Difference between revisions of "Rad Tech Minutes 2020-11-05"
Jump to navigation
Jump to search
(Created page with "Limited participation due to European Connect-a-thon. Participants: Andrei, Wim, Chris Lindop, Steve Nichols, Nicole *Reviewed Assigned CPs (https://drive.google.com/drive/fol...") |
|||
Line 1: | Line 1: | ||
Limited participation due to European Connect-a-thon. | Limited participation due to European Connect-a-thon. | ||
− | Participants: Andrei, Wim, Chris Lindop, Steve Nichols, | + | Participants: Andrei Leontiev, Wim Corbijn, Chris Lindop, Steve Nichols, Nichole Knox |
*Reviewed Assigned CPs (https://drive.google.com/drive/folders/1CFxL_FrInp4mmQ5Zy-z3zfQBEbyZe9fv): | *Reviewed Assigned CPs (https://drive.google.com/drive/folders/1CFxL_FrInp4mmQ5Zy-z3zfQBEbyZe9fv): | ||
**CP-RAD-438 - SWF.b – Enterprise Identity Clarification for RAD-14 Matching & Return Keys (Andrei) | **CP-RAD-438 - SWF.b – Enterprise Identity Clarification for RAD-14 Matching & Return Keys (Andrei) | ||
*Andrei to prepare agenda for maintenance sessions at F2F | *Andrei to prepare agenda for maintenance sessions at F2F | ||
*No CP call in December during RSNA. The schedule for 2021 to be confirmed at F2F | *No CP call in December during RSNA. The schedule for 2021 to be confirmed at F2F |
Latest revision as of 11:35, 5 November 2020
Limited participation due to European Connect-a-thon. Participants: Andrei Leontiev, Wim Corbijn, Chris Lindop, Steve Nichols, Nichole Knox
- Reviewed Assigned CPs (https://drive.google.com/drive/folders/1CFxL_FrInp4mmQ5Zy-z3zfQBEbyZe9fv):
- CP-RAD-438 - SWF.b – Enterprise Identity Clarification for RAD-14 Matching & Return Keys (Andrei)
- Andrei to prepare agenda for maintenance sessions at F2F
- No CP call in December during RSNA. The schedule for 2021 to be confirmed at F2F