Rad Tech Minutes 2015-10-08: Difference between revisions
Jump to navigation
Jump to search
| (4 intermediate revisions by the same user not shown) | |||
| Line 5: | Line 5: | ||
**Lynn Felhofer (Technical Project Manager) | **Lynn Felhofer (Technical Project Manager) | ||
**Antje Schroeder (Siemens) | **Antje Schroeder (Siemens) | ||
**Michael Bohl (Radiology Group Imaging) | |||
**Elliot Silver (McKesson) | |||
**Chris Lindop (GE) | |||
==Minutes== | ==Minutes== | ||
*Finalize RRR-WF for Trial Implementation | |||
**Kevin motioned to approve publication of RRR-WF for Trial Implementation including the 4 substantive changes discussed. Kinson seconded. | |||
***3 favor | |||
***2 abstention | |||
Latest revision as of 12:51, 8 October 2015
Attendees
- Radiology Technical Committee Roster
- Kinson Ho (Agfa)
- Kevin O'Donnell (Toshiba)
- Lynn Felhofer (Technical Project Manager)
- Antje Schroeder (Siemens)
- Michael Bohl (Radiology Group Imaging)
- Elliot Silver (McKesson)
- Chris Lindop (GE)
Minutes
- Finalize RRR-WF for Trial Implementation
- Kevin motioned to approve publication of RRR-WF for Trial Implementation including the 4 substantive changes discussed. Kinson seconded.
- 3 favor
- 2 abstention
- Kevin motioned to approve publication of RRR-WF for Trial Implementation including the 4 substantive changes discussed. Kinson seconded.