ITI Cycle Milestones: Difference between revisions

From IHE Wiki
Jump to navigation Jump to search
Manuel (talk | contribs)
New page: As a reminder, input, goal and output of each face to face meeting are listed below:<br><br> <i><u>First face to face meeting of the cycle</u> (November 18th-19th for 2008-2009 cycle)</i><...
 
Manuel (talk | contribs)
No edit summary
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
<span style="color:#ff0000"><b>This page was a first draft for editors guidelines. It isn't used anymore, the guidelines being in the ITI_Editors_Guidelines page.</b></span>
{| style="width:95%" border="1" cellpadding="1"
! Meeting
! Time frame
! Goal
! Input
! Output
|-
| First face to face
| November / December
| Based on an analysis of the detailed proposals, to define recommandations for the coming cycle in terms of new work items
| Detail proposal for each proposed new work items with a list of alternatives for the standards that can be used
| Written recommandation to the planning committee
|-
| Second face to face
| January / February
| For each supplement, review of all the use cases and selections of the standards to be used in the profile
| For each work item, a document started with the proper IHE template properly applied;<br>
For each supplement, a rough cut of volume 1<br>
For each supplement, a list of alternatives for standards to be used for the profile with strengthes and weaknesses of each alternatives<br>
| For each supplement, an action plan to complete volume 1 through calls based on the use cases reviewed during the meeting
|-
| Third face to face
| April / May
| For each supplement, review of volume 2 and preparation for public comment publication of all work items
| For each supplement, volume 1 completed (reviewed at least twice by the editorial team prior to the face to face)<br>
For each supplement, volume 2 fully written (each transaction described, security section written...) and ready to be reviewed by the committee (reviewed at least twice by the editorial team prior to the face to face)
| For each work item, an approved document to be released for public comment publication possibly pending minor updates to be completed before the release date
|-
| Fourth face to face
| July
| For each work item, resolution of comments and preparation for final publication
| For each work item, a complete document updated with resolution from non-controversial comments (done through call(s) with the editorial team)<br>
For each work item, an ordered list of non-resolved comments sorted by priority
| For each work item, an approved document to be released for final publication possibly pending minor updates to be completed before the release date
|-
|}
As a reminder, input, goal and output of each face to face meeting are listed below:<br><br>
As a reminder, input, goal and output of each face to face meeting are listed below:<br><br>
<i><u>First face to face meeting of the cycle</u> (November 18th-19th for 2008-2009 cycle)</i><br>
<i><u>First technical face to face meeting of the cycle</u> (November 18th-19th for 2008-2009 cycle)</i><br>
:<i>Input:</i><br>
:<i>Input:</i><br>
::* Detail proposal for each proposed new work items with a list of alternatives for the standards that can be used.
::* Detail proposal for each proposed new work item (profile or white paper) with a list of alternatives for the standards that can be used.
:<i>Goal:</i><br>
:<i>Goal:</i><br>
::* Based on an analysis of the detailed proposals, to define recommandations for the coming cycle in terms of new work items.<br>
::* Based on an analysis of the detailed proposals, to define recommandations for the coming cycle in terms of new work items (profiles and white papers).<br>
:<i>Output:</i><br>
:<i>Output:</i><br>
::* Written recommandation to the planning committee.<br>
::* Written recommandation to the planning committee.<br>
<br>
<br>
<i><u>Second face to face meeting of the cycle</u> (January 26th-29th for 2008-2009 cycle)</i><br>
<i><u>Second technical face to face meeting of the cycle</u> (January 26th-29th for 2008-2009 cycle)</i><br>
:<i>Input:</i><br>
:<i>Input:</i><br>
::* For each work item, a document started with the proper IHE template properly applied;
::* For each work item (profile or white paper), a document started with the proper IHE template properly applied;
::* For each supplement, a rough cut of volume 1;
::* For each profile, a rough cut of volume 1;
