POCUS PC Checkpoint Assessment: Difference between revisions

From IHE Wiki
Jump to navigation Jump to search
Created page with "===Annex: PC-Prep Closing Assessment=== Paste the following checklist items into the minutes; discuss and record findings for each * Profile Name: EBIW POCUS Extensions * Did..."
 
Line 3: Line 3:


* Profile Name: EBIW POCUS Extensions
* Profile Name: EBIW POCUS Extensions
* Did we line-by-line the entire document: No
* Did we line-by-line the entire document: '''No'''
**Need to line-by-line
**Need to line-by-line
***Vol1: 2 concepts (Billing, Intermittent Connected Modalities), 3 more use cases and Data model
***Vol1: 2 concepts (Billing, Intermittent Connected Modalities), 3 more use cases and Data model

Revision as of 15:07, 30 January 2025

Annex: PC-Prep Closing Assessment

Paste the following checklist items into the minutes; discuss and record findings for each

  • Profile Name: EBIW POCUS Extensions
  • Did we line-by-line the entire document: No
    • Need to line-by-line
      • Vol1: 2 concepts (Billing, Intermittent Connected Modalities), 3 more use cases and Data model
      • Vol2: RAD-132
  • How ready is it to go out for PC: Completely, Almost, Soonish, Hmmm: Almost
  • Which open issues are risky, and why
  • Are all open issues phrased to solicit the needed information to close them?
  • Which use cases need more input
  • Which issues from the Kickoff Closing Assessment are still unresolved
  • What significant debates in PC-prep were not anticipated in the Kickoff
  • Review ALL "uncertainty points" in the evaluation. Are all now resolved?
  • Review ALL "complexity points" in the evaluation. Did each get appropriate text coverage/resolution?
  • Review the "effort points" in the evaluation. Still seems right? Need more?
  • How does the scope feel in terms of being a useful chunk of work? (Needs more? Just right? More than enough?)
  • How is the work fitting in the allocated bandwidth? (Time to spare? Just right? Things were left undone?)
  • Did the Breakdown of Tasks accurately reflect the work? What extra tasks arose?
  • Looking forward, if you had to reduce scope to hit TI, what would you drop
  • Have the promised resources manifested
  • What vendors are engaged (for each actor)
  • When will we have sample data/objects
  • Who should specifically be targeted for Public Comment feedback
  • Was the profile where it needed to be at the start of the PC meeting (See "PC Prep Meeting" above), if not what was the gap
  • Was the profile where it needed to be at the end of the PC meeting, if not what was the gap
  • How many tcons would you like between now and PC Publication
  • Do you need any tcons before TI Prep Meeting