PCD Connectathon&Showcase 2012-01-24 Webex: Difference between revisions
Jump to navigation
Jump to search
m establish page |
→Discussion: correction, end of summary |
||
| (5 intermediate revisions by the same user not shown) | |||
| Line 11: | Line 11: | ||
== Participants == | == Participants == | ||
Jon Blasingame, Chris Courville, Al Engelbert, Robert Flanders, Ken Fuchs, Gene Hageman, Chad Hays, Ken Hoyme, Jeff McGeath, Bryan Tamke, Andreas Theodosiou, Jonathan Walton, Jingmei Yang, Manny Furst | |||
== Discussion == | == Discussion == | ||
'''This meeting was recorded''' | '''This meeting was not recorded''' | ||
:{|border="2" | :{|border="2" | ||
| Line 30: | Line 29: | ||
| '''Status/Discussion:''' | | '''Status/Discussion:''' | ||
: | : No changes were made to the agenda. The agenda is available at http://wiki.ihe.net/index.php?title=PCD_Connectathon%26Showcase_WG_2011-12. | ||
: Discussion Summary from | : Discussion Summary from January 3 was reviewed. The January 17 meeting was recorded; written summary not yet available. | ||
'''Decisions/Issues:''' | '''Decisions/Issues:''' | ||
| Line 43: | Line 42: | ||
| '''Status/Discussion:''' | | '''Status/Discussion:''' | ||
Connectathon: | Lessons Learned: | ||
: Basic structure of ACM test – took too much time – reuse AR actor messages when testing AC if AM can reuse data tested successfully at the Connectathon. Leave multiple test for the end, specify that there is no need to log data if previous tests were successful. | |||
: NIST tool – when an issue is found make it clear to participants that they can ignore those error messages. | |||
: Provide a “copy to clipboard” of the data in the NIST tool, desired to facilitate logging. | |||
: Work to eliminate the background noise on network – too much traffic on the network. E.g. turn off netbeui. | |||
'''Decisions/Issues:''' | '''Decisions/Issues:''' | ||
| Line 55: | Line 57: | ||
| '''Status/Discussion:''' | | '''Status/Discussion:''' | ||
Status: | |||
: No updates since Connectathon for some. | |||
: Manny encouraged review of the UCs, especially the table with the descriptions. These will lead to the scripts and may be in the handouts. | |||
: Manny asked for graphics of devices/use of devices for the pillars and for the space available in UCs 1 and 2. | |||
: Robert asked about UC 8 and Manny indicated he is asking for a 2 ft. wider wall to accommodate the ventilator and the terminal displaying the EMR. | |||
'''Decisions/Issues:''' | '''Decisions/Issues:''' | ||
Latest revision as of 22:47, 24 January 2012
PCD Connectathon & Showcase Meeting 2011-2012 Cycle, January 24, 2012
Action Items
You can find the Action Items at PCD-Connectathon&Showcase-ActionItemsCycle6-2011-2012
Agenda
You can find the agenda at http://wiki.ihe.net/index.php?title=PCD_Connectathon%26Showcase_WG_2011-12
Participants
Jon Blasingame, Chris Courville, Al Engelbert, Robert Flanders, Ken Fuchs, Gene Hageman, Chad Hays, Ken Hoyme, Jeff McGeath, Bryan Tamke, Andreas Theodosiou, Jonathan Walton, Jingmei Yang, Manny Furst
Discussion
This meeting was not recorded
Item Topic Discussion 1 Introductions & Agenda Review
- MannyStatus/Discussion: - No changes were made to the agenda. The agenda is available at http://wiki.ihe.net/index.php?title=PCD_Connectathon%26Showcase_WG_2011-12.
- Discussion Summary from January 3 was reviewed. The January 17 meeting was recorded; written summary not yet available.
Decisions/Issues:
Action(s):
2 2012 N A Connectathon
- MannyStatus/Discussion: Lessons Learned:
- Basic structure of ACM test – took too much time – reuse AR actor messages when testing AC if AM can reuse data tested successfully at the Connectathon. Leave multiple test for the end, specify that there is no need to log data if previous tests were successful.
- NIST tool – when an issue is found make it clear to participants that they can ignore those error messages.
- Provide a “copy to clipboard” of the data in the NIST tool, desired to facilitate logging.
- Work to eliminate the background noise on network – too much traffic on the network. E.g. turn off netbeui.
Decisions/Issues:
Action(s):
3 2012 Showcase
- MannyStatus/Discussion: Status:
- No updates since Connectathon for some.
- Manny encouraged review of the UCs, especially the table with the descriptions. These will lead to the scripts and may be in the handouts.
- Manny asked for graphics of devices/use of devices for the pillars and for the space available in UCs 1 and 2.
- Robert asked about UC 8 and Manny indicated he is asking for a 2 ft. wider wall to accommodate the ventilator and the terminal displaying the EMR.
Decisions/Issues:
Action(s):
The next meeting is January 31.
Return to main WG page which has links to individual meeting pages
Return to main PCD Connectathon/Showcase WG page: PCD_Connectathon&Showcase_WG_2011-12