Talk:IHE PCD ICE-PCD Analysis Committee: Difference between revisions

From IHE Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
Sections of 11073
A proposed General Gap Analysis Process


11073-10101 - Nomenclature (2004)
'''Phase I: Identify Gaps'''


11073-10201 - Domain Information Model (2004)
Yes: Requirement has been met.  No Action Required


11073-20101 - Application Profiles - Base Standard (2004)
No: Gap has been identified. Remedial Action Required


11073-20301 - Remote Control (Pre-Ballot)
N/A: Requirement is not applicable. No Action Required.


11073-30200 - Transport Profile - Cable Connected (2004)


11073-30300 - Transport Profile - Infared Wireless (2004)
'''Phase II: Fill Gaps'''


Prepare Process Development Plans


Sections of ICE
Implement Requirement Notifications and Track Implementation.


ICE — Part 1: General requirements and conceptual model (2008)
 
Any Comments on the General Structure?

Latest revision as of 21:20, 10 November 2008

A proposed General Gap Analysis Process

Phase I: Identify Gaps

Yes: Requirement has been met. No Action Required

No: Gap has been identified. Remedial Action Required

N/A: Requirement is not applicable. No Action Required.


Phase II: Fill Gaps

Prepare Process Development Plans

Implement Requirement Notifications and Track Implementation.


Any Comments on the General Structure?