Difference between revisions of "Pharmacy Past Development Cycles"
(7 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
''Dates and times are Central European Time (Brussels).'' | ''Dates and times are Central European Time (Brussels).'' | ||
+ | ==Pharmacy 2017-2018 Development Cycle Milestones== | ||
+ | |||
+ | |||
+ | According to [http://wiki.ihe.net/index.php?title=Domain_Milestone_Dates IHE Pharmacy Domain Milestone Dates] | ||
+ | |||
+ | ''Dates and times are Central European Time (CET : Paris, Brussels, Amsterdam, Vienna).'' | ||
+ | |||
+ | {| style="width:100%" border="1" cellpadding="3" | ||
+ | ! Timeframe | ||
+ | ! Activity | ||
+ | ! Scheduled | ||
+ | ! Location | ||
+ | |- | ||
+ | | colspan="4" align="center" style="background:#abcdef" | '''September 1st, 2017: Start of season 2017/2018''' | ||
+ | |- | ||
+ | | colspan="4" align="center" style="background:#dddddd" | '''2017''' | ||
+ | |- | ||
+ | |||
+ | | colspan="4" align="center" style="background:#dddddd" | '''2018''' | ||
+ | |- | ||
+ | | January | ||
+ | | Test implementations at Connectathon (North America) | ||
+ | | January 15-19, 2018 | ||
+ | | Cleveland, Ohio, USA | ||
+ | |- | ||
+ | | February | ||
+ | | <span style="color: red; ">Second F2F Meeting</span> | ||
+ | | February 12-13th, 2018 | ||
+ | | Oslo, Norway | ||
+ | |- | ||
+ | | April | ||
+ | | Test implementations at Connectathon (Europe) | ||
+ | | April 16-20, 2018 | ||
+ | | The Hague, NL | ||
+ | |- | ||
+ | | May | ||
+ | | '''Publish work-items for Public Comment''' | ||
+ | | April 30th, 2018 | ||
+ | | | ||
+ | |- | ||
+ | | May | ||
+ | | '''Public Comment - Deadline''' | ||
+ | | May 230h, 2018 | ||
+ | | | ||
+ | |- | ||
+ | | June | ||
+ | | <span style="color: red; ">F2F meeting : Final review of NWIs, approved for ballot</span> | ||
+ | | June 25-26th, 2018 | ||
+ | | Vienna | ||
+ | |- | ||
+ | | June | ||
+ | | Publication of CPs - released for Ballot | ||
+ | | June 29th, 2018 | ||
+ | | www.ihe.net | ||
+ | |- | ||
+ | | July | ||
+ | | '''Ballot Start''' | ||
+ | | July 2nd, 2018 | ||
+ | | | ||
+ | |- | ||
+ | | July | ||
+ | | <span style="color: blue; ">IHE Pharmacy Webinar 2018</span> | ||
+ | | TBD | ||
+ | | WebEx Webinar | ||
+ | |- | ||
+ | | July | ||
+ | | <span style="color: green; ">Call for Vendor (PC & TC) co-chairs</span> | ||
+ | | July 6th, 2018 | ||
+ | | | ||
+ | |- | ||
+ | | August | ||
+ | | <span style="color: green; ">Vendor (PC & TC) co-chairs election</span> | ||
+ | | August 3rd, 2018 | ||
+ | | | ||
+ | |- | ||
+ | | August | ||
+ | | '''Ballot - Deadline''' | ||
+ | | August 6th, 2018 | ||
+ | | | ||
+ | |- | ||
+ | | August | ||
+ | | Publication of Trial Implementation Supplements | ||
+ | | August 20th, 2018 | ||
+ | | www.ihe.net | ||
+ | |- | ||
+ | | August | ||
+ | | <span style="color: green; ">Vendor (PC & TC) co-chairs election results</span> | ||
+ | | August 31th, 2018 | ||
+ | | | ||
+ | |- | ||
+ | | August | ||
+ | | Technical Frameworks Released | ||
+ | | August 31th, 2018 | ||
+ | | | ||
+ | |} | ||
+ | |||
+ | ==Pharmacy 2016-2017 Development Cycle Milestones== | ||
+ | |||
