ITI Agenda November 2026: Difference between revisions

From IHE Wiki
Jump to navigation Jump to search
Oegger (talk | contribs)
 
(14 intermediate revisions by 2 users not shown)
Line 355: Line 355:
| style="text-align: center" | 2:00 <font style="font-variant: small-caps">pm</font>&ndash;3:00 <font style="font-variant: small-caps">pm</font>
| style="text-align: center" | 2:00 <font style="font-variant: small-caps">pm</font>&ndash;3:00 <font style="font-variant: small-caps">pm</font>
| style="text-align: center" | Oliver
| style="text-align: center" | Oliver
| id="11-11-1400" | First Vasil CP's and then ITI Webinar Topics Planning & 2026 IHE Board report planning
| id="11-11-1400" | First Vasil CP's  
| style="text-align: left" |  
| style="text-align: left" |  


Line 380: Line 380:


Patent disclosure
Patent disclosure
Updates from Connectathon and ITI/PCC/QRPH


|}
|}
Line 421: Line 422:
| style="text-align: center" | Gregorio / Diletta
| style="text-align: center" | Gregorio / Diletta
| id="11-12-0930" | RESTful ATNA to IG Conversion
| id="11-12-0930" | RESTful ATNA to IG Conversion
if enough time:
- ITI Webinar Topics Planning
  - MHD Full Text Search (Michael ?)
  - VHL (Ritika)
we should also do videos for those ..
- 2026 IHE Board report planning
| style="text-align: left" |  
| style="text-align: left" |  


''Participants'':
''Participants'':


Spencer, Diletta, Chris, Oliver


''Minutes'':
''Minutes'':
Line 445: Line 458:
''Participants'':
''Participants'':


Matt, Marti, Diletta, Francoise P., Chris M., Alexander, Spencer , David Wilen, Oliver, Chris, Steve


Quorum: 9 out of 14 active organizations (ahdis, arsenal, ehealth sign, epic, ge, iba, philipps, sequoia, vico modelling)
''Minutes'':
''Minutes'':


'''New work items'''
* '''Certificate Lifecycle Management (PKI):'''
** ISO 17090 will be considered as a base standard.
** The objective is to align the OR.net and RO RTSEC initiatives and develop a consensus profile in ITI. ITI would establish the base profile, and the DEV domain would develop options for SDPi, with alignment between ITI and DEV.
** Steve moved to place the PKI work item in the development backlog; Oliver seconded. The motion passed.
** Alexander and David will coordinate PKI teleconferences. The group discussed using the former VHL meeting slot; the schedule remains to be confirmed.
** See [https://github.com/IHE/IT-Infrastructure/issues/231 Certificate Lifecycle Management work item].
* '''Scheduling:'''
** Marti and François discussed the complexity of the scheduling transactions and the simpler ISiK profile.
** A gap analysis was suggested, including whether differences could be addressed through a national extension.
** See [https://github.com/IHE/IT-Infrastructure/issues/232 Scheduling Simplification work item].
'''Profile milestones and maintenance'''
* See [https://github.com/orgs/IHE/projects/8/views/1 ITI Project Planning Board].
* '''Verifiable Health Links (VHL):''' Oliver moved and Matt seconded moving VHL from public comment to trial implementation, provided no further comments are received. Philips and Epic abstained. ''Confirm the vote result and condition.''
* The committee reviewed [https://drive.google.com/drive/u/1/folders/1lutGlRLSke7JvwxG5Ee5iW_e9rm_1dcW spreadsheet of profiles for retirement and final text]. No maintenance conflicts were identified for the retirement list. Check for outstanding or stale change proposals.
* '''Internet User Authorization (IUA):''' The committee decided to advance IUA to final text. Steve will start the [https://wiki.ihe.net/index.php/Final_Text_Process final text process]. [Draft here: [https://wiki.ihe.net/index.php/IUA_FT_Evaluation]
* '''Notification of Document Availability:''' Check the process for finalizing its removal from the website.
* Place the profile cleanup list on Google Drive and link it from the wiki notes.
'''Webinar and board report'''
* MHD Full Text Search and VHL were identified as topics for the IHE testing webinar.
* Oliver will prepare a first draft of the board report.
* Add a link to the IHE Europe Steering Committee discussion points to the wiki notes.
'''Meetings and governance'''
* Diletta will email Aaron to determine whether a new International Board representative is needed. Charis will find a way to provide coverage. The representative could be anyone under the governance rules; a co-chair was recommended.
* Diletta will check the proposed next meeting at Arsenal IT near Venice on February 22, 2027.
* Cancel the next Tuesday planning call and the VHL call. Existing meetings otherwise continue.
* Check with Hagan about extending recurring meetings through the next quarter.
*Steve to identify a time with David and Alexander for PKI work item.


