Difference between revisions of "SWF.b FT Evaluation"

From IHE Wiki
Jump to navigation Jump to search
Line 6: Line 6:
  
 
* Are all significant CPs against the profile "closed"
 
* Are all significant CPs against the profile "closed"
::* Yes, however, do we need to update notes and status of SWF/SWF.b CP in the '''[https://docs.google.com/spreadsheets/d/1TmSwnn4AIiXqFLc_AtzP0dNd9LUWnA-ZcCjBMKpLzp4/edit?usp=sharing CP Tracking Spreadsheet]'''?
+
::* Yes, however, <font color="blue">do we need to update notes and status of SWF/SWF.b CP in the '''[https://docs.google.com/spreadsheets/d/1TmSwnn4AIiXqFLc_AtzP0dNd9LUWnA-ZcCjBMKpLzp4/edit?usp=sharing CP Tracking Spreadsheet]'''?
 
:::* CP-RAD-224
 
:::* CP-RAD-224
 
:::* CP-RAD-228
 
:::* CP-RAD-228
Line 15: Line 15:
 
:::* CP-RAD-353
 
:::* CP-RAD-353
 
:::* CP-RAD-354
 
:::* CP-RAD-354
:::* CP-RAD-422
+
:::* CP-RAD-422</font>
  
 
* Are all significant CPs against the underlying standards "closed"?
 
* Are all significant CPs against the underlying standards "closed"?

Revision as of 09:46, 15 November 2019

Proposal

The Scheduled Workflow.b profile has been nominated for advancement to Final Text. (Advocate: Steve Nichols) Per the Final Text Process, Items in blue text below warrant Committee discussion.

Technical Committee Checklist

  • Are all significant CPs against the profile "closed"
  • CP-RAD-224
  • CP-RAD-228
  • CP-RAD-232
  • CP-RAD-257
  • CP-RAD-299
  • CP-RAD-343
  • CP-RAD-353
  • CP-RAD-354
  • CP-RAD-422
  • Are all significant CPs against the underlying standards "closed"?
  • Yes
  • Have all significant comments been CP'd or rejected?
  • Yes
  • Have all open issues listed in the Supplement been closed?
  • Yes
  • Have all significant issues at Connectathon been dealt with?
  • Yes
  • After checking with Lynn Felhofer, all connectathon issues have been addressed through CPs
  • Yes

Technical Committee Consensus

  • The Technical Committee agreed to continue with the Final Text Process and continue with an evaluation by the Planning Committee

Planning Committee Checklist

  • Has the profile been through a Connectathon in at least two regions?
  • Yes
  • Has the profile been successfully tested with all actors at least at one Connectathon?
  • Yes
  • Have different implementations of each actor in the profile been tested?
  • Yes
  • Have all the options been tested successfully at at least one Connectathon?
  • Yes
  • Have the standards underlying the profile been implemented? In similar use cases? In healthcare? In general IT?
  • (Do you have concrete reason to believe that this works robustly in the Real World) / (Are any products available for purchase that implement the profile?)
  • Have all issues that may have been raised about the profile been resolved?
  • Yes