PCCTech Minutes 2013 04 28: Difference between revisions

From IHE Wiki
Jump to navigation Jump to search
Ejones (talk | contribs)
No edit summary
Ejones (talk | contribs)
Blanked the page
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
==Tuesday April 28, 2015==
==Attendees==
In Person: Anne Diamond, Steve Moore, Mike Bohls, Emma Jones, George Cole, Denise Downing, Tone Southerland, Keith Boone


On Phone:Brian Reinhold, Pieter Devolder, Kevin McDermott
==GAO==
*Question from Pieter about use case from Belgium - answer provided
*Keith presented changes to profile
**Naming the order - review vs authorize - leaving as open issue for comment
**Decision Support Service - tweaked the definition. Will need a CP for the TF to add the updated definition (won't need to change the indiv profiles)
**Out of Scope - when the same authorization is provided to multiple entities for the same service
==RPM==
*Brian presented changes to the profile
**Updated device observation consumer per input yesterday
**Device observation reporter updated
**Suggestion to use the PCC-1 transaction rather than having section 3.ZA Share Content Transaction - suggest putting the description in process flow section (volume 1). Can update the transaction table in volume 2
**Discussion about the need for the device observation source, reporter and content creator grouping as current diagram. Suggest an alternative diagram
==CP Process==
* Need to initiate the new CP process for managing CPs (based on DCC guidelines - it includes a google spreadsheet) - Denise will review and update
* Need to follow the current CP ballot process for 2015 completed CPs - allow 30 days to complete voting? Need to confirm timeframe with Nancy.
**If ballot completed by June 15, Steve will do the editorial work
*Need to clean up the completed list - confirm the completed ones have been incorporated. If incorporated, move to the incorporated folder- Denise will check.
**Add a new folder (and list) for 'completed, passed ballot' (awaiting to be incorporated)
==QRPH/PCC Joint==
*CP 0178 will be updated in 2015 updates to the TF. Steve Moore will do the updates.
*HSI update
**HL7 CCDA OIDs Harominzation - meeting Thurs Q3 and Q4 of the HSI meeting at HL7 Paris.
**Co-Chair elections
*BPMN
**Workflow repository - QRPH RPE Profile has a workflow repository. The question is how will this be handled in the white paper.
**Use of workflow repository will be useful from an international repository because of the changes that are made to care guidelines.
*EHDI
**Move to QRPH for ownership - QRPH will be responsible for all the updates.
==RECON on FHIR==

Latest revision as of 09:08, 29 April 2015