Rad Tech Minutes 2021-11-07-11
Jump to navigation
Jump to search
- Attendance List
- Kevin O'Donnell
- David Kwan
- Khalid Younis
- Andrei Leontiev
- Wim
- Brad Genereaux
- Lynn Felhofer
- Steve Nichols
- Jonathan Whitby
- Kinson Ho
- Matt Hayes
- Eric Martin - Guest
- Jamie Dulkowski
- TeRhonda McGee
Profile Name: Reporting Worklist Prioritization
- Describe gaps in Use Case coverage
- Feels complete (currently)
- Review ALL "uncertainty points" in the evaluation. Is there a resolution plan for each?
- Done. Yes.
- Do the effort points in the evaluation still seem right?
- Did the Breakdown of Tasks accurately reflect the work? What extra tasks arose?
- Describe unresolved technical issues/tasks
- Describe potential practical issues
- Review the open issue list. Does it feel complete
- Need to move some notes up into open issues. Otherwise OK?
- Which open issues feel most risky; what other risks exist?
- How is the work fitting in the allocated bandwidth? (Time to spare? Just right? Things were left undone?)
- Time to spare (at this stage)
- How does the scope feel? (Room to expand? Just right? Pretty ambitious?)
- Right
- If you had to reduce scope, what would you drop?
- Patient History, Imaging Priors, Lab/Path feeds. May still end up with those out of scope.
- Have the promised resources manifested?
- Mostly. Will follow up with radiology input.
- What tasks would benefit from additional expertise?
- More reporting worklist vendors
- What vendors are engaged for each actor? Record how many.
- Was the profile where it needed to be at the start of the Kickoff meeting (See "Kickoff Meeting" above), if not what was the gap
- Yes
- Was the profile where it needed to be at the end of the Kickoff meeting, if not what was the gap
- Yes (being small and focused helps)
- How many tcons would you like between now and the PC Prep Meeting?
- Maybe 1 or 2 in January
Profile Name:
- Describe gaps in Use Case coverage
- Review ALL "uncertainty points" in the evaluation. Is there a resolution plan for each?
- Do the effort points in the evaluation still seem right?
- Did the Breakdown of Tasks accurately reflect the work? What extra tasks arose?
- Describe unresolved technical issues/tasks
- Describe potential practical issues
- Review the open issue list. Does it feel complete
- Which open issues feel most risky; what other risks exist?
- How is the work fitting in the allocated bandwidth? (Time to spare? Just right? Things were left undone?)
- How does the scope feel? (Room to expand? Just right? Pretty ambitious?)
- If you had to reduce scope, what would you drop?
- Have the promised resources manifested?
- What tasks would benefit from additional expertise?
- What vendors are engaged for each actor? Record how many.
- Was the profile where it needed to be at the start of the Kickoff meeting (See "Kickoff Meeting" above), if not what was the gap
- Was the profile where it needed to be at the end of the Kickoff meeting, if not what was the gap
- How many tcons would you like between now and the PC Prep Meeting?