tasks arose? *** Due to decision to use Questionaire and Questionai..." |
Aschroeder (talk | contribs) |
||
| Line 1: | Line 1: | ||
=== | ===AISPro Kickoff Assessment === | ||
Revision as of 11:50, 12 November 2026
AISPro Kickoff Assessment
- Profile Name: AISPro
- Describe gaps in Use Case coverage
- Handling of additional information use cases (e.g. prior studies or prior AI results)
- Review ALL "uncertainty points" in the evaluation. Is there a resolution plan for each?
- Do the effort points in the evaluation still seem right?
- Did the Breakdown of Tasks accurately reflect the work? What extra tasks arose?
- Due to decision to use Questionaire and QuestionaireResponse
- Describe unresolved technical issues/tasks
- handling of ultracomplex input requirements
- Describe potential practical issues
- Review the open issue list. Does it feel complete
- Which open issues feel most risky; what other risks exist?
- How is the work fitting in the allocated bandwidth? (Time to spare? Just right? Things were left undone?)
- How does the scope feel? (Room to expand? Just right? Pretty ambitious?)
- If you had to reduce scope, what would you drop?
- Have the promised resources manifested?
- What tasks would benefit from additional expertise?
- What implementers are engaged for each actor? Record how many.
- Was the profile where it needed to be at the start of the Kickoff meeting (See "Kickoff Meeting" above), if not what was the gap
- Was the profile where it needed to be at the end of the Kickoff meeting, if not what was the gap
- How many tcons would you like between now and the PC Prep Meeting?
- Describe gaps in Use Case coverage
It will be the responsibility of the Profile Editor to lead resolution of these issues before the Public Comment preparation meeting.
Resolution may involve:
- Scheduling additional Tcons to complete the technical discussion
- Reducing the scope of the profile to fit within the allocated % bandwidth
- Including open issues in the PC Profile draft for wider comment (generally for issues that would not radically change the profile)
- Changing the workitem from a profile to a whitepaper to explore the solution space if it is not ready for profiling.
- Hopefully the whitepaper work is solid enough that it will be ready to profile next year and the same proposal will be selected again
- Dismissing the workitem as not ready for profiling in the forseeable future.
- This likely means there was something the TC should have caught during evaluation