Line 43: Line 43:
* '''Clarify procedural documentation - Steve to develop proposal with Rob and Jason'''
* '''Clarify procedural documentation - Steve to develop proposal with Rob and Jason'''


Does it feel we've met all the use cases 'There was one comment e:a missing non-POCUS ultrasound case. The use case was not added, but this was addressed in a new concept section.'''
Does it feel we've met all the use cases '''There was one comment re: removing the existing POCUS use case. The use case was not added, but this was addressed in a new concept section.'''


Did the promised resources manifest '''Yes, although we did not receive PC from clinical organizations.'''
Did the promised resources manifest '''Yes, although we did not receive PC from clinical organizations.'''

Revision as of 15:11, 3 April 2025

Annex: TI-Prep Closing Assessment

Did we line-by-line the entire document No, additional t-cons are needed. See below

How ready is it to go out for TI: Almost: All public comment items were addressed, need to update profile based on Technical Committee discussions.

How did the work fit in the allocated bandwidth? Not too bad, a few things were left undone.

Review the evaluation. Which complexity/uncertainty/effort points missed the mark? Or alternatively, estimate how many points you went over and assign the overage effort/complexity/uncertainty to the appropriate points.

Are all the open issues closed? Did not complete the review of 1/2 of the open issues

What significant debates in TI-prep were not anticipated in the Kickoff or PC-Prep

  • The identified uncertainty items were appropriate, but they were revisited in each phase (Planning, pre-PC prep, PC-Prep, and TI-Prep).

Did the Breakdown of Tasks accurately reflect the work? What extra tasks arose?

  • Re-configured EBIW to add a Lightweight Modality option to resolve a packaging issue. This was not anticipated.
  • Did not anticipate the comments that stemmed from pre-existing EBIW content, which required committee time to address.
Comment Breakdown (rough) Count
Trivial (fixed before meeting) 24
Existing EBIW 10
POCUS Manager (uncertainty) 6
Non-trivial (needed discussion) 5
Packaging (uncertainty) 5
Report transaction (uncertainty) 4
Clinical 3
Nofix 1

What residual risks are worth noting

  • Revisiting prior decisions/existing EBIW content during line by line review
  • Clarify procedural documentation - Steve to develop proposal with Rob and Jason

Does it feel we've met all the use cases There was one comment re: removing the existing POCUS use case. The use case was not added, but this was addressed in a new concept section.

Did the promised resources manifest Yes, although we did not receive PC from clinical organizations.

What vendors are engaged (for each actor)

  • Modality: GEHC, Canon, Philips, Siemens
  • POCUS Manager: GEHC, (Butterfly, SonoSite, Fuji are part of ACEP Workgroup)
  • Encounter Manager: GEHC
  • Results Aggregator: (Epic and Cerner are part of ACEP Workgroup)

Who should specifically be targeted for TI notification (implementors & advocates)

  • HIMMS/SIIM AIUM
  • American College of Emergency Physicians (ACEP)
  • Society of Clinical Ultrasound Fellows (SCUF)
  • US Veterans Administration
  • Japan Society of Point-of-Care Ultrasound
  • European Society of Paediatric and Neonatal Intensive Care – POCUS Working Group
  • European Federation of Societies for Ultrasound in Medicine and Biology
  • World Organization of Family Doctors – POCUS Initiatives
  • European Federation of Internal Medicine (EFIM) – Ultrasound Working Group

When will we have sample data/objects After TI

Was the profile where it needed to be at the start of the TI meeting, if not what was the gap

  • Addressed 24 trivial PC items before meeting.
  • RAD-132 included gaps some of which could have been addressed prior to the TI meeting (Note: we also re-visited RAD-132 decisions made in PC Prep).
  • Some of the track changes in the official word document were accepted, which made change tracking difficult.
  • TODOs from PC checkpoint:

Was the profile where it needed to be at the end of the TI meeting, if not what was the gap

  • Not enough time to finish open items and perform line by line review