Difference between revisions of "Radiology Proposals 2008-2009"
Line 43: | Line 43: | ||
Slate 5 - A B C E2 G = 115% | Slate 5 - A B C E2 G = 115% | ||
+ | |||
+ | Slate 6 - A B C D2 F1 G = 175% | ||
===Detailed Proposals=== | ===Detailed Proposals=== |
Revision as of 12:24, 22 October 2008
Final Selection
The 2008-09 workitems will be selected by the Planning Committee on October 22nd.
Profile | Editor | Effort | Tag |
---|---|---|---|
Basic Image Review - Detailed Proposal | D. Clunie | 40% | A |
PDI Extensions - Detailed Proposal | D. Clunie | 15% | B |
XDS-I Using XDS.b Technology - Detailed Proposal | P. Seifert | 20% | C |
Image Management Enhancements - Detailed Proposal | D. Heaney | ||
- - - address image rejection only | 20% | D1 | |
- - - address image synchronization | 60% | D2 | |
Enhanced DICOM Objects - Detailed Proposal | D. Donker | ||
- - - CT/MR Cardiac, MR Diffusion, CT/MR Contrast Perfusion | 45% | E1 | |
- - - MR Diffusion, CT/MR Contrast Perfusion only | 30% | E2 | |
Scheduled Workflow 2.0 - Detailed Proposal | C. Lindop | ||
- - - Operator Name, HL7-2.6 and fold-in PIR/Options | 35% | F1 | |
- - - also address additional SWF II Whitepaper uses cases | 80% | F2 | |
- - - and further address Distributed Workflow | 110% | F3 | |
Rad TF Maintenance 2008-09 - Detailed Proposal | CoChairs | 5-10% | G |
Slate 1 - A B C E2 F1 G = 145%
Slate 2 - A C E2 G = 100%
Slate 3 - A B C G = 85%
Slate 4 - A B C F1 G = 120%
Slate 5 - A B C E2 G = 115%
Slate 6 - A B C D2 F1 G = 175%
Detailed Proposals
The following detailed proposals are being prepared for evaluation by the Technical Cmte. Detailed Proposals are due Sept 30.
Tech Cmte evaluations are inserted at the bottom of each proposal.
Editors: To convert your Brief Proposal to a Detailed Proposal:
- Use the new link above (Changed "Brief" to "Detailed")
- Copy your Brief proposal text into the new page (don't forget to save)
- Copy the Delta Proposal Template into the bottom of the new page
- Update as necessary
- Your goal is to give sufficient detail for the Tech Cmte to be able to evaluate the technical feasibility and effort required.
Brief Proposals
The following brief proposals were selected on Sept 17 for expansion to detailed proposals.
This first group will be evaluated in the context of a Radiology Image Sharing Roadmap to be sketched by the Planning Cmte.
- XDS-I Using XDS.b Technology - Brief Proposal
- PDI Extensions - Brief Proposal
- Basic Image Review - Brief Proposal
- Cross Community Access for Imaging (XCA-I) - Brief Proposal
- Image Management Enhancements - Brief Proposal
- Scheduled Workflow II Phase 2 - Brief Proposal was accepted. The detailed proposals will be re-drafted to focus on the first step of transitioning to HL7 2.5.1 and the drivers for doing so.
- Mammography Reporting Workflow - Brief Proposal was referred to the Mammo Subcmte. The detailed proposal should clarify the need for bidirectional integration rather than individual product features. A discussion issue should also be added about whether Mammo industry attention should be focused on a new profile or on rolling out the recently completed Mammo Acq. Workflow profile. The proposal must reviewed by the Mammography technical subcommittee.
- Enhanced DICOM Objects - Brief Proposal was accepted for the short list.
Call for Proposals
Interested parties were invited to submit proposal pages based on the Brief Proposal Template by Sept 15, 2008.