Rad Tech Minutes 2015-05-29: Difference between revisions
Jump to navigation
Jump to search
| (6 intermediate revisions by the same user not shown) | |||
| Line 4: | Line 4: | ||
*Chris Lindop (GE Healthcare) | *Chris Lindop (GE Healthcare) | ||
* | *Damien Lerate (SuperSonic Imagine) | ||
*Elliot Silver (McKesson) | |||
*Kevin O'Donnell (Toshiba) | *Kevin O'Donnell (Toshiba) | ||
*Kinson Ho (Agfa) | *Kinson Ho (Agfa) | ||
*Lynn Felhofer (tech project manager) | |||
*Mike Bohl (Radiology Group) | |||
*Tom Smith (Triad Radiology Associates) | *Tom Smith (Triad Radiology Associates) | ||
| Line 15: | Line 21: | ||
== Minutes == | == Minutes == | ||
Please see [https://docs.google.com/spreadsheets/d/1TmSwnn4AIiXqFLc_AtzP0dNd9LUWnA-ZcCjBMKpLzp4/edit#gid=0 IHE Radiology CP Tracking Spreadsheet] for full list of CP status | |||
I. Reviewing newly submitted CPs | |||
:*CP-RAD-324 | |||
:**Chris L./Elliot will attempt to repackage as a broader proposal | |||
:*CP-RAD-325 | |||
:*CP-RAD-326 | |||
:*CP-RAD-327 | |||
::*CDS-OAT profile may depend on this CP completion | |||
:*CP-RAD-328 | |||
:*CP-RAD-329 | |||
:*CP-RAD-330 - rejected | |||
:*CP-RAD-331 | |||
:*CP-RAD-332 | |||
II. Action Items | |||
#Kevin uploaded assigned CPs to FTP site | |||
#Jamie to set up poll to review assigned CPs to approve for ballot | |||
Latest revision as of 11:35, 29 May 2015
Participants
- Chris Lindop (GE Healthcare)
- Damien Lerate (SuperSonic Imagine)
- Elliot Silver (McKesson)
- Kevin O'Donnell (Toshiba)
- Kinson Ho (Agfa)
- Lynn Felhofer (tech project manager)
- Mike Bohl (Radiology Group)
- Tom Smith (Triad Radiology Associates)
- RSNA Staff: Jamie Kontos
Minutes
Please see IHE Radiology CP Tracking Spreadsheet for full list of CP status
I. Reviewing newly submitted CPs
- CP-RAD-324
- Chris L./Elliot will attempt to repackage as a broader proposal
- CP-RAD-325
- CP-RAD-326
- CP-RAD-327
- CDS-OAT profile may depend on this CP completion
- CP-RAD-328
- CP-RAD-329
- CP-RAD-330 - rejected
- CP-RAD-331
- CP-RAD-332
- CP-RAD-324
II. Action Items
- Kevin uploaded assigned CPs to FTP site
- Jamie to set up poll to review assigned CPs to approve for ballot