+ | ''Dates and times are Central European Time (CET : Paris, Brussels, Amsterdam, Vienna).'' | ||
+ | |||
+ | {| style="width:100%" border="1" cellpadding="3" | ||
+ | ! Timeframe | ||
+ | ! Activity | ||
+ | ! Scheduled | ||
+ | ! Location | ||
+ | |- | ||
+ | | colspan="4" align="center" style="background:#abcdef" | '''September 1st, 2016: Start of season 2016/2017''' | ||
+ | |- | ||
+ | | colspan="4" align="center" style="background:#dddddd" | '''2016''' | ||
+ | |- | ||
+ | | September | ||
+ | | '''Call for NWI proposals''' | ||
+ | | September 1st, 2016 | ||
+ | | | ||
+ | |- | ||
+ | | September | ||
+ | | '''Call for NWI proposals - Deadline''' | ||
+ | | September 25st, 2016 | ||
+ | | | ||
+ | |- | ||
+ | | October | ||
+ | | <span style="color: red; ">First F2F Meeting</span> | ||
+ | | October 18-19th, 2016 | ||
+ | | Dublin | ||
+ | |- | ||
+ | | October | ||
+ | | '''NWI Selection''' | ||
+ | | October 19th, 2016 | ||
+ | | | ||
+ | |- | ||
+ | | colspan="4" align="center" style="background:#dddddd" | '''2017''' | ||
+ | |- | ||
+ | | January | ||
+ | | Test implementations at Connectathon (North America) | ||
+ | | January 23-27, 2017 | ||
+ | | Chicago, USA | ||
+ | |- | ||
+ | | February | ||
+ | | <span style="color: red; ">Second F2F Meeting</span> | ||
+ | | February 7-8th, 2017 | ||
+ | | Italy | ||
+ | |- | ||
+ | | April | ||
+ | | Test implementations at Connectathon (Europe) | ||
+ | | April 3-7, 2017 | ||
+ | | Venice, Italy | ||
+ | |- | ||
+ | | May | ||
+ | | '''Publish work-items for Public Comment''' | ||
+ | | May 20th, 2017 | ||
+ | | | ||
+ | |- | ||
+ | | May | ||
+ | | '''Public Comment - Deadline''' | ||
+ | | June 20th, 2017 | ||
+ | | | ||
+ | |- | ||
+ | | June | ||
+ | | <span style="color: red; ">F2F meeting : Final review of NWIs, approved for ballot</span> | ||
+ | | June 15-16th, 2017 | ||
+ | | Chania, Greece | ||
+ | |- | ||
+ | | June | ||
+ | | Publication of CPs - released for Ballot | ||
+ | | June 30th, 2017 | ||
+ | | www.ihe.net | ||
+ | |- | ||
+ | | July | ||
+ | | '''Ballot Start''' | ||
+ | | July 10th, 2017 | ||
+ | | | ||
+ | |- | ||
+ | | July | ||
+ | | <span style="color: blue; ">IHE Pharmacy Webinar 2017</span> | ||
+ | | TBD | ||
+ | | WebEx Webinar | ||
+ | |- | ||
+ | | July | ||
+ | | <span style="color: green; ">Call for User (PC & TC) co-chairs</span> | ||
+ | | July 11th, 2017 | ||
+ | | | ||
+ | |- | ||
+ | | August | ||
+ | | Publication of Trial Implementation Supplements | ||
+ | | August 20th, 2017 | ||
+ | | www.ihe.net | ||
+ | |- | ||
+ | | August | ||
+ | | <span style="color: green; ">User (PC & TC) co-chairs election</span> | ||
+ | | August 8th, 2017 | ||
+ | | | ||
+ | |- | ||
+ | | August | ||
+ | | '''Ballot - Deadline''' | ||
+ | | August 8th, 2017 | ||
+ | | | ||
+ | |- | ||
+ | | August | ||
+ | | <span style="color: green; ">User (PC & TC) co-chairs election results</span> | ||
+ | | August 31th, 2017 | ||
+ | | | ||
+ | |- | ||
+ | | August | ||
+ | | Technical Frameworks Released | ||
+ | | August 31th, 2017 | ||
+ | | | ||
+ | |} | ||
==Pharmacy 2013-2014 Development Cycle Milestones== | ==Pharmacy 2013-2014 Development Cycle Milestones== | ||
