Rad Tech Minutes 2008.03.31-04.02

From IHE Wiki
Revision as of 13:30, 9 April 2008 by Calevy (talk | contribs) (New page: '''Radiology Technical Committee and Mammography Subcommittee Meeting''' '''March 31-April 3, 2008''' '''Oak Brook, IL ''' == '''Attendees:''' == Cindy Levy, Radiology Technical Co-ch...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Radiology Technical Committee and Mammography Subcommittee Meeting March 31-April 3, 2008 Oak Brook, IL

Attendees:

Cindy Levy, Radiology Technical Co-chair Dick Donker, Philips Richard Ellis, MD, Gundersen Lutheran Medical Center Lynn Felhofer, MIR Project Manager Christoph Dickmann, Siemens David Heaney, McKesson Renate Hocker, Siemens Chris Lindop, GE Jamie Ma, Candelis Paul Morgan , FujiFilm Kevin O’Donnell, Toshiba Guillaume Peter, GE Paul Seifert, Agfa Chris Carr, RSNA Nichole Drye-Mayo, RSNA

Via Tcon Ana Estelrich, GIP Penny Butler, ACR Laura Coombs, PhD, ACR Keith Klassy, Emageon Andrei Leontiev, GE Peter MacIsaac, IHE Australia Richard Morin, ACR John Paganini, Guardian Technologies Tony Palmer, GE

Radiation Exposure Monitoring (REM)

  • Comment Overview:
    • Feedback Internationally from Spain
    • Did send it to other International Organizations (no comments back)
    • No Comments through RSNA
    • No Comments back through Australia
    • Only IHE Committee providing comments is ACC
  • Template Comments – Include section number first (Line numbers change)
  • Review Consolidated REM Comments. (See Comments)
  1. DICOM Dose Summit Proposed with Product Managers. The timing of this needs to be within the next couple of months to sync up with the IHE Radiation Exposure Profile.
  2. Dick Donker to contact Prof Hacklaender about Dose Information for Germany.


IHE SWF II Discussion

  • Review of SWF II Use Case Document – Document Updates. On-going discussion required.


PDI DVD/USB Option Discussion

  • Review of PDI DVD/USB Option Straw man Document – Developed Issues to resolve.
  1. USB media is currently FAT 16 or FAT 32. FAT 16 is limited to 4Gigabyte. Currently limited by DICOM. IHE Technical Committee recommends putting in DICOM work item (Dave Heaney)
  2. Determine if DICOM CP required for additional fields specified in DICOM DVD will cause an incompatibility with DICOM GEN-CD Profile. (Dave Heaney)

IHE Mammography Acquisition Workflow Discussion

  • Review of Mammography Acquisition Workflow Supplement to finalize the Trial
  • Review of Mammography Acquisition Procedure Codes – from Clinicians
  • Review of Updated Reason for Requested Procedure Code table.
  • Implementation version. See Comments List for complete set of Actions to be done.
  1. DICOM CP to replace the terminology of “Clip” to “Marker:, and use this word consistently throughout the system (and IHE MAWF Supplement) (Dave Heaney)
  2. DICOM CP to add 4 codes (Christoph has the list; work with Dave Heaney).


IHE CP Discussion

Review of CPs

  • CP for Ballot : 93, 109,135 136, 138
  • CP 53 – Back into Assigned. Paul Morgan continue to work with the Mammography group on the Print piece.
  • CP 113 – Updated for Committee to review
  • CP 118 – Updated for Committee to review


Philosophy of how TF is put together

  • Discussion with Steve Moore – prefers not to bounce around between transactions is Volume 2 and have information in Volume 1 pointing to Volume 2.
  • Perhaps look at Transaction sub-classing

Administrative

Calendar:

  • April 8 – 10 – 12 CT CP Review
  • April 11 – Completed CPs for TFv9.0 released for Ballot.
  • April 17 – 10-12CT MAWF Supplement T-Con to complete open issues
  • April 22 – 10-12 CT REM Supplement T-Con to complete open issues
  • April 30 – Final draft version of Supplements sent to TC for Review
  • May 6 - 10-12CT MAWF Final Supplement Review
  • May 7 – Planning Committee to determine if TCE Profile to be Final Text’d
  • May 9 – 10-12CT REM Final Supplement Review
  • May 11- Ballot for TFv9.0 CPs Closed
  • May 12 – Publication work on TFv9.0 to start
  • May 13 – Final Version of MAWF/REM Supplements to RSNA for Publishing
  • May 15 – MAWF/REM Supplements for Trial Implementation Published - www.ihe.net
  • June 6 – TF v9.0 Final draft version to TC for Review
  • June 17 - 10-12CT T-con to finalize the TFv9.0
  • June 20 - Final Version of TFv9.0 to RSNA for Publishing
  • June 27 – TFv9.0 Published - www.ihe.net


  • Other
    • Dick Donker to assume the role of Volume II Editor (thank you)
    • New Profile Numbers - 22 REM; 23 MAWF
    • New Transaction Numbers 62-65 REM; 66 MAWF

Review Trial Implementation Status

  1. NM – Not Considered due to Planning Committee Input
  2. FUS – Not considered ready for Final Text. Insufficient testing on this Profile.
  3. TCE
  • Technically no outstanding issues
  • No Open CPs
  • Some reservation on limiting testing on some Export Manager and Receiver Actor (this includes such option as pseudonymization).