::* For each supplement, a list of alternatives for standards to be used for the profile with strengthes and weaknesses of each alternatives.
::* For each white paper, a detailed outline with identification of the name and the future content of each section;
::* For each profile and for each white paper for which it is relevant, a list of alternatives for standards to be used for the profile with strengthes and weaknesses of each alternative.<br>
:<i>Goal:</i><br>
:<i>Goal:</i><br>
::* For each supplement, review of all the use cases and selections of the standards to be used in the profile.<br>
::* For each profile, review of all the use cases and selection of the standards to be used in the profile;
::* For each white paper, review of the outline and if relevant selection of the standards.
<br>
:<i>Output:</i><br>
:<i>Output:</i><br>
::* For each supplement, an action plan to complete volume 1 through calls based on the use cases reviewed during the meeting.
::* For each profile, an action plan to complete volume 1 through calls based on the use cases reviewed during the meeting;
::* For each white paper, an action plan to complete the identified sections through calls.
<br>
<br>
<i><u>Third face to face meeting of the cycle</u> (May 4th-8th for 2008-2009 cycle)</i><br>
<i><u>Third technical face to face meeting of the cycle</u> (May 4th-8th for 2008-2009 cycle)</i><br>
:<i>Input:</i><br>
:<i>Input:</i><br>
::* For each supplement, volume 1 completed (reviewed at least twice by the editorial team prior to the face to face);
::* For each profile, volume 1 completed (reviewed at least twice by the editorial team prior to the face to face);
::* For each supplement, volume 2 fully written (each transaction described, security section written...) and ready to be reviewed by the committee (reviewed at least twice by the editorial team prior to the face to face).
::* For each profile, volume 2 fully written (each transaction described, security section written...) and ready to be reviewed by the committee (reviewed at least twice by the editorial team prior to the face to face);
::* For each white paper, draft of the white paper with possible open issues (reviewed at least once by the editoria team prior to the face to face).<br>
:<i>Goal:</i><br>
:<i>Goal:</i><br>
::* For each supplement, review of volume 2 and preparation for public comment publication of all work items.<br>
::* For each profile, review of volume 2 and preparation for public comment publication;
::* For each white paper, review of the draft and preparation for public comment publication.<br>
:<i>Output:</i><br>
:<i>Output:</i><br>
::* For each work item, an approved document to be released for public comment publication possibly pending minor updates to be completed before the release date.<br>
::* For each work item (profile or white paper), an approved document to be released for public comment publication possibly pending minor updates to be completed before the release date.<br>
<i><u>Fourth face to face meeting of the cycle</u> (July 13th-17th for 2008-2009 cycle)</i><br>
<i><u>Fourth technical face to face meeting of the cycle</u> (July 13th-17th for 2008-2009 cycle)</i><br>
:<i>Input:</i><br>
:<i>Input:</i><br>
::* For each work item, a complete document updated with resolution from non-controversial comments (done through call(s) with the editorial team);
::* For each work item (profile or white paper), a complete document updated with resolution from non-controversial comments (possibly done through call(s) with the editorial team);
::* For each work item, an ordered list of non-resolved comments sorted by priority.
::* For each work item (profile or white paper), an ordered list of non-resolved comments sorted by priority.
:<i>Goal:</i><br>
:<i>Goal:</i><br>
::* For each work item, resolution of comments and preparation for final publication.<br>
::* For each work item (profile or white paper), resolution of comments and preparation for final publication.<br>
:<i>Output</i><br>
:<i>Output</i><br>
::* For each work item, an approved document to be released for final publication possibly pending minor updates to be completed before the release date.<br>
::* For each work item (profile or white paper), an approved document to be released for final publication possibly pending minor updates to be completed before the release date.<br>
<br>
<br>

Latest revision as of 04:30, 17 December 2008

This page was a first draft for editors guidelines. It isn't used anymore, the guidelines being in the ITI_Editors_Guidelines page.