Line 148: | Line 355: | ||
|June | |June | ||
|Publication of Public Comment Supplements | |Publication of Public Comment Supplements | ||
+ | | | ||
|www.ihe.net | |www.ihe.net | ||
− | |||
|- | |- | ||
|July | |July | ||
|Deadline for submission of public comments on profile supplements | |Deadline for submission of public comments on profile supplements | ||
− | |||
| | | | ||
+ | |www.ihe.net | ||
|- | |- | ||
|July | |July | ||
− | |Call for User co-chair | + | |Call for User co-chair |
− | | | + | |July |
| | | | ||
|- | |- | ||
|August | |August | ||
− | |Publication of CPs - released for Ballot | + | |Publication of CPs - released for Ballot |
− | |||
| | | | ||
+ | |www.ihe.net | ||
|- | |- | ||
|August | |August | ||
− | |Publication of Trial Implementation Supplements | + | |Publication of Trial Implementation Supplements |
− | |||
| | | | ||
+ | |www.ihe.net | ||
|- | |- | ||
|August | |August | ||
− | |User co-chair election August | + | |User co-chair election |
+ | |August | ||
+ | | | ||
|- | |- | ||
|September | |September | ||
− | |Publication of Final Text Technical Framework | + | |Publication of Final Text Technical Framework |
− | |||
| | | | ||
+ | |www.ihe.net | ||
|- | |- | ||
|September | |September |
Latest revision as of 03:19, 17 September 2018
The Timeline shows the main milestones of the development cycle, the Timeframe when they are typically expected to happen each year, and the actual date/time/location they have been Scheduled for this year.
Specific meetings and their agendas and minutes are listed on the page of the relevant Committee.
Dates and times are Central European Time (Brussels).
Pharmacy 2017-2018 Development Cycle Milestones
According to IHE Pharmacy Domain Milestone Dates
Dates and times are Central European Time (CET : Paris, Brussels, Amsterdam, Vienna).
Timeframe | Activity | Scheduled | Location |
---|---|---|---|
September 1st, 2017: Start of season 2017/2018 | |||
2017 | |||
2018 | |||
January | Test implementations at Connectathon (North America) | January 15-19, 2018 | Cleveland, Ohio, USA |
February | Second F2F Meeting | February 12-13th, 2018 | Oslo, Norway |
April | Test implementations at Connectathon (Europe) | April 16-20, 2018 | The Hague, NL |
May | Publish work-items for Public Comment | April 30th, 2018 | |
May | Public Comment - Deadline | May 230h, 2018 | |
June | F2F meeting : Final review of NWIs, approved for ballot | June 25-26th, 2018 | Vienna |
June | Publication of CPs - released for Ballot | June 29th, 2018 | www.ihe.net |
July | Ballot Start | July 2nd, 2018 | |
July | IHE Pharmacy Webinar 2018 | TBD | WebEx Webinar |
July | Call for Vendor (PC & TC) co-chairs | July 6th, 2018 | |
August | Vendor (PC & TC) co-chairs election | August 3rd, 2018 | |
August | Ballot - Deadline | August 6th, 2018 | |
August | Publication of Trial Implementation Supplements | August 20th, 2018 | www.ihe.net |
August | Vendor (PC & TC) co-chairs election results | August 31th, 2018 | |
August | Technical Frameworks Released | August 31th, 2018 |
Pharmacy 2016-2017 Development Cycle Milestones
Dates and times are Central European Time (CET : Paris, Brussels, Amsterdam, Vienna).
