PCD Connectathon&Showcase 2011-07-19 Webex: Difference between revisions

From IHE Wiki
Jump to navigation Jump to search
Efurst (talk | contribs)
enter discussion summary
 
Efurst (talk | contribs)
 
Line 37: Line 37:
| '''Status/Discussion:'''   
| '''Status/Discussion:'''   


Sandy described the long time desire to integrate PCD into a larger story. PCD draws a lot of interest, and integration will help attract visitors as well as showing the larger picture. She also described the desire to have 10 use cases, down from about 30. In the past there were multiple instances of many of them. She wants to develop a clear picture of what IHE can do, which doesn’t work in the past process, so this should provide clarity.  
Sandy described the long time desire to integrate PCD into a larger story. PCD draws a lot of interest, and integration will help attract visitors as well as showing the larger picture. She also described the desire to have 10 use cases, down from about 30. In the past there were multiple instances of many of them. She wants to develop a clear picture of what IHE can do, which didn’t work well in the past, so this should provide clarity.  


Sandy noted that PCD will need walls for mounting and having server space. The format at this time will use pods as the other domains used, then in the middle of four pods there will be a smaller PCD room. One application may be starting in one pod, flowing to PCD then on to another pod.  
Sandy noted that PCD will need walls for mounting devices and having server space. The format at this time will use pods for the other domains. In the middle of four pods there will be a smaller PCD room shared with A-V, office space or other function. An application may be starting in one pod, flowing to PCD then on to another pod.
 
Manny described the four use cases, with numbers 1 and 8 under development. He described the approach as limiting the number of instances for registration, and moving some vendors/systems to other stories in October when registration is over. Sandy has scheduled a meeting in October to arrange systems within use cases, and at that time the clinical stories and participating devices/systems will be moved/aligned.


Manny described the four use cases, with numbers 1 and 8 under development. He described the approach as limiting the number of instances for registration, and moving some vendors/systems to other stories in October when registration is over.
Al asked about the timeline. HIMSS Registration ends September 23 (Connectathon registration ends September 30). PCD will integrate our story with the other domains that precede and follow the PCD portion of the tour.
Al asked about the timeline. HIMSS Registration ends September 23 (Connectathon registration ends September 30). PCD will integrate our story with the other domains that precede and follow the PCD portion of the tour.
Sandy requested ideas for making the PCD walls more effective with graphics, such as a picture of a PCD office or ICU, etc. John indicated that more time is required to think this through. Robert expressed concern about limiting the number of use cases for multiple instances of the same types of equipment. Sandy responded that hopefully, this approach won’t discourage vendors to sign up for participation when they know there are others with the same devices.
 
Sandy requested ideas for making the PCD walls more effective with graphics, such as a picture of a PCD office or ICU, etc. John Rhoads indicated that more time is required to think this through. Robert expressed concern about limiting the number of use cases for multiple instances of the same types of equipment. Sandy responded that hopefully, this approach won’t discourage vendors to sign up for participation when they know there are others with the same devices.





Latest revision as of 13:06, 20 July 2011

PCD Connectathon & Showcase Fifth Meeting 2011-2012 Cycle, July 19, 2011

Action Items

You can find the Action Items at PCD-Connectathon&Showcase-ActionItemsCycle6-2011-2012

Agenda

You can find the agenda at http://wiki.ihe.net/index.php?title=PCD_Connectathon%26Showcase_WG_2011-12

Participants

Sam Carello, Al Engelbert, Robert Flanders, John Rhoads, Sandy Vance, Manny Furst

Discussion

Item Topic Discussion
1 Introductions & Agenda Review
- Manny
Status/Discussion:
No changes were made to the agenda
Discussion Summary was not reviewed

Decisions/Issues:

Action(s):

2 HIMSS12
- Sandy
Status/Discussion:

Sandy described the long time desire to integrate PCD into a larger story. PCD draws a lot of interest, and integration will help attract visitors as well as showing the larger picture. She also described the desire to have 10 use cases, down from about 30. In the past there were multiple instances of many of them. She wants to develop a clear picture of what IHE can do, which didn’t work well in the past, so this should provide clarity.

Sandy noted that PCD will need walls for mounting devices and having server space. The format at this time will use pods for the other domains. In the middle of four pods there will be a smaller PCD room shared with A-V, office space or other function. An application may be starting in one pod, flowing to PCD then on to another pod.

Manny described the four use cases, with numbers 1 and 8 under development. He described the approach as limiting the number of instances for registration, and moving some vendors/systems to other stories in October when registration is over. Sandy has scheduled a meeting in October to arrange systems within use cases, and at that time the clinical stories and participating devices/systems will be moved/aligned.

Al asked about the timeline. HIMSS Registration ends September 23 (Connectathon registration ends September 30). PCD will integrate our story with the other domains that precede and follow the PCD portion of the tour.

Sandy requested ideas for making the PCD walls more effective with graphics, such as a picture of a PCD office or ICU, etc. John Rhoads indicated that more time is required to think this through. Robert expressed concern about limiting the number of use cases for multiple instances of the same types of equipment. Sandy responded that hopefully, this approach won’t discourage vendors to sign up for participation when they know there are others with the same devices.


Decisions/Issues:

Action(s):


Return to main WG page which has links to individual meeting pages

Return to main PCD Connectathon/Showcase WG page: PCD_Connectathon&Showcase_WG_2011-12