Difference between revisions of "SWF.b FT Evaluation"
Jump to navigation
Jump to search
Stevenichols (talk | contribs) |
Stevenichols (talk | contribs) |
||
Line 6: | Line 6: | ||
* Are all significant CPs against the profile "closed"? | * Are all significant CPs against the profile "closed"? | ||
− | |||
* Are all significant CPs against the underlying standards "closed"? | * Are all significant CPs against the underlying standards "closed"? | ||
− | |||
* Have all significant comments been CP'd or rejected? | * Have all significant comments been CP'd or rejected? | ||
− | |||
* Have all open issues listed in the Supplement been closed? | * Have all open issues listed in the Supplement been closed? | ||
− | |||
* Have all significant issues at Connectathon been dealt with? | * Have all significant issues at Connectathon been dealt with? | ||
:* After checking with Lynn Felhofer, all connectathon issues have been addressed through CPs | :* After checking with Lynn Felhofer, all connectathon issues have been addressed through CPs | ||
* Gather feedback from implementers via a [ftp://ftp.ihe.net/Connectathon/IHE%20Vendor%20Questionnaire%20V0.4.doc formal questionnaire to Connectathon participants] | * Gather feedback from implementers via a [ftp://ftp.ihe.net/Connectathon/IHE%20Vendor%20Questionnaire%20V0.4.doc formal questionnaire to Connectathon participants] | ||
− | |||
* Has the Connectathon Project Manager been queried and significant issues addressed? | * Has the Connectathon Project Manager been queried and significant issues addressed? | ||
− | |||
== Technical Committee Consensus== | == Technical Committee Consensus== |
Revision as of 09:14, 14 November 2019
Proposal
The Scheduled Workflow.b profile has been nominated for advancement to Final Text. (Advocate: Steve Nichols) Per the Final Text Process, Items in blue text below warrant Committee discussion.
Technical Committee Checklist
- Are all significant CPs against the profile "closed"?
- Are all significant CPs against the underlying standards "closed"?
- Have all significant comments been CP'd or rejected?
- Have all open issues listed in the Supplement been closed?
- Have all significant issues at Connectathon been dealt with?
- After checking with Lynn Felhofer, all connectathon issues have been addressed through CPs
- Gather feedback from implementers via a formal questionnaire to Connectathon participants
- Has the Connectathon Project Manager been queried and significant issues addressed?
Technical Committee Consensus
- The Technical Committee agreed to continue with the Final Text Process and continue with an evaluation by the Planning Committee
Planning Committee Checklist
- Has the profile been through a Connectathon in at least two regions?
- Has the profile been successfully tested with all actors at least at one Connectathon?
- Have different implementations of each actor in the profile been tested?
- Have all the options been tested successfully at at least one Connectathon?
- Have the standards underlying the profile been implemented? In similar use cases? In healthcare? In general IT?
- (Do you have concrete reason to believe that this works robustly in the Real World) / (Are any products available for purchase that implement the profile?)
- Have all issues that may have been raised about the profile been resolved?
- Has there been sufficient interest in the profile to generate a one-page overview of the profile