Timeframe | Activity | Scheduled | Location |
---|---|---|---|
September 1st, 2016: Start of season 2016/2017 | |||
2016 | |||
September | Call for NWI proposals | September 1st, 2016 | |
September | Call for NWI proposals - Deadline | September 25st, 2016 | |
October | First F2F Meeting | October 18-19th, 2016 | Dublin |
October | NWI Selection | October 19th, 2016 | |
2017 | |||
January | Test implementations at Connectathon (North America) | January 23-27, 2017 | Chicago, USA |
February | Second F2F Meeting | February 7-8th, 2017 | Italy |
April | Test implementations at Connectathon (Europe) | April 3-7, 2017 | Venice, Italy |
May | Publish work-items for Public Comment | May 20th, 2017 | |
May | Public Comment - Deadline | June 20th, 2017 | |
June | F2F meeting : Final review of NWIs, approved for ballot | June 15-16th, 2017 | Chania, Greece |
June | Publication of CPs - released for Ballot | June 30th, 2017 | www.ihe.net |
July | Ballot Start | July 10th, 2017 | |
July | IHE Pharmacy Webinar 2017 | TBD | WebEx Webinar |
July | Call for User (PC & TC) co-chairs | July 11th, 2017 | |
August | Publication of Trial Implementation Supplements | August 20th, 2017 | www.ihe.net |
August | User (PC & TC) co-chairs election | August 8th, 2017 | |
August | Ballot - Deadline | August 8th, 2017 | |
August | User (PC & TC) co-chairs election results | August 31th, 2017 | |
August | Technical Frameworks Released | August 31th, 2017 |
Pharmacy 2013-2014 Development Cycle Milestones
Dates and times are Central European Time (CET : Paris, Brussels, Amsterdam, Vienna).
Timeframe | Activity | Scheduled | Location |
---|---|---|---|
2013 | |||
September | Call for proposals | September 1st | |
October | F2F meeting : Final Selection of NWI for this cycle | October 30-31th, 2013 | Paris, France |
2014 | |||
February | F2F meeting | February 12-13th, 2014 | Vienna, Austria |
June | F2F meeting : Final review of NWIs, approved for ballot | June 11-12-13th, 2014 | Porto, Portugal |
Summer | IHE Pharmacy webinar 2014 | WebEx webinar | |
June | Publication of Public Comment Supplements | www.ihe.net | |
July | Deadline for submission of public comments on profile supplements | www.ihe.net | |
July | Call for Vendor co-chair | July | |
August | Publication of CPs - released for Ballot | www.ihe.net | |
August | Publication of Trial Implementation Supplements | www.ihe.net | |
August | Vendor co-chair election | August | |
September | Publication of Final Text Technical Framework | www.ihe.net | |
September | Vendor co-chair election results | September | |
2015 | |||
January/February | Test implementations at Connectathon (North America) | Chicago | |
April/May | Test implementations at Connectathon (Europe) | ||
April/May | F2F meeting at Connectathon (Europe) |
Pharmacy 2012-2013 Development Cycle Milestones
Dates and times are Central European Time (CET : Paris, Brussels, Amsterdam, Vienna).
Timeframe | Activity | Scheduled | Location |
---|---|---|---|
2012 | |||
September | Call for proposals | September 1st | |
October | F2F meeting : Final Selection of NWI for this cycle | October 23-24th, 2012 | Paris, France |
2013 | |||
March | F2F meeting | March 18-19th, 2013 | Treviso, Italy |
June | F2F meeting | June 10-12th, 2013 | Den Haag, Netherlands |
June | F2F meeting : Final review of NWIs, approved for ballot | June 11-12th, 2013 | |
Summer | IHE Pharmacy webinar 2013 | WebEx webinar | |
June | Publication of Public Comment Supplements | www.ihe.net | |
July | Deadline for submission of public comments on profile supplements | www.ihe.net | |
July | Call for User co-chair | July | |
August | Publication of CPs - released for Ballot | www.ihe.net | |
August | Publication of Trial Implementation Supplements | www.ihe.net | |
August | User co-chair election | August | |
September | Publication of Final Text Technical Framework | www.ihe.net | |
September | User co-chair election results September | ||
2014 | |||
January/February | Test implementations at Connectathon (North America) | Chicago | |
April/May | Test implementations at Connectathon (Europe) | ||
April/May | F2F meeting at Connectathon (Europe) |
Pharmacy 2011-2012 Development Cycle Milestones
Dates and times are Central European Time (CET : Paris, Brussels, Amsterdam, Vienna).
