Difference between revisions of "SWF.b FT Evaluation"
Jump to navigation
Jump to search
Stevenichols (talk | contribs) |
Stevenichols (talk | contribs) |
||
Line 6: | Line 6: | ||
* Are all significant CPs against the profile "closed" | * Are all significant CPs against the profile "closed" | ||
− | ::* Yes, however, do we need to update notes and status of SWF/SWF.b CP in the '''[https://docs.google.com/spreadsheets/d/1TmSwnn4AIiXqFLc_AtzP0dNd9LUWnA-ZcCjBMKpLzp4/edit?usp=sharing CP Tracking Spreadsheet]'''? | + | ::* Yes, however, <font color="blue">do we need to update notes and status of SWF/SWF.b CP in the '''[https://docs.google.com/spreadsheets/d/1TmSwnn4AIiXqFLc_AtzP0dNd9LUWnA-ZcCjBMKpLzp4/edit?usp=sharing CP Tracking Spreadsheet]'''? |
:::* CP-RAD-224 | :::* CP-RAD-224 | ||
:::* CP-RAD-228 | :::* CP-RAD-228 | ||
Line 15: | Line 15: | ||
:::* CP-RAD-353 | :::* CP-RAD-353 | ||
:::* CP-RAD-354 | :::* CP-RAD-354 | ||
− | :::* CP-RAD-422 | + | :::* CP-RAD-422</font> |
* Are all significant CPs against the underlying standards "closed"? | * Are all significant CPs against the underlying standards "closed"? |
Revision as of 09:46, 15 November 2019
Proposal
The Scheduled Workflow.b profile has been nominated for advancement to Final Text. (Advocate: Steve Nichols) Per the Final Text Process, Items in blue text below warrant Committee discussion.
Technical Committee Checklist
- Are all significant CPs against the profile "closed"
- Yes, however, do we need to update notes and status of SWF/SWF.b CP in the CP Tracking Spreadsheet?
- CP-RAD-224
- CP-RAD-228
- CP-RAD-232
- CP-RAD-257
- CP-RAD-299
- CP-RAD-343
- CP-RAD-353
- CP-RAD-354
- CP-RAD-422
- Are all significant CPs against the underlying standards "closed"?
- Yes
- Have all significant comments been CP'd or rejected?
- Yes
- Have all open issues listed in the Supplement been closed?
- Yes
- Have all significant issues at Connectathon been dealt with?
- Yes
- After checking with Lynn Felhofer, all connectathon issues have been addressed through CPs
- Gather feedback from implementers via a formal questionnaire to Connectathon participants
- Has the Connectathon Project Manager been queried and significant issues addressed?
- Yes
Technical Committee Consensus
- The Technical Committee agreed to continue with the Final Text Process and continue with an evaluation by the Planning Committee
Planning Committee Checklist
- Has the profile been through a Connectathon in at least two regions?
- Yes
- Has the profile been successfully tested with all actors at least at one Connectathon?
- Yes
- Have different implementations of each actor in the profile been tested?
- Yes
- Have all the options been tested successfully at at least one Connectathon?
- Yes
- Have the standards underlying the profile been implemented? In similar use cases? In healthcare? In general IT?
- (Do you have concrete reason to believe that this works robustly in the Real World) / (Are any products available for purchase that implement the profile?)
- Have all issues that may have been raised about the profile been resolved?
- Yes
- Has there been sufficient interest in the profile to generate a one-page overview of the profile