|}
|}

Latest revision as of 10:22, 19 November 2026

This 4-day meeting is to move forward all the current work items in the continuous development cycle. The [ITI Project Planning Board]

ITI F2F Meeting, November 9–12, 2026

Onsite Attendance:

  • Steve Nichols (GE)
  • Spencer LaGesse (Epic)

Remote Attendance:

  • Chris Melo (Philips)
  • Alain Zhang
  • Oliver Egger (ahdis), not available Tuesday morning and Thursday after the break
  • Matt Blackmon (probably)
  • Diletta Babato

google meet: https://meet.google.com/meet/cnh-kvhn-qbj

Agenda & Minutes

All times listed are tentative, and may be revised during the meeting; refresh often.

Monday, 9 November 2026

Day 1: Monday, 9 November 2026
Time

Virtual (CST, UTC−06:00)

Leads Activity Notes
8:30 am–9:00 am
  • Oliver / Steve / Diletta / Spencer

Participants:


Minutes:

- Goal

VHL: Resolve Public Comments DIS: Collect Comments for Volume 1 RESTful ATNA to IG Conversion: Comments for Volume 1 CP: Ballot 67 resolution : try to incorporate the changes Matt: Connectathon Discussion and Wednesday session planned for ITI Webinard Topics Planning & 2026 IHE Board report planning

9:00 am–9:30 am Carl / Ritika Verifiable Health Links – Public Comment

Participants:


Ritika Rawlani, Carl Leitner, Matt Blackmon, Diletta Babato, Alain Zhang, Chris Melo, Liz Turi, Ricardo Quintano, Spencer LaGesse, Steven Nichols, Oliver Egger

Minutes:

Went through changes, TestPlan is currently blocking the build, will be need to comment out until fixe, Ritika will incorporate the three options for authentication and resolve public comments. Explicitly lists also new issues which were coming up during ballot comment resolution phase after public comment closed.

9:30 am–10:00 am Alain De-Identification Services (DIS)

Participants:

Chris Melo, Diletta Babato, Lori Fourquet, Spencer LaGesse, Matt Blackmon, Alain Zhang, Steven Nichols, Oliver Egger

Minutes:


https://github.com/IHE/ITI.DIS/issues/11

10:00 am–10:30 am Gregorio / Diletta RESTful ATNA to IG Conversion

Participants:

Chris Melo, Diletta Babato, Spencer LaGesse, Matt Blackmon, Steven Nichols, Oliver Egger


Minutes:

Convert Volume 1 as is from PDF to IG


11:00 am–12:00 pm Oliver CP: Ballot 67 resolution

Participants:

Chris Melo, Diletta Babato, Spencer LaGesse, Matt Blackmon, Steven Nichols, Oliver Egger


Minutes:

- 1323-01 comments completed

1:00 pm–2:00 pm Oliver Github maintenance

Participants:


Minutes:


Tuesday, 10 November 2026

Day 2: Tuesday, 10 November 2026
Time

Virtual (CST, UTC−06:00)

Leads Activity Notes
8:30 am–9:00 am Alain De-Identification Services (DIS)

Participants:

Alain Z, Essien G, Diletta, Martin R, Matt B In room: Spencer L, Stephen N, Andrea F, Lori F Notetaker: Matt B

Minutes:

20 minutes of reading: https://github.com/IHE/ITI.DIS/issues/12

Alain asked us to focus on the ASYNC matters and the matrix We discussed reducing the number of options and also removing the notion of phasing and removing language to that effect. We moved some items to open issue where they would better fit