Timeframe | Activity | Scheduled | Location |
---|---|---|---|
2011 | |||
November | Call for proposals | November 1st | |
December | Deadline for submission of proposals | December 13th | |
December | P&TC drafts Detailed Profile Proposals for "Short Listed" Proposals | December 15th | T-Con |
2012 | |||
February | F2F meeting : Final Selection of Proposals for this cycle | February 2-3rd | Paris, France |
February | HIMSS : Marketing event with others IHE domains | February 20-24th | Las Vegas, USA |
May | F2F meeting @BernExpo | May 22-23 | Bern, Switzerland |
June | Ballot approval | June 28th | T-Con |
Summer | IHE Pharmacy webinar 2012 | WebEx webinar | |
June | Publication of Public Comment Supplements | June 22th | www.ihe.net |
July | Deadline for submission of public comments on profile supplements | July 22th | www.ihe.net |
July | Call for Vendor co-chair | July | |
August | Publication of CPs - released for Ballot | August 6th | www.ihe.net |
August | Publication of Trial Implementation Supplements | August 20th | www.ihe.net |
August | Vendor co-chair election | August | |
September | Publication of Final Text Technical Framework | www.ihe.net | |
September | Vendor co-chair election results | September | |
2013 | |||
January/February | Test implementations at Connectathon (North America) | Chicago | |
April | Test implementations at Connectathon (Europe) | April 15-19th 2013 | Istanbul, Turkey |
April | F2F meeting at Connectathon (Europe) | April 15-19th 2013 | Istanbul, Turkey |
Pharmacy 2010-2011 Development Cycle
Timeframe | Activity | Scheduled | Location |
---|---|---|---|
2010 | |||
2011 | |||
April | F2F meeting - Choices of Work items | April 12-13, 09:00 - 18: 00 CET | Pisa, Italy |
June | F2F meeting : Work Items development | June 28-29, 09:00 - 18: 00 CET | Vienna, Austria |
July | IHE Pharmacy webinar 2011 | July 28, 9:00 – 10:30 am CDT | Webex |
October | F2F meeting : Work Items development | June 5-6-29, 09:00 - 18: 00 CET | Paris, France |
October | Publication of the Ballot for Change Proposals (CP) | October 7th | |
November | Deadline for submission of CP | November 7th | |
November | Publication of CPs - released for Ballot | www.ihe.net | |
December | Publication of Trial Implementation Supplements | November 30th | www.ihe.net |
2012 | |||
January | Test implementations at Connectathon (North America) | January 9-13th | Hyatt Regency, Chicago, USA |
May | Test implementations at Connectathon (Europe) | May 21-25 | BernExpo, Bern, Switzerland |
May | F2F meeting | May 22-23th | BernExpo, Bern, Switzerland |
Pharmacy 2009-2010 Development Cycle
Timeframe | Activity | Scheduled | Location |
---|---|---|---|
2009 | |||
2010 | |||
April | F2F meeting : Profile development - Choices of proposals | April 15th, 10:00AM-4:30PM & 16 9:00AM-5:00PM CET | Bordeaux, France |
June | F2F meeting : Profile development | June 7ty, 09:00-17:00 & 8 09:00-17:00 CET | Paris |
August | IHE Pharmacy webinar 2010 | August 24th, 17:30-18:30 CET | Webex |
August | Vendor Co-chair : Election results | August 26th, 16:00-17:00 CET | T-Conf |
September | F2F meeting : Profile development | September 9th 09:00-17:00 & 10th 09:00-17:00 CET | Brussels |
End of september | P&TC Finalizes first selected profiles for public comment | ||
November | Publication of Public Comment profiles | November 2nd | |
November | Deadline for submission of public comments on profiles | November 16th | |
Publication of Trial Implementation Profiles | December 2nd | ||
2011 | |||
April | Profiles tested at IHE Europe Connectathon | April 11-15th | Pisa, Italy |
April | IHE Pharmacy F2F meeting | April 12-13th | Pisa, Italy |