Difference between revisions of "Rad Plan Agenda 07.10.24"

From IHE Wiki
Jump to navigation Jump to search
(New page: __NOTOC__ ==Role Call== ==Proposal Review== * For each proposal (15 min limit) ** Review Summary and Tech Cmte Evaluation (<5 min) ** Advocacy & Discussion (<10 min) ==Work Package No...)
 
Line 11: Line 11:
  
 
==Work Package Nominations==
 
==Work Package Nominations==
 +
* Conduct straw poll for "top two" profiles to get broad sense of interest/support.
 +
 
* Any voting participant may nominate one or more packages of work
 
* Any voting participant may nominate one or more packages of work
 
** A package of work is a list of proposals and maintenance workitems intended to represent the complete work of the Tech Cmte for the year
 
** A package of work is a list of proposals and maintenance workitems intended to represent the complete work of the Tech Cmte for the year
Line 16: Line 18:
  
 
(This avoids dealing with situations like the top ranked proposal being 60% effort, the second 60% effort and the third 40% effort; or the first 45%, the second 45%, the third 15%, etc.)
 
(This avoids dealing with situations like the top ranked proposal being 60% effort, the second 60% effort and the third 40% effort; or the first 45%, the second 45%, the third 15%, etc.)
 
  
 
==Selection==
 
==Selection==

Revision as of 17:40, 23 October 2007


Role Call

Proposal Review

  • For each proposal (15 min limit)
    • Review Summary and Tech Cmte Evaluation (<5 min)
    • Advocacy & Discussion (<10 min)


Work Package Nominations

  • Conduct straw poll for "top two" profiles to get broad sense of interest/support.
  • Any voting participant may nominate one or more packages of work
    • A package of work is a list of proposals and maintenance workitems intended to represent the complete work of the Tech Cmte for the year
    • A package will usually total around 100% Tech Cmte Bandwidth (see Evaluation estimates)

(This avoids dealing with situations like the top ranked proposal being 60% effort, the second 60% effort and the third 40% effort; or the first 45%, the second 45%, the third 15%, etc.)

Selection

  • Repeat until one Work Package passes 50% of votes
    • Webex poll of nominated work packages
    • Remove bottom scoring packages


Other Business

If time allows:

  • Organize IHE Radiology Domain Application
  • Review preparation for RSNA Classroom presentations