9:00 am–9:30 am Gregorio / Diletta RESTful ATNA to IG Conversion

Participants:

Alain Z, Essien G, Diletta, Martin R, Matt B, Chris M, David W In room: Spencer L, Stephen N, Andrea F, Lori F Notetaker: Matt B


Minutes:

Diletta is still working on matters and hopes to be able to update in the next time slot

9:30 am–10:30 am Steve, Spencer, David PKI Profile Proposal

Participants:

Alain Z, Essien G, Diletta, Martin R, Matt B, Chris M, David W, Alexander D In room: Spencer L, Stephen N, Andrea F, Lori F Notetaker: Matt B

Minutes:

David W and Alexander D presented on the planning committee profile

11:00 am–12:00 pm CP: Ballot 67 resolution:

- CP-ITI-1318

Participants:

Marti, Diletta, Oliver. Spencer, Chris, Steven


Minutes:

- CP-ITI-1318 continue with resolving comments, marti will hava a look

- CP-ITI-1329-03 Comments addressed and updated in completed

1:00 pm–3:00 pm Matt / Daniel Connectathon Discussion

Participants:

Matt, Daniel, Lori, Andrea, Diletta, Oliver. Spencer, Chris, Steven

Minutes:

New Profile: VHL

Updated MHD R4 with Full Text Option

Wednesday, 11 November 2026

Day 3: Wednesday, 11 November 2026
Time

Virtual (CST, UTC−06:00)

Leads Activity Notes
8:30 am–9:00 am Carl / Ritika Verifiable Health Links – Public Comment

Participants:

Ritika, Carl, Matt, Diletta, Spencer, Oliver

Minutes:

small editorial - Figure 1:XX.4.2-1: VHL Transactions Applicable Across the Use Cases diagram 1.XX.4.2.1 has cleaner version https://litlfred.github.io/smart-ips-pilgrimage/ 1:XX.4.2.2 figure scale is also off

we send out an email to announce to iti-tech to do a final read through, all comments have been adressed (for some we are awaiting information that they are resolved)

https://build.fhir.org/ig/IHE/ITI.VHL/branches/jul26/index.html

9:00 am–9:30 am Alain De-Identification Services (DIS)

Participants:

Lori, Diletta, Spencer, Alain, Martin, Oliver, Matt

Minutes:

See issues:

https://github.com/IHE/ITI.DIS/issues/13


9:30 am–10:00 am Gregorio / Diletta RESTful ATNA to IG Conversion

Participants:

Lori, Diletta, Spencer, Alain, Martin, Oliver, Matt


Minutes:

Still work ongoing on Volume 1

10:00 am–10:30 am Charles MHD Signature

Participants:

Matt, Diletta, Spencer, Charles, Oliver, Michael R.


Minutes:

Signature in [ITI-105] Simplified published (IHE MHD)

- DSG has a SubmissionSet Detached option, which is only relevant to XDS

- It would need a work item to add DSGjson to extended to sign the content within the it-65 profile, but clarify FHIR Specification signature format independent of the transportation format, see digital signature page on FHIR R6 build: https://build.fhir.org/signatures.html

- Discussion round Feb 22th, Padua (Italy) or at another call for

- Narrow the scope of the provided CP to extend ITI-105 guidances what might be necessary to assess what is missing for the submission set, Charles will send it.

11:00 am–12:00 pm Oliver Github maintenance / CPs (CP - 1332 Update RFC references in ATNA)

Participants:

Steve, Spencer, Matt, Diletta, Spencer, Oliver

Minutes:

CP - 1332 Update RFC references in ATNA

1:00 pm–2:00 pm Oliver CP: Ballot 67 resolution

Participants:

Steve, Spencer, Matt, Diletta, Spencer, Marti, Oliver

Minutes:


CP-ITI-1318-02: Updated to version-02, integrated all comments.

Note for Integration: FormatCodes IG needs to be update with formatCodes for IPS and CDA listed in Volume 3 and sIPS should depend on this new FormatCode IG version: https://profiles.ihe.net/ITI/sIPS/qa.html

Still open: Need to wait until CDA FHIR IG is published and need to create examples for it, otherwise completed.