Meeting Time frame Goal Input Output
First face to face November / December Based on an analysis of the detailed proposals, to define recommandations for the coming cycle in terms of new work items Detail proposal for each proposed new work items with a list of alternatives for the standards that can be used Written recommandation to the planning committee
Second face to face January / February For each supplement, review of all the use cases and selections of the standards to be used in the profile For each work item, a document started with the proper IHE template properly applied;

For each supplement, a rough cut of volume 1
For each supplement, a list of alternatives for standards to be used for the profile with strengthes and weaknesses of each alternatives

For each supplement, an action plan to complete volume 1 through calls based on the use cases reviewed during the meeting
Third face to face April / May For each supplement, review of volume 2 and preparation for public comment publication of all work items For each supplement, volume 1 completed (reviewed at least twice by the editorial team prior to the face to face)

For each supplement, volume 2 fully written (each transaction described, security section written...) and ready to be reviewed by the committee (reviewed at least twice by the editorial team prior to the face to face)

For each work item, an approved document to be released for public comment publication possibly pending minor updates to be completed before the release date
Fourth face to face July For each work item, resolution of comments and preparation for final publication For each work item, a complete document updated with resolution from non-controversial comments (done through call(s) with the editorial team)

For each work item, an ordered list of non-resolved comments sorted by priority

For each work item, an approved document to be released for final publication possibly pending minor updates to be completed before the release date


As a reminder, input, goal and output of each face to face meeting are listed below:

First technical face to face meeting of the cycle (November 18th-19th for 2008-2009 cycle)

Input:
  • Detail proposal for each proposed new work item (profile or white paper) with a list of alternatives for the standards that can be used.
Goal:
  • Based on an analysis of the detailed proposals, to define recommandations for the coming cycle in terms of new work items (profiles and white papers).
Output:
  • Written recommandation to the planning committee.


Second technical face to face meeting of the cycle (January 26th-29th for 2008-2009 cycle)

Input:
  • For each work item (profile or white paper), a document started with the proper IHE template properly applied;
  • For each profile, a rough cut of volume 1;
  • For each white paper, a detailed outline with identification of the name and the future content of each section;
  • For each profile and for each white paper for which it is relevant, a list of alternatives for standards to be used for the profile with strengthes and weaknesses of each alternative.
Goal:
  • For each profile, review of all the use cases and selection of the standards to be used in the profile;
  • For each white paper, review of the outline and if relevant selection of the standards.


Output:
  • For each profile, an action plan to complete volume 1 through calls based on the use cases reviewed during the meeting;
  • For each white paper, an action plan to complete the identified sections through calls.


Third technical face to face meeting of the cycle (May 4th-8th for 2008-2009 cycle)

Input:
  • For each profile, volume 1 completed (reviewed at least twice by the editorial team prior to the face to face);
  • For each profile, volume 2 fully written (each transaction described, security section written...) and ready to be reviewed by the committee (reviewed at least twice by the editorial team prior to the face to face);
  • For each white paper, draft of the white paper with possible open issues (reviewed at least once by the editoria team prior to the face to face).
Goal:
  • For each profile, review of volume 2 and preparation for public comment publication;
  • For each white paper, review of the draft and preparation for public comment publication.
Output:
  • For each work item (profile or white paper), an approved document to be released for public comment publication possibly pending minor updates to be completed before the release date.

Fourth technical face to face meeting of the cycle (July 13th-17th for 2008-2009 cycle)

Input:
  • For each work item (profile or white paper), a complete document updated with resolution from non-controversial comments (possibly done through call(s) with the editorial team);
  • For each work item (profile or white paper), an ordered list of non-resolved comments sorted by priority.
Goal:
  • For each work item (profile or white paper), resolution of comments and preparation for final publication.
Output
  • For each work item (profile or white paper), an approved document to be released for final publication possibly pending minor updates to be completed before the release date.