Difference between revisions of "Pharm Tech Minutes 2018.06.26"
Jump to navigation
Jump to search
Michael tan (talk | contribs) |
|||
(9 intermediate revisions by 2 users not shown) | |||
Line 26: | Line 26: | ||
* We have set up an e-mail to ask PHAST about their position as sponsor of IHE Pharmacy | * We have set up an e-mail to ask PHAST about their position as sponsor of IHE Pharmacy | ||
− | * Set up the new planning for the period 2018-2019. | + | * Set up the new planning '''[ftp://ftp.ihe.net/Pharmacy/yr10_2018-2019/Planning_Committee/Schedule/Schedule_2018-2019_v0.1.docx Planning schedule]''' for the period 2018-2019. |
* In this planning we also have decided on the dates and location of the autumn meeting. | * In this planning we also have decided on the dates and location of the autumn meeting. | ||
* The meeting will be hosted by GS1 in Amstelveen ( Suburb of Amsterdam). One meeting room is in the woods. ( the second day). | * The meeting will be hosted by GS1 in Amstelveen ( Suburb of Amsterdam). One meeting room is in the woods. ( the second day). | ||
Line 52: | Line 52: | ||
* Deferred the objection by saying this is a future plan where they could co-operate. | * Deferred the objection by saying this is a future plan where they could co-operate. | ||
− | == 16:45 - 17:00 | + | == 16:45 - 17:00 Supply topics== |
* Scope for supply | * Scope for supply | ||
Line 66: | Line 66: | ||
[[Pharmacy Technical Committee]] | [[Pharmacy Technical Committee]] | ||
− | [[Category: | + | [[Category: Minutes]] |
Latest revision as of 10:47, 18 November 2019
Meeting details
WebEx details:
Join IHE Pharmacy's WebEx meeting
https://phastinternational.webex.com/join/ihepharmacy | or go to https://phastinternational.webex.com and paste 956 796 372
Join by phone
- +33 17091 8646 France toll
- +43 125 302 1542 Austria toll
- +32 2894 8317 Belgium toll
- +41 43456 9564 Switzerland toll
Others phone numbers : https://phastinternational.webex.com/cmp3100/webcomponents/widget/globalcallin/globalcallin.do?siteurl=phastinternational&serviceType=MC&ED=329202667&tollFree=0
Access code: 956 796 372
Minutes
9:00 -13:00 IHE Pharmacy Board report and maintenance
- We have set up an e-mail to ask PHAST about their position as sponsor of IHE Pharmacy
- Set up the new planning Planning schedule for the period 2018-2019.
- In this planning we also have decided on the dates and location of the autumn meeting.
- The meeting will be hosted by GS1 in Amstelveen ( Suburb of Amsterdam). One meeting room is in the woods. ( the second day).
- Tony Schaller has made an external extension of the IHE CDA extended schema.
- IHE will not review the material, but will publish the material with a disclaimer.
- HL7 Pharmacy has published new HL7 CDAr2.1 templates. Austria will not change their specifications and remain with the CDAr2 templates.
- We decide not to organize a Webinar, because the last time there were too few attendants. There was recording of the Webinar that could be replayed.
- Oliver Egger has submitted 4 editorial comments, but these are not structural changes. We decide to edit the document and republish the document.
- Juergen will edit the document and send the document to the members.
13:00-14:00 Lunch
14:00- 15:30 Adverse Event Reporting
- Use case and input have been explained.
- A New Work Item has been set up. Michael will distribute the document.
- The IHE Pharmacy agrees to accept this work item for the 2019 period.
- Status of FHIR resource of Adverse Event is maturity 0.
- Define work items and next steps. See workitem proposal,
- Planning is to be ready with a document in October 2018.
16:00 - 16:45 DCC call
- IHE Pharmacy Board report.
- IHE PCC is objecting against the Immunization project from Gemini. They consider immunization as their topic.
- Deferred the objection by saying this is a future plan where they could co-operate.
16:45 - 17:00 Supply topics
- Scope for supply
- Transaction for ordering
- Transaction for delivery
- Use of the GS1 EDI messages. These are XML messages.
- Harmonize the glossary: Exampkle: sometimes the word "replenishment" is used. Other times it is "supply fulfillment".