2:00 pm–3:00 pm Oliver First Vasil CP's

Participants:

Steve, Spencer, Matt, Diletta, Spencer, Oliver

Minutes:

Ballot resolution: Went through CP 1333 XCDR Endpoint Addressing and CP 817 Add the Reference ID List slot to the Submission Set metadata


3:00 pm–4:00 pm All Joint ITI/PCC/QRPH — Planning next F2F meetings

Participants:

Vassil, Spencer, Matt, Diletta, Hagan, Spencer, Aaron, Lori, Steve, Andrea

Minutes:

Patent disclosure Updates from Connectathon and ITI/PCC/QRPH

Thursday, 12 November 2026

Day 4: Thursday, 12 November 2026
Time

Virtual (CST, UTC−06:00)

Leads Activity Notes
8:30 am–9:00 am Alain De-Identification Services (DIS)

Participants:


Minutes:


9:00 am–9:30 am Carl / Ritika Verifiable Health Links – Public Comment

Participants:


Minutes:


9:30 am–10:00 am Gregorio / Diletta RESTful ATNA to IG Conversion

if enough time:

- ITI Webinar Topics Planning

 - MHD Full Text Search (Michael ?)
 - VHL (Ritika)

we should also do videos for those ..

- 2026 IHE Board report planning

Participants:

Spencer, Diletta, Chris, Oliver

Minutes:


10:00 am–12:00 pm Oliver / Steve / Diletta / Spencer

Participants:

Matt, Marti, Diletta, Francoise P., Chris M., Alexander, Spencer , David Wilen, Oliver, Chris, Steve

Quorum: 9 out of 14 active organizations (ahdis, arsenal, ehealth sign, epic, ge, iba, philipps, sequoia, vico modelling) Minutes:

New work items

  • Certificate Lifecycle Management (PKI):
    • ISO 17090 will be considered as a base standard.
    • The objective is to align the OR.net and RO RTSEC initiatives and develop a consensus profile in ITI. ITI would establish the base profile, and the DEV domain would develop options for SDPi, with alignment between ITI and DEV.
    • Steve moved to place the PKI work item in the development backlog; Oliver seconded. The motion passed.
    • Alexander and David will coordinate PKI teleconferences. The group discussed using the former VHL meeting slot; the schedule remains to be confirmed.
    • See Certificate Lifecycle Management work item.
  • Scheduling:
    • Marti and François discussed the complexity of the scheduling transactions and the simpler ISiK profile.
    • A gap analysis was suggested, including whether differences could be addressed through a national extension.
    • See Scheduling Simplification work item.

Profile milestones and maintenance

  • Verifiable Health Links (VHL): Oliver moved and Matt seconded moving VHL from public comment to trial implementation, provided no further comments are received. Philips and Epic abstained. Confirm the vote result and condition.
  • The committee reviewed spreadsheet of profiles for retirement and final text. No maintenance conflicts were identified for the retirement list. Check for outstanding or stale change proposals.
  • Internet User Authorization (IUA): The committee decided to advance IUA to final text. Steve will start the final text process. [Draft here: [1]
  • Notification of Document Availability: Check the process for finalizing its removal from the website.
  • Place the profile cleanup list on Google Drive and link it from the wiki notes.

Webinar and board report

  • MHD Full Text Search and VHL were identified as topics for the IHE testing webinar.
  • Oliver will prepare a first draft of the board report.
  • Add a link to the IHE Europe Steering Committee discussion points to the wiki notes.

Meetings and governance

  • Diletta will email Aaron to determine whether a new International Board representative is needed. Charis will find a way to provide coverage. The representative could be anyone under the governance rules; a co-chair was recommended.
  • Diletta will check the proposed next meeting at Arsenal IT near Venice on February 22, 2027.
  • Cancel the next Tuesday planning call and the VHL call. Existing meetings otherwise continue.
  • Check with Hagan about extending recurring meetings through the next quarter.
  • Steve to identify a time with David and Alexander for PKI work item.