Rad TF Maintenance 2010-11: Difference between revisions

From IHE Wiki
Jump to navigation Jump to search
Kevino (talk | contribs)
New page: ===Summary=== Target: Prepare CP's for Ballot for May 2011 Number of outstanding CPs: :* xx '''Assigned''' CPs to work on ::* ''CP-051 : Clarify Image Manager requirements in PGP profile...
 
Kevino (talk | contribs)
 
(3 intermediate revisions by the same user not shown)
Line 4: Line 4:


Number of outstanding CPs:
Number of outstanding CPs:
:* xx '''Assigned''' CPs to work on
:* 26 '''Assigned''' CPs to work on
::* ''CP-051 : Clarify Image Manager requirements in PGP profile''
::* For specifics refer to [ftp://iheyr2:interop@ftp.ihe.net/Radiology/TF_Maintenance/IHE_Radiology_CP_Tracking-2010-10-05.xls Tracking Doc] and sort by Status
::* ''CP-075 : Avoid using "system" for actors in transaction descriptions''
::* ...


:* xx '''Completed''' CPs that failed ballot and need to be reworked)
:* 0 '''Completed''' CPs that failed ballot and need to be reworked)
::*  
::* Although CP-182 is flagged as Completed and fell through the cracks
 
:* 2 '''Submitted''' CPs to review/assign
::* CP-212 BIR Vol-2 Lower limit of window for NM/PET imgs
::* CP-213 SWF,PIR Vol-2 Refactor Radiology Transactions for HL7 2.5.1 and IHE PAM


:* xx '''New''' CPs to review/assign
::*


List of "non-trivial" CPs:
List of "non-trivial" CPs:
:* ''CP-XXX : Add Display Image Transaction (Editor)''
:* CP-189 : Add Display Image Transaction (Kevin)
:** Needed to unbundle display requirements from network image retrieval.   
:** Needed to unbundle display requirements from network image retrieval.   
:** Involves factoring out display behaviors from Images Stored; then seeing if that allows us to insert it in existing profiles  as needed.
:** Involves factoring out display behaviors from Images Stored; then seeing if that allows us to insert it in existing profiles  as needed.
:** Would need to go through the supplement review process (it adds a transaction)
:** Would need to go through the supplement review process (it adds a transaction)
:* CP-213 : Refactor Radiology Transactions for HL7 2.5.1 and IHE PAM (Chris)
:** Needed to have clear path to IHE compliance using 2.5.1 and leveraging PAM
:** must be done carefully to avoid causing confusion or disrupting compliance 




Line 36: Line 39:


Effort Evaluation (as a % of Tech Cmte Bandwidth):
Effort Evaluation (as a % of Tech Cmte Bandwidth):
:* ''10-15% (Somewhat elastic.  Most aren't urgent/critical.  Some could be wrapped up post-cycle in April/June.)''
:* 20%  


Responses to Issues:
Responses to Issues:
Line 42: Line 45:


Candidate Editor:
Candidate Editor:
: Chris Lindop/David Clunie
: Kevin O'Donnell

Latest revision as of 11:22, 6 October 2010

Summary

Target: Prepare CP's for Ballot for May 2011

Number of outstanding CPs:

  • 26 Assigned CPs to work on
  • 0 Completed CPs that failed ballot and need to be reworked)
  • Although CP-182 is flagged as Completed and fell through the cracks
  • 2 Submitted CPs to review/assign
  • CP-212 BIR Vol-2 Lower limit of window for NM/PET imgs
  • CP-213 SWF,PIR Vol-2 Refactor Radiology Transactions for HL7 2.5.1 and IHE PAM


List of "non-trivial" CPs:

  • CP-189 : Add Display Image Transaction (Kevin)
    • Needed to unbundle display requirements from network image retrieval.
    • Involves factoring out display behaviors from Images Stored; then seeing if that allows us to insert it in existing profiles as needed.
    • Would need to go through the supplement review process (it adds a transaction)
  • CP-213 : Refactor Radiology Transactions for HL7 2.5.1 and IHE PAM (Chris)
    • Needed to have clear path to IHE compliance using 2.5.1 and leveraging PAM
    • must be done carefully to avoid causing confusion or disrupting compliance


List of outstanding items not yet submitted as CPs:

  • Harmonization work from the HL7 task force (when it becomes available) will affect the HL7 Implementation guide section(s) of the Framework.

List of other maintenance tasks:

  • Cleanup of Cross-Referencing to ITI (they renumbered their sections)
  • R2/RE Harmonization?

7. Risks

Any technical or political risks related to expected maintenance items?


9. Tech Cmte Evaluation

Effort Evaluation (as a % of Tech Cmte Bandwidth):

  • 20%

Responses to Issues:

See italics in Risk and Open Issue sections

Candidate Editor:

Kevin O'Donnell